3,540
Views
0
CrossRef citations to date
0
Altmetric
Construction Management

Lifting and transportation in high-rise building construction in Japan: the beginning of integrated lifting and transportation and recent developments

ORCID Icon, &
Pages 502-514 | Received 11 Sep 2019, Accepted 08 Apr 2020, Published online: 13 May 2020

References

  • Araki, M., and K. Yamada. 1971. “Mini-computer System in Construction Site.” Technical Research Report of the Shimizu Institute of Technology. Vol. 18, 189–196. Tokyo: Shimizu Institute of Technology. (in Japanese).
  • Architectural Product-Engineering. 1973. 6, No.92, 28-65, Shokokusha (in Japanese).
  • Architectural Product-Engineering. 1987. 12, No.267, 69-78, Shokokusha (in Japanese).
  • Architectural Product-Engineering. 1989. 5, No. 283, 73-90, Shokokusha (in Japanese).
  • Architectural Product-Engineering. 1974. 7, No.105, 23-40, Shokokusha (in Japanese).
  • Bock, T., and T. Linner. 2016. “Volume 4: Site Automation.” In Automated/Robotic On-Site Factories, Cambridge Handbooks on Construction Robotics. Cambridge University Press. doi:10.1017/CBO9781139872027.
  • CEMA (The Japan Construction Equipment Manufacturers Association). 2010. The 20years History of CEMA. Tokyo: CEMA.  (in Japanese).
  • Dobashi, T., T. Uenami, and T. Yoshida. 2001. “Development of the Management Method in the Physical Distribution of Construction materials–A Simulation Method in Physical Distribution.” In Proceedings of the Seventeenth Symposium on Building Construction and Management of Projects, 207–212. Tokyo: Architectural Institute of Japan. (in Japanese).
  • Eguchi, T., and A. Ichimura. 1997. “Comparison of Conveying Systems in Several Automated Building Construction Systems.” In 11th Construction Robot Symposium, 63–69. Tokyo: Architectural Institute of Japan. (in Japanese).
  • Gondo, T. 2018. Building System Kasumigaksei Building, 250–287. Tokyo: Mitsui Fudosan. (in Japanese).
  • Jalali Yazdi, A., M. Maghrebi, and J. Bolouri Bazaz. 2018. “Mathematical Model to Optimally Solve the Lift Planning Problem in High-rise Construction Projects.” Automation in Construction 92: 120–132. doi:10.1016/j.autcon.2018.03.029.
  • Kajima Corporation. 2003. The History of Kajima Corporation 19702000. Tokyo: Kajima Corporation. (in Japanese).
  • Kano, N. 2009. “Seko-shi.” [Construction History] In BCS Prize-winning Works 19602009, 148–171. Tokyo: Shinkenchikusha. (in Japanese).
  • Kurosaka, M., R. Miura, Y. Matsumoto, and T. Gondo. 2018. “Transition of Construction of the Skyscraper in Japan-Productivity in the Lifting and Transportation.” In Proceedings of the Thirty-Fourth Symposium on Building Construction and Management of Projects, 141–146. Tokyo: Architectural Institute of Japan.  (in Japanese).
  • Matsumoto, T. 1997. “A Study of the Method of Planning to the Vertical Transportation of Building Materials for Highrise Building Construction.” AIJ Journal of Technology and Design 5: 27–30. Architectural Institute of Japan. (in Japanese). doi:10.3130/aijt.3.27.
  • Nikai, S. 1974. Vol.4 Construction. Series of Skyscrapers. Tokyo: Research Institute of Kajima. (in Japanese).
  • Nikai, S., and Y. Tamura. 1969. “New Construction Management system–Report on Kasumigaseki Building 2.” Architectural Product-Engineering 6: 79–87. Shokokusha (in Japanese).
  • Obayashi Corporation. 1993. The 100 Years History of Obayashi Corporation. Tokyo: Obayashi Corporation. (in Japanese).
  • Park, M., S. Ha, H. Lee, Y. Choi, H. Kim, and S. Han. 2013. “Lifting Demand-based Zoning for Minimizing Worker Vertical Transportation Time in High-rise Building Construction.” Automation in Construction 32: 88–95. doi:10.1016/j.autcon.2013.01.010.
  • Sawaguchi, M. 1996. Special Issue: Rationalization of Transportation and Construction Management. Vol. 3. Tokyo: Kenchiku Gijutsu. (in Japanese).
  • Shimizu Corporation. 2003. The 200 Years History of Shimizu Corporation. Tokyo: Shimizu Corporation. (in Japanese).
  • Shiokawa, T., T. Ohkawa, and T. Mori. 1994. “Development of an Automated Building Construction System.” Report of Obayashi Corporation Technical Research Institute, No.49, 1–6. Tokyo: Obayashi Corporation Technical Research Institute
  • Taisei Corporation. 2003. The 140 Years History of Taisei Corporation. Tokyo: Taisei Corporation. (in Japanese).
  • Takenaka Corporation. 1989. The 90 Years History of Takenaka Corporation. Tokyo: Takenaka Corporation. (in Japanese).
  • Tsuzura, T., K. Yukutake, and Y. Sato. 1990. “Development of a Computer-aided Vertical Transportation System for High-rise Construction.” In Proceedings of the Sixteenth Symposium on Building Construction and Management of Projects, 91–96. Tokyo: Architectural Institute of Japan. (in Japanese).
  • Yamazaki, Y. 2015. “Evolution of Construction and Management Technologies in Super Highrise Buildings with Hybrid Building Structures.” In Architectural Production Seminar, 1–8. Tokyo: Architectural Institute of Japan. (in Japanese).
  • Yoshida, N., T. Kanagawa, Y. Tani, and Y. Oda. 1997. “Development of an Automatic-oriented Sheltered Building Construction System.” In Proceedings of the Fourteenth International Symposium on Automation and Robotics in Construction, 129–138. Pittsburgh (USA): IAARC.