850
Views
0
CrossRef citations to date
0
Altmetric
Construction Management

Simulation-based framework for optimal construction equipment allocation considering construction noise emissions

, , &
Pages 2959-2976 | Received 20 May 2022, Accepted 19 Jan 2023, Published online: 10 Feb 2023

References

  • AbouRizk, S. M., and D. W. Halpin. 1990. “Probabilistic Simulation Studies for Repetitive Construction Processes.” Journal of Construction Engineering and Management 116 (4): 575–594. doi:10.1061/(ASCE)0733-9364(1990)116:4(575).
  • Ahn, S. J., S. Han, M. S. Altaf, and M. Al-Hussein. 2022. “Integrating off-site and on-site Panelized Construction Schedules Using Fleet Dispatching, Autom.” Constr 137: 104201. doi:10.1016/j.autcon.2022.104201.
  • An, J., T. Hong, J. Oh, W. Jung, K. Jeong, H. S. Park, and D. E. Lee. 2019. “An Optimal Implementation Strategy of the multi-function Window considering the Nonlinearity of Its technical-environmental-economic Performance by Window Ventilation System Size, Build.” Environ 161: 106234. doi:10.1016/j.buildenv.2019.106234.
  • Ballesteros, M. J., M. D. Fernández, S. Quintana, J. A. Ballesteros, and I. González. 2010. “Noise Emission Evolution on Construction Sites. Measurement for Controlling and Assessing Its Impact on the People and on the Environment.” Building and Environment 45 (3): 711–717. doi:10.1016/j.buildenv.2009.08.011.
  • Central Environmental Conflict Mediation Commission. 2020. Environmental Dispute Resolution Statistical Data, 2020 (Sejong-si, Republic of Korea: Ministry of Environment).
  • Central Environmental Conflict Resolution Commission. 2022 (Sejong-si, Republic of Korea: Ministry of Environment). “.” .
  • Chan, W.-T., D. K. Chua, and G. Kannan. 1996. “Construction Resource Scheduling with Genetic Algorithms.” Journal of Construction Engineering and Management 122 (2): 125–132. doi:10.1061/(ASCE)0733-9364(1996)122:2(125).
  • Cheng, T. M., and R. Z. Yan. 2009. “Integrating Messy Genetic Algorithms and Simulation to Optimize Resource Utilization.” Computer-Aided Civil and Infrastructure Engineering 24 (6): 401–415. doi:10.1111/j.1467-8667.2008.00588.x.
  • Choi, J., H. Kang, T. Hong, H. Baek, and D. E. Lee. 2021. “Automated Noise Exposure Assessment Model for the Health of Construction Workers, Autom.” Constr 126: 103657. doi:10.1016/j.autcon.2021.103657.
  • Clark, C., and K. Paunovic. 2018. “Who Environmental Noise Guidelines for the European Region: A Systematic Review on Environmental Noise and Quality of Life, Wellbeing and Mental Health.” International Journal of Environmental Research and Public Health 15. doi:10.3390/ijerph15112400.
  • Dashti, M. S., M. RezaZadeh, M. Khanzadi, and H. Taghaddos. 2021. “Integrated BIM-based Simulation for Automated time-space Conflict Management in Construction Projects, Autom.” Constr 132: 103957. doi:10.1016/j.autcon.2021.103957.
  • ECC (Central Environmental Conflict Mediation Commission). 2020. “Environmental Dispute Resolution Statistical Data.”
  • Fente, J., C. Schexnayder, and K. Knutson. 2000. “Defining a Probability Distribution Function for Construction Simulation.” Journal of Construction Engineering and Management 126 (3): 234–241. doi:10.1061/(ASCE)0733-9364(2000)126:3(234).
  • Frough, O., A. Khetwal, and J. Rostami. 2019. “Predicting TBM Utilization Factor Using Discrete Event Simulation Models.” Tunnelling and Underground Space Technology 87: 91–99. doi:10.1016/j.tust.2019.01.017.
  • Gannoruwa, A., and J. Y. Ruwanpura. 2007. “Construction Noise Prediction and Barrier Optimization Using Special Purpose Simulation.” Proceedings - Winter Simulation Conference 2073–2081. doi:10.1109/WSC.2007.4419839.
  • Gazette, F. L. 2013. Bundesgesetzblatt. Germany: German Civil Code BGB.
  • Ghannad, P., Y.-C. Lee, and J. O. Choi. 2021. “Prioritizing Postdisaster Recovery of Transportation Infrastructure Systems Using Multiagent Reinforcement Learning.” Journal of Management in Engineering 37 (1): 04020100. doi:10.1061/(asce)me.1943-5479.0000868.
  • Halpin, D. 1973. Simulation in Construction Using CYCLONE and MicroCYCLONE. West Lafayette, Indiana, United States: Purdue University.
  • Halpin, D. W., and L. S. Riggs. 1992. Planning and Analysis of Construction Operations. New jersey, United States: John Wiley & Sons.
  • Hammad, A. W. A., A. Akbarnezhad, and D. Rey. 2016. “A multi-objective Mixed Integer Nonlinear Programming Model for Construction Site Layout Planning to Minimise Noise Pollution and Transport Costs.” Automation in Construction 61: 73–85. doi:10.1016/j.autcon.2015.10.010.
  • Han, S., S. Lee, T. Hong, and H. Chang. 2006. “Simulation Analysis of Productivity Variation by Global Positioning System (GPS) Implementation in Earthmoving Operations.” Canadian Journal of Civil Engineering 33 (9): 1105–1114. doi:10.1139/L05-124.
  • Hong, T., C. Ji, J. Park, S.-B. Leigh, and D. Seo. 2014. “Prediction of Environmental Costs of Construction Noise and Vibration at the Preconstruction Phase.” Journal of Management in Engineering 31. doi:10.1061/(ASCE)ME.1943-5479.
  • Hong, J., H. Kang, and T. Hong. 2020. “Oversampling-based Prediction of Environmental Complaints Related to Construction Projects with Imbalanced empirical-data Learning.” Renewable and Sustainable Energy Reviews 134: 110402. doi:10.1016/j.rser.2020.110402.
  • Hong, J., H. Kang, T. Hong, H. S. Park, and D. E. Lee. 2021. “Development of a Prediction Model for the Proportion of Buildings Exposed to Construction Noise in Excess of the Construction Noise Regulation at Urban Construction Sites, Autom.” Constr 125: 103656. doi:10.1016/j.autcon.2021.103656.
  • Hong, J., H. Kang, T. Hong, H. S. Park, and D. E. Lee. 2022a. “Construction Noise Rating Based on Legal and Health Impacts, Autom.” Constr 134: 104053. doi:10.1016/j.autcon.2021.104053.
  • Hong, T., S. Sung, H. Kang, J. Hong, H. Kim, and D.-E. Lee. 2022b. “Advanced Real-Time Pollutant Monitoring Systems for Automatic Environmental Management of Construction Projects Focusing on Field Applicability.” Journal of Management in Engineering 38 (1): 04021075. doi:10.1061/(asce)me.1943-5479.0000980.
  • Ibrahim, A., O. El-Anwar, and M. Marzouk. 2018. “Socioeconomic Impact Assessment of Highly dense-urban Construction Projects, Autom.” Constr. doi:10.1016/j.autcon.2018.04.001.
  • Jeong, K., T. Hong, J. Kim, and K. Cho. 2019. “Development of a multi-objective Optimization Model for Determining the Optimal CO2 Emissions Reduction Strategies for a multi-family Housing Complex.” Renewable and Sustainable Energy Reviews 110: 118–131. doi:10.1016/j.rser.2019.04.068.
  • Jung, S., H. Kang, J. Choi, T. Hong, H. S. Park, and D.-E. Lee. 2020. “Quantitative Health Impact Assessment of Construction Noise Exposure on the Nearby Region for Noise Barrier Optimization, Build.” Environ 176: 106869. doi:10.1016/j.buildenv.2020.106869.
  • Kang, H., S. Sung, J. Hong, S. Jung, T. Hong, H. S. Park, and D. E. Lee. 2021. “Development of a real-time Automated Monitoring System for Managing the Hazardous Environmental Pollutants at the Construction Site.” Journal of Hazardous Materials 402: 123483. doi:10.1016/j.jhazmat.2020.123483.
  • Karshenas, S., and D. Haber. 1990. “Economic Optimization of Construction Project Scheduling.” Construction Management and Economics 8 (2): 135–146. doi:10.1080/01446199000000012.
  • KICT (Korea Institute of Civil Engineering and Building Technology). 2022. “Standard of Construction Estimate.”
  • Kim, S., M. Kong, J. Choi, S. Han, H. Baek, and T. Hong. 2021. “Feasibility Analysis of COVID-19 Response Guidelines at Construction Sites in South Korea Using CYCLONE in Terms of Cost and Time.” Journal of Management in Engineering 37 (5): 04021048. doi:10.1061/(ASCE)ME.1943-5479.0000957.
  • Kwon, N., M. Park, H. Lee, J. Ahn, and M. Shin. 2016. “Construction Noise Management Using Active Noise Control Techniques.” Journal of Construction Engineering and Management 142 (7): 04016014. doi:10.1061/(ASCE)CO.1943-7862.0001121.
  • Kwon, N., K. Song, H. Lee, J. Kim, and M. Park. 2018. “Construction Noise Risk Assessment Model Focusing on Construction Equipment.” Journal of Construction Engineering and Management 144 (6): 04018034. doi:10.1061/(ASCE)CO.1943-7862.0001480.
  • Lee, S. C., J. Y. Hong, and J. Y. Jeon. 2015. “Effects of Acoustic Characteristics of Combined Construction Noise on Annoyance, Build.” Environ 92: 657–667. doi:10.1016/j.buildenv.2015.05.037.
  • Lee, S. W., S. Il Chang, and Y. M. Park. 2008. “Utilizing Noise Mapping for Environmental Impact Assessment in a Downtown Redevelopment Area of Seoul, Korea, Appl.” Applied Acoustics 69 (8): 704–714. doi:10.1016/j.apacoust.2007.02.009.
  • Lee, S.-H., J.-H. Son, and S.-H. Lee. 2014. “Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field.” Journal of the Korea Institute of Building Construction 14 (5): 467–476. doi:10.5345/jkibc.2014.14.5.467.
  • Lewis, C. D. 1982. Industrial and Business Forecasting Methods: A Practical Guide to Exponential Smoothing and Curve Fitting. Oxford, United Kingdom: Butterworth-Heinmann.
  • Liu, Y., B. Xia, C. Cui, and M. Skitmore. 2017. “Community Response to Construction Noise in Three Central Cities of Zhejiang Province, China, Environ.” Environmental Pollution 230: 1009–1017. doi:10.1016/j.envpol.2017.07.058.
  • Lu, M., and W. H. Chan. 2004. “Modeling Concurrent Operational Interruptions in Construction Activities with Simplified Discrete Event Simulation Approach (SDESA).” Proceedings - Winter Simulation Conference 2: 1260–1267. doi:10.1109/wsc.2004.1371458.
  • Lu, W., and T. Olofsson. 2014. “Building Information Modeling and Discrete Event Simulation: Towards an Integrated Framework, Autom.” Constr 44: 73–83. doi:10.1016/j.autcon.2014.04.001.
  • Maio, C., C. Schexnayder, K. Knutson, and S. Weber. 2000. “Probability Distribution Functions for Construction Simulation.” Journal of Construction Engineering and Management 126 (4): 285–292. doi:10.1061/(ASCE)0733-9364(2000)126:4(285).
  • Miedema, H. M. E. 2007. “Annoyance Caused by Environmental Noise: Elements for evidence-based Noise Policies.” Journal of Social Issues 63 (1): 41–57. doi:10.1111/j.1540-4560.2007.00495.x.
  • Ministry of Environment. 2006. Guidance of Noise & Vibration Control under Construction. Republic of Korea: Sejong-si.
  • MOE. 2018. Noise and Vibration Control Act. Republic of Korea: Sejong-si.
  • Monghasemi, S., and M. Abdallah. 2021. “Linear Optimization Model to Minimize Total Cost of Repetitive Construction Projects and Identify Order of Units.” Journal of Management in Engineering 37 (4): 1–15. doi:10.1061/(asce)me.1943-5479.0000936.
  • National Environmental Conflict Resolution Commission. 2019. “Noise Damage Compensation Criteria for Construction Sites.”
  • Ning, X., J. Qi, C. Wu, and W. Wang. 2019. “Reducing Noise Pollution by Planning Construction Site Layout via a multi-objective Optimization Model.” Journal of Cleaner Production 222: 218–230. doi:10.1016/j.jclepro.2019.03.018.
  • RION. 2016. “Sound Level Meter NL-42.” NL-52 Datasheet.
  • Senior, B. A. 1995. “Late-Time Computation for Task Chains Using Discrete-Event Simulation.” Journal of Construction Engineering and Management 121 (4): 397–403. doi:10.1061/(asce)0733-9364(1995)121:4(397).
  • van Kempen, E., M. Casas, G. Pershagen, and M. Foraster. 2018. “WHO Environmental Noise Guidelines for the European Region: A Systematic Review on Environmental Noise and Cardiovascular and Metabolic Effects: A Summary.” International Journal of Environmental Research and Public Health 15 (2): 1–59. doi:10.3390/ijerph15020379.
  • Wang, H., V. Tenorio, G. Li, J. Hou, and N. Hu. 2020. “Optimization of Trackless Equipment Scheduling in Underground Mines Using Genetic Algorithms, Mining, Metall.” Explor 37: 1531–1544. doi:10.1007/s42461-020-00285-8.
  • World Health Organization. 2018 Environmental noise guidelines for the European Region. Geneva, Switzerland: World Health Organization https://apps.who.int/iris/bitstream/handle/10665/279952/9789289053563-eng.pdf.
  • Xiao, J., X. Li, and Z. Zhang. 2016. “DALY-Based Health Risk Assessment of Construction Noise in Beijing, China.” International Journal of Environmental Research and Public Health 13 (11): 1045. doi:10.3390/ijerph13111045.
  • Zhang, H. 2012. “Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling.” Journal of Management in Engineering 28 (2): 150–159. doi:10.1061/(asce)me.1943-5479.0000089.