901
Views
0
CrossRef citations to date
0
Altmetric
Construction management

A Matching Model for Construction Subcontractor Selection in Engineering Bid Decisions Using Ordinal Priority Approach

, , , &
Pages 1393-1406 | Received 24 Mar 2023, Accepted 09 Oct 2023, Published online: 20 Oct 2023

References

  • Ahmad, I. 1990. “Decision-Support System for Modeling Bid/no-Bid Decision Problem.” Journal of Construction Engineering and Management 116 (4): 595–608. https://doi.org/10.1061/(ASCE)0733-9364(1990)116:4(595).
  • Ahmad, I., and I. Minkarah. 1988. “Questionnaire Survey on Bidding in Construction.” Journal of Management in Engineering 4 (3): 229–243. https://doi.org/10.1061/(ASCE)9742-597X(1988)4:3(229).
  • Ataei, Y., A. Mahmoudi, M. R. Feylizadeh, and D. F. Li. 2020. “Ordinal Priority Approach (OPA) in Multiple Attribute Decision-Making.” Applied Soft Computing 86:105893. https://doi.org/10.1016/j.asoc.2019.105893.
  • Bageis, A. S., and C. Fortune. 2009. “Factors Affecting the Bid/No Bid Decision in the Saudi Arabian Construction Contractors.” Construction Management & Economics 27 (1): 53–71. https://doi.org/10.1080/01446190802596220.
  • Biruk, S., P. Jaśkowski, and A. Czarnigowska. 2017. “Modeling Contractor’s Bidding Decisions.” Procedia Engineering 182:91–98. https://doi.org/10.1016/j.proeng.2017.03.125.
  • Cheng, M. Y., C. C. Hsiang, H. C. Tsai, and H. L. Do. 2011. “Bidding Decision Making for Construction Company using a Multi-criteria Prospect model / Statybos įmonės Apsisprendimas Dalyvauti Konkurse Naudojant Daugiakriterinį Perspektyvų Modelį.” Journal of Civil Engineering and Management 17 (3): 424–436. https://doi.org/10.3846/13923730.2011.598337.
  • Chen, X., Z. Li, Z. P. Fan, X. Zhou, and X. Zhang. 2016. “Matching Demanders and Suppliers in Knowledge Service: A Method Based on Fuzzy Axiomatic Design.” Information Sciences 346:130–145. https://doi.org/10.1016/j.ins.2016.01.096.
  • El-Khalek, H. A., R. F. Aziz, and E. S. Morgan. 2019. “Identification of Construction Subcontractor Prequalification Evaluation Criteria and Their Impact on Project Success.” Alexandria Engineering Journal 58 (1): 217–223. https://doi.org/10.1016/j.aej.2018.11.010.
  • El-Kholy, A. M. 2022. “A New Technique for Subcontractor Selection by Adopting Choosing by Advantages.” International Journal of Construction Management 22 (7): 1171–1193. https://doi.org/10.1080/15623599.2019.1683694.
  • El-Mashaleh, M. S. 2013. “Empirical Framework for Making the Bid/no-Bid Decision.” Journal of Management in Engineering 29 (3): 200–205. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000147.
  • Fan, Z. P., and Q. Le. 2014. “Strict Bilateral Matching Method Based on Perfect Preference Order Information.” Journal of Management Sciences 17 (1): 14. In Chinese. https://doi.org/10.3969/j.issn.1007-9807.2014.01.003.
  • Fan, Z. P., M. Y. Li, and X. Zhang. 2018. “Satisfied Two-Sided Matching: A Method Considering Elation and Disappointment of Agents.” Soft Computing 22 (21): 7227–7241. https://doi.org/10.1007/s00500-017-2725-1.
  • Gale, D. 2001. “The Two-Sided Matching Problem: Origin, Development and Current Issues.” International Game Theory Review 3 (2–3): 237–252. https://doi.org/10.1142/S0219198901000373.
  • Hartmann, A., F. Y. Y. Ling, and J. S. Tan. 2009. “Relative Importance of Subcontractor Selection Criteria: Evidence from Singapore.” Journal of Construction Engineering and Management 135 (9): 826–832. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:9(826).
  • Hastak, M., and A. Shaked. 2000. “ICRAM-1: Model for International Construction Risk Assessment.” Journal of Management in Engineering 16 (1): 59–69. https://doi.org/10.1061/(ASCE)0742-597X(2000)16:1(59).
  • Hu, S. 2021.” Research on the selection of subcontractors for housing construction projects under the EPC mode of A company.” MSc Thesis, Beijing University of Civil Engineering and Architecture, Beijing, China (in Chinese)
  • Iskander, M. G. 2006. “Exponential Membership Function in Stochastic Fuzzy Goal Programming.” Applied Mathematics and Computation 173 (2): 782–791. https://doi.org/10.1016/j.amc.2005.04.014.
  • Jia, X., X. Wang, Y. Zhu, L. Zhou, and H. Zhou. 2021. “A Two-Sided Matching Decision-Making Approach Based on Regret Theory Under Intuitionistic Fuzzy Environment.” Journal of Intelligent & Fuzzy Systems 40 (6): 11491–11508. https://doi.org/10.3233/JIFS-202720.
  • Korkmaz, I., H. Gökçen, and T. Çetinyokuş. 2008. “An Analytic Hierarchy Process and Two-Sided Matching Based Decision Support System for Military Personnel Assignment.” Information Sciences 178 (14): 2915–2927. https://doi.org/10.1016/j.ins.2008.03.005.
  • Leśniak, A., D. Kubek, E. Plebankiewicz, K. Zima, and S. Belniak. 2018. “Fuzzy AHP Application for Supporting contractors’ Bidding Decision.” Symmetry 10 (11): 642. https://doi.org/10.3390/sym10110642.
  • Liu, X., and H. Ma. 2015. “A Two-Sided Matching Decision Model Based on Uncertain Preference Sequences.” Mathematical Problems in Engineering 2015:1–10. https://doi.org/10.1155/2015/241379.
  • Mahmoudi, A., M. Abbasi, and X. Deng. 2022. “Evaluating the Performance of the Suppliers Using Hybrid DEA-OPA Model: A Sustainable Development Perspective.” Group Decision and Negotiation 31 (2): 335–362. https://doi.org/10.1007/s10726-021-09770-x.
  • Mahmoudi, A., M. Abbasi, J. Yuan, and L. Li. 2022. “Large-Scale Group Decision-Making (LSGDM) for Performance Measurement of Healthcare Construction Projects: Ordinal Priority Approach.” Applied Intelligence 52 (12): 13781–13802. https://doi.org/10.1007/s10489-022-04094-y.
  • Mahmoudi, A., M. Sadeghi, and L. M. Naeni. 2023. “Blockchain and Supply Chain Finance for Sustainable Construction Industry: Ensemble Ranking Using Ordinal Priority Approach.” Operations Management Research 1–24. https://doi.org/10.1007/s12063-023-00374-z.
  • Mbachu, J. 2008. “Conceptual Framework for the Assessment of subcontractors’ Eligibility and Performance in the Construction Industry.” Construction Management & Economics 26 (5): 471–484. https://doi.org/10.1080/01446190801918730.
  • Oyeyipo, O. O., K. T. Odusami, R. A. Ojelabi, and A. O. Afolabi. 2016. “Factors Affecting contractors’ Bidding Decisions for Construction Projects in Nigeria.” Journal of Construction in Developing Countries 21 (2): 21. https://doi.org/10.21315/jcdc2016.21.2.2.
  • Polat, G. 2016. “Subcontractor Selection Using the Integration of the AHP and PROMETHEE Methods.” Journal of Civil Engineering and Management 22 (8): 1042–1054. https://doi.org/10.3846/13923730.2014.948910.
  • Polat, G., B. Kaplan, and B. N. Bingol. 2015. “Subcontractor Selection Using Genetic Algorithm.” Procedia Engineering 123:432–440. https://doi.org/10.1016/j.proeng.2015.10.081.
  • Roth, A. E. 1984. “The Evolution of the Labor Market for Medical Interns and Residents: A Case Study in Game Theory.” Journal of Political Economy 92 (6): 991–1016. https://doi.org/10.1086/261272.
  • Roth, A. E. 1985. “Common and Conflicting Interests in Two-Sided Matching Markets.” European Economic Review 27 (1): 75–96. https://doi.org/10.1016/0014-2921(85)90007-8.
  • Roth, A. E., U. G. Rothblum, and J. H. Vande Vate. 1993. “Stable Matchings, Optimal Assignments, and Linear Programming.” Mathematics of Operations Research 18 (4): 803–828. https://doi.org/10.1287/moor.18.4.803.
  • Ruan, H., H. Liu, and D. Xiong. 2017. “Discussion on the Progress Management of the Housing Construction EPC Project.” Construction Technology 46 (S1): 611–615. in Chinese.
  • Sadeghi, M., A. Mahmoudi, and X. Deng. 2022. “Blockchain Technology in Construction Organizations: Risk Assessment Using Trapezoidal Fuzzy Ordinal Priority Approach.” Engineering, Construction & Architectural Management 30 (7): 2767–2793. https://doi.org/10.1108/ECAM-01-2022-0014.
  • Sadeghi, M., A. Mahmoudi, X. Deng, and X. Luo. 2023. “Prioritizing Requirements for Implementing Blockchain Technology in Construction Supply Chain Based on Circular Economy: Fuzzy Ordinal Priority Approach.” International Journal of Environmental Science and Technology 20 (5): 4991–5012. https://doi.org/10.1007/s13762-022-04298-2.
  • Vate, J. H. V. 1989. “Linear Programming Brings Marital Bliss.” Operations Research Letters 8 (3): 147–153. https://doi.org/10.1016/0167-6377(89)90041-2.
  • Wang, S. H. 2016.” Research on professional subcontractors’ participation in bidding decision-making.” MSc Thesis, University of Chinese Academy of Sciences, Hefei, China (in Chinese)
  • Wang, N., Y. Li, and H. Chai. 2021. “A Decision-Making Method for Many-To-Many Bilateral Matching Between Supply and Demand Parties Considering the Balance of Matching.” Journal of Southwest Jiaotong University 57 (2): 425–433. in Chinese.
  • Wanous, M., A. A. Boussabaine, and J. Lewis. 2000. “To Bid or Not to Bid: A Parametric Solution.” Construction Management & Economics 18 (4): 457–466. https://doi.org/10.1080/01446190050024879.
  • Yue, Q., L. Zhang, Y. Peng, B. Yu, Y. Hong, Q. Xiao, S. Sun, et al. 2016. “Decision Method for Two-Sided Matching with Interval-Valued Intuitionistic Fuzzy Sets Considering Matching Aspirations.” Journal of Intelligent & Fuzzy Systems 31 (6): 2903–2910. https://doi.org/10.3233/JIFS-169173.
  • Zhang, Z., J. L. Gao, Y. Gao, and Y. WY. 2021. “Two-Sided Matching Decision Making with Multi-Granular Hesitant Fuzzy Linguistic Term Sets and Incomplete Criteria Weight Information.” Expert Systems with Applications 168:114311. https://doi.org/10.1016/j.eswa.2020.114311.
  • Zhang, Z., C. Guo, and L. Martínez. 2017. “Managing Multigranular Linguistic Distribution Assessments in Large-Scale Multiattribute Group Decision Making.” IEEE Transactions on Systems, Man, and Cybernetics 47 (11): 3063–3076. https://doi.org/10.1109/TSMC.2016.2560521.
  • Zhang, Z., X. Y. Kou, I. Palomares, W. Y. Yu, and J. L. Gao. 2019. “Stable Two-Sided Matching Decision Making with Incomplete Fuzzy Preference Relations: A Disappointment Theory Based Approach.” Applied Soft Computing 84:105730. https://doi.org/10.1016/j.asoc.2019.105730.
  • Zhang, Z., X. Y. Kou, W. Y. Yu, and Y. Gao. 2021. “Consistency Improvement for Fuzzy Preference Relations with Self-Confidence: An Application in Two-Sided Matching Decision Making.” Journal of the Operational Research Society 72 (8): 1914–1927. https://doi.org/10.1080/01605682.2020.1748529.
  • Zhang, D., and H. Zhu. 2019. “A Satisfactory, Fair and Stable Bilateral Matching Method Based on Language Preference Information.” System Engineering Theory and Practice 39 (9): 2412–2420. in Chinese.
  • Zou, P. X., and B. T. Lim. 2006. “An Empirical Study in Subcontractor Selection and Long-Term Alliance Relationship Between Main-Contractor and Subcontractor.” International Journal of Construction Management 6 (1): 1–13. https://doi.org/10.1080/15623599.2006.10773078.