Analyzing the influence factors of the post-earthquake reconstruction project using fuzzy DEMATEL

, &
Pages 1050-1062 | Received 23 Mar 2023, Accepted 06 Sep 2023, Published online: 13 Sep 2023

References

  • Adamy, A., and A. H. A. Bakar 2019. Key Criteria for Post-Reconstruction Hospital Building Performance. IOP Conference Series: Materials Science and Engineering, Pahang, Malaysia, IOP Publishing.
  • Attalla, M., T. Hegazy, and E. Elbeltagi. 2004. “In-House Delivery of Multiple-Small Reconstruction Projects.” Journal of Management in Engineering 20 (1): 25–31. https://doi.org/10.1061/(ASCE)0742-597X(2004)20:1(25).
  • Chan, W. T., C. Chen, J. I. Messner, and D. K. Chua. 2005. “Interface Management for China’s Build-Operate-Transfer Projects.” Journal of Construction Engineering and Management 131 (6): 645–655. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:6(645).
  • Chang, B., C.-W. Chang, and C.-H. Wu. 2011. “Fuzzy DEMATEL Method for Developing Supplier Selection Criteria.” Expert Systems with Applications 38 (3): 1850–1858. https://doi.org/10.1016/j.eswa.2010.07.114.
  • Chan, A. P. C., D. Scott, and A. P. L. Chan. 2004. “Factors Affecting the Success of a Construction Project.” Journal of Construction Engineering and Management-Asce 130 (1): 153–155. https://doi.org/10.1061/(asce)0733-9364(2004)130:1(153).
  • Cheek, W., and K. Chmutina. 2022. “‘Building Back Better’is Neoliberal Post‐Disaster Reconstruction.” Disasters 46 (3): 589–609. https://doi.org/10.1111/disa.12502.
  • Chien, K.-F., Z.-H. Wu, and S.-C. Huang. 2014. “Identifying and Assessing Critical Risk Factors for BIM Projects: Empirical Study.” Automation in Construction 45:1–15. https://doi.org/10.1016/j.autcon.2014.04.012.
  • Chuang, H.-M., C.-K. Lin, D.-R. Chen, and Y.-S. Chen. 2013. “Evolving MCDM Applications Using Hybrid Expert-Based ISM and DEMATEL Models: An Example of Sustainable Ecotourism.” Scientific World Journal 2013:1–18. https://doi.org/10.1155/2013/751728.
  • Dachyar, M., and Z. Sanjiwo. 2018. “Business Process Re-Engineering of Engineering Procurement Construction (EPC) Project in Oil and Gas Industry in Indonesia.” Indian Journal of Science and Technology 8 (1): 1–8. https://doi.org/10.17485/ijst/2018/v11i9/92741.
  • Da Silva, J. 2010. Lessons from Aceh-Key Considerations in Post-Disaster Reconstruction. United Kingdom: Practical Action Publishing.
  • Du, L., W. Tang, C. Liu, S. Wang, T. Wang, W. Shen, M. Huang, and Y. Zhou. 2016. “Enhancing Engineer–Procure–Construct Project Performance by Partnering in International Markets: Perspective from Chinese Construction Companies.” International Journal of Project Management 34 (1): 30–43. https://doi.org/10.1016/j.ijproman.2015.09.003.
  • Fayazi, M., F. F. Arefian, M. Gharaati, C. Johnson, G. Lizarralde, and C. Davidson. 2017. “Managing Institutional Fragmentation and Time Compression in Post-Disaster Reconstruction – the Case of Bam.” International Journal of Disaster Risk Reduction 21:340–349. https://doi.org/10.1016/j.ijdrr.2017.01.012.
  • Feng, G. C., and R. Ma. 2020. “Identification of the Factors That Influence Service Innovation in Manufacturing Enterprises by Using the Fuzzy DEMATEL Method.” Journal of Cleaner Production 253:120002. https://doi.org/10.1016/j.jclepro.2020.120002.
  • FIDIC. 2017. Conditions of Contract for EPC/Turnkey Projects. Geneva, Switzerland: Federation Internationale Des Ingenieurs-conseils.
  • Fontela, E., and A. Gabus. 1974. “DEMATEL: Progress Achieved.” Pergamon 6 (4): 361–363. https://doi.org/10.1016/0016-3287(74)90086-X.
  • Franz, B., K. R. Molenaar, and B. A. M. Roberts. 2020. “Revisiting Project Delivery System Performance from 1998 to 2018.” Journal of Construction Engineering and Management 146 (9): 04020100. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001896.
  • Han, Y., and L. Wang. 2018. “Identifying Barriers to Off-Site Construction Using Grey DEMATEL Approach: Case of China.” Journal of Civil Engineering and Management 24 (5): 364–377. https://doi.org/10.3846/jcem.2018.5181.
  • Herrera-Viedma, E., L. Martínez, F. Mata, and F. Chiclana. 2005. “A Consensus Support System Model for Group Decision-Making Problems with Multigranular Linguistic Preference Relations.” IEEE Transactions on Fuzzy Systems 13 (5): 644–658. https://doi.org/10.1109/TFUZZ.2005.856561.
  • Hidayat, B., and C. Egbu 2010. A Literature Review of the Role of Project Management in Post-Disaster Reconstruction. Procs 26th Annual ARCOM Conference, Association of Researchers in Construction Management, Leeds, UK.
  • Hidayat, B., and C. Egbu 2011. Critical Success Factors Associated with Post-Disaster Reconstruction Projects. Procs 27th Annual ARCOM Conference, Bristol, UK.
  • Hwang, W., B. Hsiao, H.-G. Chen, and C.-C. Chern. 2016. “Multiphase Assessment of Project Risk Interdependencies: Evidence from a University ISD Project in Taiwan.” Project Management Journal 47 (1): 59–75. https://doi.org/10.1002/pmj.21563.
  • Ismail, F. Z., A. Halog, and C. Smith. 2017. “How Sustainable is Disaster Resilience? An Overview of Sustainable Construction Approach in Post-Disaster Housing Reconstruction.” International Journal of Disaster Resilience in the Built Environment 8 (5): 555–572. https://doi.org/10.1108/ijdrbe.07.2016.0028.
  • Ismail, D., T. A. Majid, R. Roosli, and N. Ab Samah. 2014. “Project Management Success for Post-Disaster Reconstruction Projects: International NGOs Perspectives.” 18:120–127. https://doi.org/10.1016/S2212-5671(14)00921-6 4th International Conference on Building Resilience, Incorporating the 3rd Annual Conference of the Android Disaster Resilience Network
  • Jugdev, K., and R. Müller. 2005. “A Retrospective Look at Our Evolving Understanding of Project Success.” Project Management Journal 36 (4): 19–31. https://doi.org/10.1177/875697280503600403.
  • Karhu, V. 2001. A generic construction process modelling method. Doctoral dissertation, Institutionen för fastigheter och byggande.
  • Khalid, K. N., F. A. A. Nifa, R. M. Ismail, and C. K. Lin. 2017. “Initial Findings on Delay Factors in the Post-Disaster Housing Reconstruction: Local Authorities and NGOs Perspectives.” Journal of Engineering Science and Technology 12 (4): 137–146.
  • LaBrosse, M. 2007. “Project Management’s Role in Disaster Recovery.” Leadership and Management in Engineering 7 (3): 89. https://doi.org/10.1061/(ASCE)1532-6748(2007)7:3(89).
  • Lim, C., and M. Z. Mohamed. 1999. “Criteria of Project Success: An Exploratory Re-Examination.” International Journal of Project Management 17 (4): 243–248. https://doi.org/10.1016/S0263-7863(98)00040-4.
  • Li, C. W., and G. H. Tzeng. 2009. “Identification of a Threshold Value for the DEMATEL Method Using the Maximum Mean de-Entropy Algorithm to Find Critical Services Provided by a Semiconductor Intellectual Property Mall.” Expert Systems with Applications 36 (6): 9891–9898. https://doi.org/10.1016/j.eswa.2009.01.073.
  • Liu, W.-Y., and K. Fang. 2006. Using IDEF0/Petri Net for Ontology-Based Task Knowledge Analysis: The Case of Emergency Response for Debris-Flow. Proceedings of the 39th Annual Hawaii International Conference on System Sciences (HICSS’06), Kauai, Hawaii, 76c–76c. IEEE.
  • Mahmoudi, S., A. Jalali, M. Ahmadi, P. Abasi, and N. Salari. 2019. “Identifying Critical Success Factors in Heart Failure Self-Care Using Fuzzy DEMATEL Method.” Applied Soft Computing 84:105729. https://doi.org/10.1016/j.asoc.2019.105729.
  • Mannakkara, S., S. Wilkinson, and R. Potangaroa. 2014. “Build Back Better: Implementation in Victorian Bushfire Reconstruction.” Disasters 38 (2): 267–290. https://doi.org/10.1111/disa.12041.
  • Mavi, R. K., and C. Standing. 2018. “Critical Success Factors of Sustainable Project Management in Construction: A Fuzzy DEMATEL-ANP Approach.” Journal of Cleaner Production 194:751–765. https://doi.org/10.1016/j.jclepro.2018.05.120.
  • Okada, R. C., A. E. Simons, and A. Sattineni. 2017. “Owner-Requested Changes in the Design and Construction of Government Healthcare Facilities.” Procedia Engineering 196:592–606. https://doi.org/10.1016/j.proeng.2017.08.047.
  • Ophiyandri, T., D. Amaratunga, C. Pathirage, and K. Keraminiyage. 2013. “Critical Success Factors for Community-Based Post-Disaster Housing Reconstruction Projects in the Pre-Construction Stage in Indonesia.” International Journal of Disaster Resilience in the Built Environment 4 (2): 236–249. https://doi.org/10.1108/IJDRBE-03-2013-0005.
  • Opricovic, S., and G. H. Tzeng. 2003. “DEFUZZIFICATION within a MULTICRITERIA DECISION MODEL.” International Journal of Uncertainty Fuzziness & Knowledge Based Systems 11 (5): 635–652. https://doi.org/10.1142/S0218488503002387.
  • Pal, R., P. Wang, and X. Liang. 2017. “The Critical Factors in Managing Relationships in International Engineering, Procurement, and Construction (IEPC) Projects of Chinese Organizations.” International Journal of Project Management 35 (7): 1225–1237. https://doi.org/10.1016/j.ijproman.2017.05.010.
  • Papajohn, D. 2019. Contract Administration Functions and Tools for Design-Build and Construction Manager/General Contractor Project Delivery in US Highway Construction. Doctoral dissertation, Arizona State University, USA.
  • Papajohn, D., M. El Asmar, and K. R. Molenaar. 2019. “Contract Administration Tools for Design-Build and Construction Manager/General Contractor Highway Projects.” Journal of Management in Engineering 35 (6): 04019028. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000718.
  • Patil, S. K., and R. Kant. 2013. “A Fuzzy DEMATEL Method to Identify Critical Success Factors of Knowledge Management Adoption in Supply Chain.” Journal of Information & Knowledge Management 12 (3): 1350019. https://doi.org/10.1142/S0219649213500196.
  • Pham, L. H., and H. Hadikusumo. 2014. “Schedule Delays in Engineering, Procurement, and Construction Petrochemical Projects in Vietnam: A Qualitative Research Study.” International Journal of Energy Sector Management 8 (1): 3–26. https://doi.org/10.1108/IJESM-06-2013-0009.
  • Pradhananga, P., G. S. Kasabdji, and M. Elzomor. 2020. “A Sustainable Opportunity to Utilize Hazardous Waste During Post-Disaster Reconstruction Phase: A Case Study of Nepal Earthquake.” In Construction Research Congress 2020: Infrastructure Systems and Sustainability, 212–220. Reston, VA: American Society of Civil Engineers.
  • Pribadi, K. S., D. Kusumastuti, S. A. Sagala, and R. Wimbardana. 2014. Post-Disaster Housing Reconstruction in Indonesia: Review and Lessons from Aceh, Yogyakarta, West Java and West Sumatera Earthquakes. In Disaster Recovery. Disaster Risk Reduction, edited by R. Shaw, 197–223. Tokyo: Springer. https://doi.org/10.1007/978-4-431-54255-1_11.
  • Raval, S. J., R. Kant, and R. Shankar. 2021. “Analyzing the Critical Success Factors Influencing Lean Six Sigma Implementation: Fuzzy DEMATEL Approach.” Journal of Modelling in Management 16 (2): 728–764. https://doi.org/10.1108/JM2-07-2019-0155.
  • Rouhanizadeh, B., and S. Kermanshachi. 2020. “Post-Disaster Reconstruction of Transportation Infrastructures: Lessons Learned.” Sustainable Cities and Society 63:102505. https://doi.org/10.1016/j.scs.2020.102505.
  • Sadiqi, Z., V. Coffey, and B. Trigunarsyah 2011. Post-Disaster Housing Reconstruction: Challenges for Community Participation. Proceedings of the International Conference on Building Resilience: Interdisciplinary Approaches to Disaster Risk Reduction, and the Development of Sustainable Communities, University of Salford, United Kingdom, 1–10.
  • Sanvido, V., F. Grobler, K. Parfitt, M. Guvenis, and M. Coyle. 1992. “Critical Success Factors for Construction Projects.” Journal of Construction Engineering and Management 118 (1): 94–111. https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(94).
  • Sanvido, V. E., and S. A. Khayyal. 1990. An Integrated Building Process Model, Department of Architectural Engineering. US: The Pennsylvania State University.
  • Sara, J., R. M. Stikkelman, and P. M. Herder. 2015. “Assessing Relative Importance and Mutual Influence of Barriers for CCS Deployment of the ROAD Project Using AHP and DEMATEL Methods.” International Journal of Greenhouse Gas Control 41:336–357. https://doi.org/10.1016/j.ijggc.2015.07.008.
  • Shakeri, H., and M. Khalilzadeh. 2020. “Analysis of Factors Affecting Project Communications with a Hybrid DEMATEL-ISM Approach (A Case Study in Iran).” Heliyon 6 (8): e04430. https://doi.org/10.1016/j.heliyon.2020.e04430.
  • Shaw, R., M. Gupta, and A. Sarma. 2003. “Community Recovery and Its Sustainability: Lessons from Gujarat Earthquake of India.” Australian Journal of Emergency Management 18 (2): 28–34.
  • Shen, W. W., W. Y. Tang, C. F. Duffield, F. K. P. Hui, Y. Wei, J. Fang, and J. FANG. 2017. “Causes of contractors’ Claims in International Engineering-Procurement-Construction Projects.” Journal of Civil Engineering and Management 23 (6): 727–739. https://doi.org/10.3846/13923730.2017.1281839.
  • Si, S.-L., X.-Y. You, H.-C. Liu, and P. Zhang. 2018. “DEMATEL Technique: A Systematic Review of the State-Of-The-Art Literature on Methodologies and Applications.” Mathematical Problems in Engineering 1–33. https://doi.org/10.1155/2018/3696457.
  • Tseng, M.-L. 2009. “A Causal and Effect Decision Making Model of Service Quality Expectation Using Grey-Fuzzy DEMATEL Approach.” Expert Systems with Applications 36 (4): 7738–7748. https://doi.org/10.1016/j.eswa.2008.09.011.
  • Vahanvati, M., and M. Mulligan. 2017. “A New Model for Effective Post-Disaster Housing Reconstruction: Lessons from Gujarat and Bihar in India.” International Journal of Project Management 35 (5): 802–817. https://doi.org/10.1016/j.ijproman.2017.02.002.
  • Wang, T.-C., and Y.-H. Chen 2005. A New Method on Decision-Making Using Fuzzy Linguistic Assessment Variables and Fuzzy Preference Relations. The 9th World Multi-Conference on Systemics, Cybernetics and Informatics (WMSCI 2005), Citeseer.
  • Wee-Kheng, T., and C.-Y. Kuo. 2014. “Prioritization of Facilitation Strategies of Park and Recreation Agencies Through DEMATEL Analysis.” Asia Pacific Journal of Tourism Research 19 (8): 859–875. https://doi.org/10.1080/10941665.2013.812570.
  • Westerveld, E. 2003. “The Project Excellence Model®: Linking Success Criteria and Critical Success Factors.” International Journal of Project Management 21 (6): 411–418. https://doi.org/10.1016/S0263-7863(02)00112-6.
  • Yeo, K., and J. Ning. 2002. “Integrating Supply Chain and Critical Chain Concepts in Engineer-Procure-Construct (EPC) Projects.” International Journal of Project Management 20 (4): 253–262. https://doi.org/10.1016/S0263-7863(01)00021-7.
  • Yi, H., and J. Yang. 2014. “Research Trends of Post Disaster Reconstruction: The Past and the Future.” Habitat International 42:21–29. https://doi.org/10.1016/j.habitatint.2013.10.005.
  • Yung, P., J. Wang, X. Wang, and M. Jin. 2014. “A BIM-Enabled MEP Coordination Process for Use in China.” Journal of Information Technology in Construction (ITcon) 19 (23): 383–398.
  • Zhou, Q., W. Huang, and Y. Zhang. 2011. “Identifying Critical Success Factors in Emergency Management Using a Fuzzy DEMATEL Method.” Safety Science 49 (2): 243–252. https://doi.org/10.1016/j.ssci.2010.08.005.
  • Zhou, X., Y. Hu, Y. Deng, F. T. Chan, and A. Ishizaka. 2018. “A DEMATEL-Based Completion Method for Incomplete Pairwise Comparison Matrix in AHP.” Annals of Operations Research 271 (2): 1045–1066. https://doi.org/10.1007/s10479-018-2769-3.
  • Zhou, X., Y. Shi, X. Deng, and Y. Deng. 2017. “D-DEMATEL: A New Method to Identify Critical Success Factors in Emergency Management.” Safety Science 91:93–104. https://doi.org/10.1016/j.ssci.2016.06.014.