1,089
Views
0
CrossRef citations to date
0
Altmetric
Construction Management

Big data analysis model for predicting operational risk in overseas construction projects

, , &
Pages 2524-2531 | Received 16 Nov 2020, Accepted 11 Nov 2021, Published online: 20 Feb 2022

References

  • Banaitiene, N., and A. Banaitis. 2012. “Risk Management in Construction Projects.” Risk Management - Current Issues and Challenges 429–448. doi:10.5772/51460.
  • Chen, W. L., and C. O. Yang. 2020. “Effective Risk Analysis for Delivering Overseas Engineering Procurement-construction Projects in an Unexplored Market.” IOSR Journal of Business and Management 22(1): 41–55.
  • Dikmen, I., M. T. Birgonul, and S. Han. 2007. “1. Using Fuzzy Risk Assessment to Rate Cost Overrun Risk in International Construction Projects.” International Journal of Project Management 25(5): 494–505. doi:10.1016/j.ijproman.2006.12.002.
  • Flanagan, R., G. Norman, and R. Chapman. 2006. Risk Management and Construction. 2nd ed. Oxford: Blackwell Pub.
  • Han, S. H., H. K. Park, and S. M. Yeom. 2013. “Risk-Integrated Cash Flow Forecasting for Overseas Construction Projects.” KSCE Journal of Civil Engineers 18(4): 875–886. doi:10.1007/s12205-014-0464-8.
  • Ko, Y., and S. Han. 2015. “Development of Construction Performance Monitoring Methodology Using the Bayesian Probabilistic Approach.” Journal of Asian Architecture and Building Engineering 14(1): 73–80. doi:10.3130/jaabe.14.73.
  • Lee, D., K. Jeong, and B. Y. Ryoo. 2019. “Current Status and Future Opportunities for Big Data Research in the Construction Industry.” International Journal of Innovative Technology and Exploring Engineering 8(8): 744–775. https://www.ijitee.org/wp-content/uploads/papers/v8i8s2/H11240688S219.pdf
  • Lee, D. U., and Y. S. Kim. 2003. “A Study on the Cost Risk Analysis Method for Construction Projects.” Korea Journal of Construction Engineering and Management 4(4): 201–2011.
  • Lee, J. H., J. H. Son, and J. S. Yi (2015). “Multilevel Project-oriented Risk-mining Approach for Overseas Construction Project’s Preemptive Action.” CIB W78 Conference 2015. Eindhoven, The Netherlands, 336–343.
  • Mills, A. 2001. “A Systematic Approach to Risk Management for Construction.” Structural Survey 19(5): 245–252. doi:10.1108/02630800110412615.
  • Nasir, D., B. McCabe, and B. Hartono. 2003. “Evaluating Risk in Construction–Schedule Model (ERIC–S): Construction Schedule Risk Model.” Journal of Construction Engineering and Management 129(5): 518–527. doi:10.1061/(asce)0733-9364(2003)129:5(518).
  • Ngo, J., B. G. Hwang, and C. Zhang. 2020. “Factor-based Big Data and Predictive Analytics Capability Assessment Tool for the Construction Industry.” Automation in Construction 110: 103042. doi:10.1016/j.autcon.2019.103042.
  • Nieto-Morote, A., and R. Francisco. 2011. “A Fuzzy Approach to Construction Project Risk Assessment.” International Journal of Project Management 29(2): 220–231. doi:10.1016/j.ijproman.2010.02.002.
  • Park, H. S., D. Lee, S. Kim, and J. L. Kim. 2015. “Comparing Project Performance of Design-build and Design-bid-build Methods for Large-sized Public Apartment Housing Projects in Korea.” Journal of Asian Architecture and Building Engineering 14(2): 323–330. doi:10.3130/jaabe.14.323.
  • Shuying, L. 2009. “Risk Management for Overseas Development Projects.” International Business Research 2(3): 193–196. doi:10.5539/ibr.v2n3p193.
  • Zhi, H. 1995. “Risk Management for Overseas Construction Projects.” International Journal of Project Management 13(4): 231–237. doi:10.1016/0263-7863(95)00015-I.