1,968
Views
1
CrossRef citations to date
0
Altmetric
Research Article

Impact of the COVID-19 pandemic on risk factors in residential projects

ORCID Icon, &
Pages 1637-1647 | Received 16 Dec 2021, Accepted 29 Jun 2022, Published online: 09 Jul 2022

References

  • Abd El-Karim, M. S. B. A., O. A. Mosa El Nawawy, and A. M. Abdel-Alim. 2017. “Identification and Assessment of Risk Factors Affecting Construction Projects.” HBRC Journal 13 (2): 202–216. Informa UK Limited. doi:10.1016/j.hbrcj.2015.05.001.
  • Aboshady, A. M., M. M. G. Elbarkouky, and M. M. Marzouk (2013), “A Fuzzy Risk Management Framework for the Egyptian Real Estate Development Projects”, AEI 2013: Building Solutions for Architectural Engineering - Proceedings of the 2013 Architectural Engineering National Conference Pennsylvania, United States, pp. 343–352.
  • Al Amri, T. 2021. “The Economic Impact of COVID-19 on Construction Industry: Oman’s Case.” European Journal of Business and Management Research 6 (2): 146–152. European Open Access Publishing (Europa Publishing).
  • Alarcón, L. F., D. B. Ashley, A. S. de Hanily, K. R. Molenaar, and R. Ungo. 2011. “Risk Planning and Management for the Panama Canal Expansion Program.” Journal of Construction Engineering and Management 137 (10): 762–771. American Society of Civil Engineers (ASCE). doi:10.1061/(ASCE)CO.1943-7862.0000317.
  • Alsharef, A., S. Banerjee, S. M. J. Uddin, A. Albert, and E. Jaselskis. 2021. “Early Impacts of the COVID-19 Pandemic on the United States Construction Industry.” International Journal of Environmental Research and Public Health, MDPI AG 18 (4): 1559. doi:10.3390/ijerph18041559.
  • Amoah, C., and F. Simpeh. 2021. “Implementation Challenges of COVID-19 Safety Measures at Construction Sites in South Africa.” Journal of Facilities Management 19 (1): 111–128. Emerald Group Holdings Ltd. doi:10.1108/JFM-08-2020-0061.
  • Ayat, M., Malikah, and C. W. Kang. 2021. “Effects of the COVID-19 Pandemic on the Construction Sector: A Systemized Review.” Engineering, Construction and Architectural Management Emerald Group Holdings Ltd available at 10.1108/ECAM-08-2021-0704/FULL/XML
  • Badawy, M. 2021. “Second-order Confirmatory Factor Analysis Model for Estimating the Overall Risk of Change Orders in Road Projects.” Journal of Engineering, Design and Technology. Emerald Publishing Limited, Vol. ahead-of-p No. ahead-of-print, available at. doi:10.1108/JEDT-09-2020-0383.
  • Baghdadi, A., and M. Kishk. 2015. “Saudi Arabian Aviation Construction Projects: Identification of Risks and Their Consequences.” In Miklós Hajdu, Mirosław J. Skibniewski (Eds.)Procedia Engineering. Vol. 123, 32–40. Krakow, Poland: Diamond Congress.
  • Banik, G. C., and A. L. May. 2006. “Emerging Legal Risks for Construction Management Professionals.” Leadership and Management in Engineering, American Society of Civil Engineers 6 (3): 102–109. doi:10.1061/(ASCE)1532-6748(2006)6:3(102).
  • Biswas, A., A. Ghosh, A. Kar, T. Mondal, B. Ghosh, and D. Kumar Bardhan (2021), “The Impact of COVID-19 in the Construction Sector and Its Remedial Measures”, Journal of Physics: Conference Series, IOP Publishing. Kalyani, West Bengal, India, Vol. 1797, p. 12054.
  • Chan, A. P. C., J. F. Y. Yeung, C. C. P. Yu, S. Q. Wang, and Y. Ke. 2011. “Empirical Study of Risk Assessment and Allocation of Public-Private Partnership Projects in China.” Journal of Management in Engineering 27 (3): 136–148. American Society of Civil Engineers (ASCE). doi:10.1061/(ASCE)ME.1943-5479.0000049.
  • Choudhry, R. M., and K. Iqbal. 2013. “Identification of Risk Management System in Construction Industry in Pakistan.” Journal of Management in Engineering 29 (1): 42–49. American Society of Civil Engineers (ASCE). doi:10.1061/(ASCE)ME.1943-5479.0000122.
  • Creedy, G. D., M. Skitmore, and J. K. W. Wong. 2010. “Evaluation of Risk Factors Leading to Cost Overrun in Delivery of Highway Construction Projects.” Journal of Construction Engineering and Management 136 (5): 528–537. American Society of Civil Engineers (ASCE). doi:10.1061/(ASCE)CO.1943-7862.0000160.
  • Dhar, M., V. Binu, and S. Mayya. 2014. “Some Basic Aspects of Statistical Methods and Sample Size Determination in Health Science Research.” AYU (An International Quarterly Journal of Research in Ayurveda) 35 (2): 119. Medknow. doi:10.4103/0974-8520.146202.
  • El-Sayegh, S. 2008. “Risk Assessment and Allocation in the UAE Construction Industry.” International Journal of Project Management, Pergamon 26 (4): 431–438.
  • El-Sayegh, S., and M. Mansour. 2015. “Risk Assessment and Allocation in Highway Construction Projects in the UAE.” Journal of Management in Engineering 31 (6): 04015004. American Society of Civil Engineers (ASCE). doi:10.1061/(ASCE)ME.1943-5479.0000365.
  • Elfadaly, F. G., P. H. Garthwaite, and J. R. Crawford. 2016. “On Point Estimation of the Abnormality of a Mahalanobis Index.” In Computational Statistics and Data Analysis. Vol. 99, 115–130. Elsevier B.V.
  • Elsebaei, M., O. Elnawawy, A. A. E. Othman, and M. Badawy. 2020. “Causes and Impacts of Site Accidents in the Egyptian Construction Industry.” International Journal of Construction Management 1–12. doi:10.1080/15623599.2020.1819523.
  • Eskander, R. F. A. 2018. “Risk Assessment Influencing Factors for Arabian Construction Projects Using Analytic Hierarchy Process.” Alexandria Engineering Journal 57 (4): 4207–4218. Elsevier B.V. doi:10.1016/j.aej.2018.10.018.
  • Fairlie, R. 2020. The Impact of Covid-19 on Small Business Owners: Evidence of Early-Stage Losses from the April 2020 Current Population Survey, Cambridge, MA: National Bureau of Economic Research: available at. 10.3386/w27309
  • Fasano, G., and A. Franceschini. 1987. “A Multidimensional Version of the Kolmogorov–Smirnov Test.” 1 In Monthly Notices of the Royal Astronomical Society. Vol. 225 vols., 155–170 . Oxford University Press (OUP).doi: 10.1093/mnras/225.1.155
  • Fernandes, N. 2020. “Economic Effects of Coronavirus Outbreak (COVID-19) on the World Economy.” SSRN Electronic Journal. Elsevier BV, available at. doi:10.2139/ssrn.3557504.
  • Gamil, Y., and A. Alhagar. 2020. “The Impact of Pandemic Crisis on the Survival of Construction Industry: A Case of COVID-19.” Mediterranean Journal of Social Sciences, Richtmann Publishing 11 (4): 122. doi:10.36941/mjss-2020-0047.
  • Hashemi, H., S. M. Mousavi, R. Tavakkoli-Moghaddam, and Y. Gholipour. 2013. “Compromise Ranking Approach with Bootstrap Confidence Intervals for Risk Assessment in Port Management Projects.” Journal of Management in Engineering 29 (4): 334–344. American Society of Civil Engineers (ASCE). doi:10.1061/(ASCE)ME.1943-5479.0000167.
  • Isa, C. M. M., F. N. M. Nusa, S. Z. Ishak, and S. F. Fam (2021), “Impacts of COVID-19 Pandemic on the Road and Transport Sectors Using Relative Importance Index”, 2021 IEEE International Conference on Automatic Control and Intelligent Systems, I2CACIS 2021 - Proceedings. Shah Alam, Malaysia, Institute of Electrical and Electronics Engineers Inc., pp. 305–310.
  • Kartam, N. A., and S. A. Kartam. 2001. “Risk and Its Management in the Kuwaiti Construction Industry: A Contractors’ Perspective.” International Journal of Project Management, Pergamon 19 (6): 325–335.
  • Khodeir, L. M., and A. H. M. Mohamed. 2015. “Identifying the Latest Risk Probabilities Affecting Construction Projects in Egypt according to Political and Economic Variables. From January 2011 to January 2013.” HBRC Journal, Informa UK Limited 11 (1): 129–135.
  • Laing, T. 2020. “The Economic Impact of the Coronavirus 2019 (Covid-2019): Implications for the Mining Industry.” The Extractive Industries and Society, Elsevier Ltd 7 (2): 580–582. doi:10.1016/j.exis.2020.04.003.
  • Luo, L. Z., C. Mao, L. Y. Shen, and Z. D. Li. 2015. “!risk Factors Affecting Practitioners’ Attitudes toward the Implementation of an Industrialized Building System a Case Study from China.” Engineering, Construction, and Architectural Management 22 (6): 622–643. Emerald Group Publishing Ltd. doi:10.1108/ECAM-04-2014-0048.
  • Mahamid, I. 2011. “Risk Matrix for Factors Affecting Time Delay in Road Construction Projects: Owners’ Perspective.” Engineering, Construction, and Architectural Management, Emerald Group Publishing Limited 18 (6): 609–617. doi:10.1108/09699981111180917.
  • Mahendra, P. A., J. R. Pitroda, and J. J. Bhavsar. 2013. “A Study of Risk Management Techniques for Construction Projects in Developing Countries.” International Journal of Innovative Technology and Exploring Engineering (IJITEE) 3 (5): 139–142.
  • Malik, S., F. Fatima, A. Imran, L. F. Chuah, J. J. Klemeš, I. H. Khaliq, S. Asif, et al. 2019. “Improved Project Control for Sustainable Development of Construction Sector to Reduce Environment Risks”. Journal of Cleaner Production, Elsevier Ltd 240: 118214. 10.1016/j.jclepro.2019.118214.
  • Marques, R. C., and S. Berg. 2011. “Risks, Contracts, and Private-Sector Participation in Infrastructure.” Journal of Construction Engineering and Management 137 (11): 925–932. American Society of Civil Engineers (ASCE). doi:10.1061/(ASCE)CO.1943-7862.0000347.
  • Marzouk, M., and A. Aboushady. 2018. “Modeling Risks in Real Estate Development Projects: A Case for Egypt.” International Journal of Strategic Property Management, Vilnius Gediminas Technical University 22 (6): 447–456. doi:10.3846/ijspm.2018.6270.
  • Odeh, A. M., and H. T. Battaineh. 2002. “Causes of Construction Delay: Traditional Contracts.” International Journal of Project Management, Elsevier BV 20 (1): 67–73.
  • Odimabo, O. O., C. F. Oduoza, and S. Suresh. 2017. “Methodology for Project Risk Assessment of Building Construction Projects Using Bayesian Belief Networks.” International Journal of Construction Engineering and Management 6 (6): 221–234.
  • Ogunnusi, M., M. Hamma-Adama, H. Salman, and T. Kouider. 2020. “COVID-19 Pandemic: The Effects and Prospects in the Construction Industry.” International Journal of Real Estate Studies INTREST 14 (S2): 120–128.
  • Organization, W. H. 2020. Naming the Coronavirus Disease (COVID-19) and the Virus that Causes It. Brazilian Journal Of Implantology And Health Sciences, 2(3).
  • Osama, M., A. Sherif, and M. Badawy. 2021. “Risk Analysis of Construction of Administration Projects Using Bayesian Networks.” Journal of Engineering, Design and Technology Emerald Publishing Limited, Vol. ahead-of-p No. ahead-of-print available at 10.1108/JEDT-04-2021-0222
  • Osei-Kyei, R., and A. P. C. Chan. 2017. “Risk Assessment in public-private Partnership Infrastructure Projects: Empirical Comparison between Ghana and Hong Kong.” Construction Innovation 17 (2): 204–223. doi:10.1108/CI-08-2016-0043.
  • Osman, M. M., U. Issa, and A. M. Zakaria Eraqi. 2020. “Identifying the Risk Impact on Cost and Time of the Egyptian Non-Residential Buildings Projects.” International Journal of Scientific Research in Science, Engineering and Technology 7 (1): 01–12. doi:10.32628/IJSRSET196659.
  • Park, J., B. Park, Y. Cha, and C. Hyun. 2016. “Risk Factors Assessment considering Change Degree for Mega-projects.” Procedia - Social and Behavioral Sciences, Elsevier BV 218: 50–55. doi:10.1016/j.sbspro.2016.04.009.
  • Salami, B. A., S. O. Ajayi, and A. S. Oyegoke. 2022. “Coping with the Covid-19 Pandemic: An Exploration of the Strategies Adopted by Construction Firms.” Journal of Engineering, Design and Technology 20 (1): 159–182. Emerald Group Holdings Ltd. doi:10.1108/JEDT-01-2021-0054.
  • Shen, L. Y., G. W. C. Wu, and C. S. K. Ng. 2001. “Risk Assessment for Construction Joint Ventures in China.” Journal of Construction Engineering and Management 127 (1): 76–81. American Society of Civil Engineers (ASCE). doi:10.1061/(ASCE)0733-9364(2001)127:1(76).
  • Tang, W., M. Qiang, C. F. Duffield, D. M. Young, and Y. Lu. 2007. “Risk Management in the Chinese Construction Industry.” Journal of Construction Engineering and Management 133 (12): 944–956. American Society of Civil Engineers (ASCE). doi:10.1061/(ASCE)0733-9364(2007)133:12(944).
  • Taylan, O., A. O. Bafail, R. M. S. Abdulaal, and M. R. Kabli. 2014. “Construction Projects Selection and Risk Assessment by Fuzzy AHP and Fuzzy TOPSIS Methodologies.” Applied Soft Computing, Elsevier 17: 105–116. doi:10.1016/j.asoc.2014.01.003.
  • Tran, D. Q., and K. R. Molenaar. 2014. “Impact of Risk on Design-Build Selection for Highway Design and Construction Projects.” Journal of Management in Engineering 30 (2): 153–162. American Society of Civil Engineers (ASCE). doi:10.1061/(ASCE)ME.1943-5479.0000210.
  • Venkataraman, N. 2008. “Safety Performance Factor.” International Journal of Occupational Safety and Ergonomics, Taylor & Francis 14 (3): 327–331. doi:10.1080/10803548.2008.11076772.
  • Xu, X., J. Wang, C. Z. Li, W. Huang, and N. Xia. 2018. “Schedule Risk Analysis of Infrastructure Projects: A Hybrid Dynamic Approach.” In Automation in Construction. Vol. 95, 20–34 . Elsevier B.V.doi:10.1016/j.autcon.2018.07.026
  • Zayed, T., M. Amer, and J. Pan. 2008. “Assessing Risk and Uncertainty Inherent in Chinese Highway Projects Using AHP.” International Journal of Project Management, Pergamon 26 (4): 408–419.
  • Zheng, L., K. Chen, and L. Ma. 2021. “Knowledge, Attitudes, and Practices toward COVID-19 among Construction Industry Practitioners in China.” Frontiers in Public Health Front Public Health 8 available at 10.3389/FPUBH.2020.599769