2,156
Views
3
CrossRef citations to date
0
Altmetric
Construction Management

Applying a new systematic fuzzy FMEA technique for risk management in light steel frame systems

ORCID Icon, , , &
Pages 2481-2502 | Received 19 Feb 2021, Accepted 18 Aug 2021, Published online: 23 Sep 2021

References

  • Abdelgawad, M., and A. R. Fayek. 2010. “Risk Management in the Construction Industry Using Combined Fuzzy FMEA and Fuzzy AHP.” Journal of Construction Engineering and Management 136 (9): 1028–1036. doi:10.1061/(ASCE)CO.1943-7862.0000210.
  • Abrahamsen, H. B., E. B. Abrahamsen, and S. Høyland. 2016. “On the Need for Revising Healthcare Failure Mode and Effect Analysis for Assessing Potential for Patient Harm in Healthcare Processes.” Reliability Engineering & System Safety 155: 160–168. doi:10.1016/j.ress.2016.06.011.
  • Ahmadi, M., K. Behzadian, A. Ardeshir, and Z. Kapelan. 2017. “Comprehensive Risk Management Using Fuzzy FMEA and MCDA Techniques in Highway Construction Projects.” Journal of Civil Engineering and Management 23 (2): 300–310. doi:10.3846/13923730.2015.1068847.
  • Asadi, P., J. R. Zeidi, T. Mojibi, A. Yazdani-Chamzini, and J. Tamošaitienė. 2018. “Project Risk Evaluation by Using a New Fuzzy Model Based on Elena Guideline.” Journal of Civil Engineering and Management 24 (4): 284–300. doi:10.3846/jcem.2018.3070.
  • Ashley, D. B., J. E. Diekmann, and K. R. Molenaar. 2006. Guide to Risk Assessment and Allocation for Highway Construction Management. US Department of Transportation, Federal Highway Administration.
  • Baghery, M., S. Yousefi, and M. J. Rezaee. 2018. “Risk Measurement and Prioritization of Auto Parts Manufacturing Processes Based on Process Failure Analysis, Interval Data Envelopment Analysis and Grey Relational Analysis.” Journal of Intelligent Manufacturing 29 (8): 1803–1825. doi:10.1007/s10845-016-1214-1.
  • Balaraju, J., M. G. Raj, and C. S. Murthy. 2019. “Fuzzy-FMEA Risk Evaluation Approach for LHD machine–A Case Study.” Journal of Sustainable Mining 18 (4): 257–268. doi:10.1016/j.jsm.2019.08.002.
  • Banobi, T., and W. Jung. 2019. “Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Project.” Sustainability 11 (21): 5973. doi:10.3390/su11215973.
  • Bari, N. A. A., R. Yusuff, N. Ismail, A. Jaapar, and R. Ahmad. 2012. “Factors Influencing the Construction Cost of Industrialised Building System (IBS) Projects.” Procedia - Social and Behavioral Sciences 35: 689–696. doi:10.1016/j.sbspro.2012.02.138.
  • Barnard, D. 2011. Light Steel Construction and Modular Homes as Alternative Building Methods in South Africa. South Africa: University of Pretoria.
  • Bowles, J. B., and C. E. Peláez. 1995. “Fuzzy Logic Prioritization of Failures in a System Failure Mode, Effects and Criticality Analysis.” Reliability Engineering & System Safety 50 (2): 203–213. doi:10.1016/0951-8320(95)00068-D.
  • Braaksma, A. J. J., W. Klingenberg, and J. Veldman. 2013. “Failure Mode and Effect Analysis in Asset Maintenance: A Multiple Case Study in the Process Industry.” International Journal of Production Research 51 (4): 1055–1071. doi:10.1080/00207543.2012.674648.
  • Celik, T., and S. Kamali. 2018. “Multidimensional Comparison of Lightweight Steel and Reinforced Concrete Structures: A Case Study.” Tehnicki Vjesnik 25 (4): 1234-1242.
  • Chan, A. P. C., D. W. M. Chan, and J. F. Y. Yeung. 2009. “Overview of the Application of Fuzzy Techniques in Construction Management Research.” Journal of Construction Engineering and Management 135 (11): 1241–1252. doi:10.1061/(ASCE)CO.1943-7862.0000099.
  • Chanamool, N., and T. Naenna. 2016. “Fuzzy FMEA Application to Improve Decision-making Process in an Emergency Department.” Applied Soft Computing 43: 441–453. doi:10.1016/j.asoc.2016.01.007.
  • Cheng, M., and Y. Lu. 2015. “Developing a Risk Assessment Method for Complex Pipe Jacking Construction Projects.” Automation in Construction 58: 48–59. doi:10.1016/j.autcon.2015.07.011.
  • Chin, K.-S., A. Chan, and J.-B. Yang. 2008. “Development of a Fuzzy FMEA Based Product Design System.” The International Journal of Advanced Manufacturing Technology 36 (7–8): 633–649. doi:10.1007/s00170-006-0898-3.
  • Chin, K.-S., Y.-M. Wang, G. K. K. Poon, and J.-B. Yang. 2009. “Failure Mode and Effects Analysis Using a Group-based Evidential Reasoning Approach.” Computers & Operations Research 36 (6): 1768–1779. doi:10.1016/j.cor.2008.05.002.
  • Choudhry, R. M., and K. Iqbal. 2013. “Identification of Risk Management System in Construction Industry in Pakistan.” Journal of Management in Engineering 29 (1): 42–49. doi:10.1061/(ASCE)ME.1943-5479.0000122.
  • Darcy, G., and M. Mahendran. 2008. “Development of a New Cold-Formed Steel Building System.” Advances in Structural Engineering 11 (6): 661–677. doi:10.1260/136943308787543621.
  • Dey, P. K. 2010. “Managing Project Risk Using Combined Analytic Hierarchy Process and Risk Map.” Applied Soft Computing 10 (4): 990–1000. doi:10.1016/j.asoc.2010.03.010.
  • Dey, P. K. 2012. “Project Risk Management Using Multiple Criteria Decision-making Technique and Decision Tree Analysis: A Case Study of Indian Oil Refinery.” Production Planning & Control 23 (12): 903–921. doi:10.1080/09537287.2011.586379.
  • Dosumu, O., and C. O. Aigbavboa. 2018. “Adoption of Light Steel (LS) for Building Projects in South Africa.” Journal of Engineering, Design and Technology 16 (5): 711–733. doi:10.1108/JEDT-04-2018-0075.
  • Eren, Ö. 2013. “A Comparison with Light Steel Frame Constructional Building Systems for Housing.” World Applied Sciences Journal 25 (3): 354-368.
  • Fallah, M. H. 2005. “Sustainable Building Construction“. World Sustainable Building Conference. https://www.irbnet.de/daten/iconda/CIB3980.pdf
  • Fiorino, L., O. Iuorio, and R. Landolfo. 2014. “Designing CFS Structures: The New School Bfs in Naples.” Thin-Walled Structures 78: 37–47. doi:10.1016/j.tws.2013.12.008.
  • Forcael, E., H. Morales, D. Agdas, C. Rodríguez, and C. León. 2018. “Risk Identification in the Chilean Tunneling Industry.” Engineering Management Journal 30 (3): 203–215. doi:10.1080/10429247.2018.1484266.
  • Franklin, N., E. Heffernan, and T. McCarthy 2020. “The Case for Cold-Formed Steel Construction for the Mid-Rise Residential Sector in Australia: A Survey of International CFS Professionals“. Proc., ACMSM25, Springer Singapore, 841–851.
  • Gargama, H., and S. K. Chaturvedi. 2011. “Criticality Assessment Models for Failure Mode Effects and Criticality Analysis Using Fuzzy Logic.” IEEE Transactions on Reliability 60 (1): 102–110. doi:10.1109/TR.2010.2103672.
  • Goh, C. S., H. Abdul-Rahman, and Z. A. Samad. 2013. “Applying Risk Management Workshop for a Public Construction Project: Case Study.” Journal of Construction Engineering and Management 139 (5): 572–580. doi:10.1061/(ASCE)CO.1943-7862.0000599.
  • Iqbal, S., R. M. Choudhry, K. Holschemacher, A. Ali, and J. Tamošaitienė. 2015. “Risk Management in Construction Projects.” Technological and Economic Development of Economy 21 (1): 65–78. doi:10.3846/20294913.2014.994582.
  • Iuorio, O., L. Fiorino, and R. Landolfo. 2014. “Testing CFS Structures: The New School BFS in Naples.” Thin-Walled Structures 84: 275–288. doi:10.1016/j.tws.2014.06.006.
  • Jatheeshan, V., and M. Mahendran. 2015. “Numerical Study of LSF Floors Made of Hollow Flange Channels in Fire.” Journal of Constructional Steel Research 115: 236–251. doi:10.1016/j.jcsr.2015.08.021.
  • Jee, T. L., K. M. Tay, and C. P. Lim. 2015. “A New Two-Stage Fuzzy Inference System-Based Approach to Prioritize Failures in Failure Mode and Effect Analysis.” IEEE Transactions on Reliability 64 (3): 869–877. doi:10.1109/TR.2015.2420300.
  • Jong, C. H., K. M. Tay, and C. P. Lim. 2013. “Application of the Fuzzy Failure Mode and Effect Analysis Methodology to Edible Bird Nest Processing.” Computers and Electronics in Agriculture 96: 90–108. doi:10.1016/j.compag.2013.04.015.
  • Kang, J., L. Sun, H. Sun, and C. Wu. 2017. “Risk Assessment of Floating Offshore Wind Turbine Based on correlation-FMEA.” Ocean Engineering 129: 382–388. doi:10.1016/j.oceaneng.2016.11.048.
  • Kerk, Y. W., C. Y. Teh, K. M. Tay, and C. P. Lim. 2021. “Parametric Conditions for a Monotone TSK Fuzzy Inference System to Be an n-Ary Aggregation Function.” IEEE Transactions on Fuzzy Systems 29 (7): 1864–1873.
  • Khalifa, Y. A., M. Campidelli, M. J. Tait, and W. W. El-Dakhakhni. 2020. “Mitigating Risk of Confined Explosion via Lightweight Sacrificial Cladding.” Journal of Performance of Constructed Facilities 34 (1): 1. doi:10.1061/(ASCE)CF.1943-5509.0001331.
  • Kim, B.-Y., and Y.-S. Kim. 2012. “The Analysis of the Major Cost-increasing Risk Factors from the Perspective of Construction Management-focusing on Pre-construction Phases.” Korean Journal of Construction Engineering and Management 13 (2): 147–155. doi:10.6106/KJCEM.2012.13.2.147.
  • Kumru, M., and P. N. Y. L. Z. Kumru. 2013. “Fuzzy FMEA Application to Improve Purchasing Process in a Public Hospital.” Applied Soft Computing 13 (1): 721–733. doi:10.1016/j.asoc.2012.08.007.
  • Li, H. X., M. Al-Hussein, Z. Lei, and Z. Ajweh. 2013. “Risk Identification and Assessment of Modular Construction Utilizing Fuzzy Analytic Hierarchy Process (AHP) and Simulation.” Canadian Journal of Civil Engineering 40 (12): 1184-1195.
  • Li, X., J. Wang, X. Meng, and J. Wang. 2014. “Comparison and Analysis of Lightweight Steel Structure Residential Housing.„  In International Conference on Mechatronics Control and Electronic Engineering (MCE 2014), pp. 720-721. 2014.
  • Liu, H.-C., X.-Q. Chen, C.-Y. Duan, and Y.-M. Wang. 2019. “Failure Mode and Effect Analysis Using Multi-criteria Decision Making Methods: A Systematic Literature Review.” Computers & Industrial Engineering 135: 881–897. doi:10.1016/j.cie.2019.06.055.
  • Liu, J., X. Zhao, and P. Yan. 2016. “Risk Paths in International Construction Projects: Case Study from Chinese Contractors.” Journal of Construction Engineering and Management 142 (6): 05016002. doi:10.1061/(ASCE)CO.1943-7862.0001116.
  • LSK. 2007. European Lightweight Steel-framed Construction. Sweden: European Light Steel Construction Association.
  • Lu, W., K. Chen, F. Xue, and W. Pan. 2018. “Searching for an Optimal Level of Prefabrication in Construction: An Analytical Framework.” Journal of Cleaner Production 201: 236–245. doi:10.1016/j.jclepro.2018.07.319.
  • Luo, L.-Z., C. Mao, L.-Y. Shen, and Z.-D. Li. 2015. “Risk Factors Affecting Practitioners’ Attitudes toward the Implementation of an Industrialized Building System: A Case Study from China.” Engineering, Construction and Architectural Management 22 (6): 622–643. doi:10.1108/ECAM-04-2014-0048.
  • Ma, G., and M. Wu. 2019. “A Big Data and FMEA-based Construction Quality Risk Evaluation Model considering Project Schedule for Shanghai Apartment Projects.” International Journal of Quality & Reliability Management 37 (1): 18–33. doi:10.1108/IJQRM-11-2018-0318.
  • Mahdavinejad, M. J., M. Hajian, and A. Doroodgar. 2012. “Modeling of LSF Technology in Building Design and Construction Case-Study: Parand Residential Complex, Iran.” Advanced Materials Research 341-342: 447–451. doi:10.4028/scientific.net/AMR.341-342.447.
  • Mehdizadeh, R., T. Franck, B. Denys, and N. Halidou. 2012. “Methodology and Tools for Risk Evaluation in Construction Projects Using Risk Breakdown Structure.” European Journal of Environmental and Civil Engineering 16 (sup1): s78–s98. doi:10.1080/19648189.2012.681959.
  • Meng Tay, K., and C. Peng Lim. 2006. “Fuzzy FMEA with a Guided Rules Reduction System for Prioritization of Failures.” International Journal of Quality & Reliability Management 23 (8): 1047–1066. doi:10.1108/02656710610688202.
  • Mustafa, M. A., and J. F. Al-Bahar. 1991. “Project Risk Analytic Assessment Using the Hierarchy Process.” IEEE TRANSACTIONS ON ENGINEERING MANAGEMENT 38 (1): 46–52. doi:10.1109/17.65759.
  • Noorzai, E., and M. Golabchi. 2020. “Selecting a Proper Construction System in Small and Medium Mass Housing Projects, considering Success Criteria and Construction Volume and Height.” Journal of Engineering, Design and Technology 18 (4): 883–903. doi:10.1108/JEDT-09-2019-0227.
  • Oduyemi, O., M. Okoroh, and O. S. Fajana. 2016. “Risk Assessment Methods for Life Cycle Costing in Buildings.” Sustainable Buildings 1: 3. doi:10.1051/sbuild/2016005.
  • Paul, S., G. F. Radavelli, and A. R. Da Silva. 2015. “Experimental Evaluation of Sound Insulation of Light Steel Frame Façades that Use Horizontal Inter-stud Stiffeners and Different Lining Materials.” Building and Environment 94: 829–839. doi:10.1016/j.buildenv.2015.08.010.
  • Renuka, S. M., C. Umarani, and S. Kamal. 2014. “A Review on Critical Risk Factors in the Life Cycle of Construction Projects.” Journal of Civil Engineering Research 4 (2): 31-36.
  • Saikah, M., N. Kasim, R. Zainal, N. Sarpin, and M. H. I. A. Rahim. 2017. “Potential Implementation of Light Steel Housing System for Affordable Housing Project in Malaysia.” IOP Conference Series: Materials Science and Engineering 271: 012106. doi:10.1088/1757-899X/271/1/012106.
  • Sang, A. J., K. M. Tay, C. P. Lim, and S. Nahavandi. 2018. “Application of a Genetic-Fuzzy FMEA to Rainfed Lowland Rice Production in Sarawak: Environmental, Health, and Safety Perspectives.” IEEE Access 6: 74628–74647. doi:10.1109/ACCESS.2018.2883115.
  • Santos, P., C. Martins, and L. S. D. Silva. 2014. “Thermal Performance of Lightweight Steel-framed Construction Systems.” Metall. Res. Technol 111(6): 329-338.
  • Schafer, B. W. 2011. “Cold-formed Steel Structures around the World.” Steel Construction 4 (3): 141–149. doi:10.1002/stco.201110019.
  • Seifi Azad Mard, H. R., A. Estiri, P. Hadadi, and M. Seifi Azad Mard. 2017. “Occupational Risk Assessment in the Construction Industry in Iran.” International Journal of Occupational Safety and Ergonomics 23 (4): 570–577. doi:10.1080/10803548.2016.1264715.
  • Seyedhoseini, S. M., S. Noori, and M. A. Hatefi. 2009. “An Integrated Methodology for Assessment and Selection of the Project Risk Response Actions.” Risk Analysis : An Official Publication of the Society for Risk Analysis 29 (5): 752–763. doi:10.1111/j.1539-6924.2008.01187.x.
  • Shi, S., and J. Yu. 2009. “Development of Chinese Light Steel Construction Residential Buildings.” Journal of Sustainable Development 2 (3). doi:10.5539/jsd.v2n3p134.
  • Soares, N., A. R. Gaspar, P. Santos, and J. J. Costa. 2014. “Multi-dimensional Optimization of the Incorporation of PCM-drywalls in Lightweight Steel-framed Residential Buildings in Different Climates.” Energy and Buildings 70: 411–421. doi:10.1016/j.enbuild.2013.11.072.
  • Soares, N., P. Santos, H. Gervásio, J. J. Costa, and L. Simões da Silva. 2017. “Energy Efficiency and Thermal Performance of Lightweight Steel-framed (LSF) Construction: A Review.” Renewable and Sustainable Energy Reviews 78: 194–209. doi:10.1016/j.rser.2017.04.066.
  • Steau, E., and M. Mahendran. 2020. “Thermal Modelling of LSF Floor-ceiling Systems with Varying Configurations.” Fire Safety Journal 118: 103227. doi:10.1016/j.firesaf.2020.103227.
  • Trevathan, J. W., and J. R. Pearse. 2008. “The Effect of Workmanship on the Transmission of Airborne Sound through Light Framed Walls.” Applied Acoustics 69 (2): 127–131. doi:10.1016/j.apacoust.2006.09.001.
  • Veljkovic, M., and B. Johansson. 2006. “Light Steel Framing for Residential Buildings.” Thin-Walled Structures 44 (12): 1272–1279. doi:10.1016/j.tws.2007.01.006.
  • Wang, S. Q., M. F. Dulaimi, and M. Y. Aguria. 2004. “Risk Management Framework for Construction Projects in Developing Countries.” Construction Management and Economics 22 (3): 237–252. doi:10.1080/0144619032000124689.
  • Wang, T., S. Gao, X. Li, and X. Ning. 2018. “A Meta-network-based Risk Evaluation and Control Method for Industrialized Building Construction Projects.” Journal of Cleaner Production 205: 552–564. doi:10.1016/j.jclepro.2018.09.127.
  • Wang, X., and T. C. Hutchinson. 2020. “Evolution of Modal Characteristics of a Mid-rise Cold-formed Steel Building during Construction and Earthquake Testing.” Earthquake Engineering & Structural Dynamics 49 (14): 1539–1558. doi:10.1002/eqe.3316.
  • Wu, D., J. Li, T. Xia, C. Bao, Y. Zhao, and Q. Dai. 2018. “A Multiobjective Optimization Method considering Process Risk Correlation for Project Risk Response Planning.” Information Sciences 467: 282–295. doi:10.1016/j.ins.2018.07.013.
  • Wu, P., Y. Xu, R. Jin, Q. Lu, D. Madgwick, and C. M. Hancock. 2019. “Perceptions Towards Risks Involved in Off-site Construction in the Integrated Design & Construction Project Delivery.” Journal of Cleaner Production 213: 899–914. doi:10.1016/j.jclepro.2018.12.226.
  • Xiahou, X., J. Yuan, Y. Liu, Y. Tang, and Q. Li. 2018. “Exploring the Driving Factors of Construction Industrialization Development in China.” Int J Environ Res Public Health 15(3): 442.
  • Yeh, T.-M., and L.-Y. Chen. 2014. “Fuzzy-based Risk Priority Number in FMEA for Semiconductor Wafer Processes.” International Journal of Production Research 52 (2): 539–549. doi:10.1080/00207543.2013.837984.
  • Yu, C. 2016. Recent Trends in Cold-Formed Steel Construction. Elsevier Science.
  • Yuan, Z., G. Ni, L. Wang, Y. Qiao, C. Sun, N. Xu, and W. Wang. 2020. “Research on the Barrier Analysis and Strength Measurement of a Prefabricated Building Design.” Sustainability 12 (7): 2994. doi:10.3390/su12072994.
  • Zeynalian, M., B. Trigunarsyah, and H. R. Ronagh. 2013. “Modification of Advanced Programmatic Risk Analysis and Management Model for the Whole Project Life Cycle’s Risks.” Journal of Construction Engineering and Management 139 (1): 51–59. doi:10.1061/(ASCE)CO.1943-7862.0000571.
  • Zou, P. X. W., and G. Zhang. 2014. “Managing Risks in Construction Projects: Life Cycle and Stakeholder Perspectives.” International Journal of Construction Management 9 (1): 61–77. doi:10.1080/15623599.2009.10773122.
  • Zou, P. X. W., G. Zhang, and J. Wang. 2007. “Understanding the Key Risks in Construction Projects in China.” International Journal of Project Management 25 (6): 601–614. doi:10.1016/j.ijproman.2007.03.001.