523
Views
6
CrossRef citations to date
0
Altmetric
Articles

Analysing the interaction of supply chain synchronisation and material flow stability

Pages 181-199 | Received 02 Nov 2015, Accepted 27 Mar 2016, Published online: 22 Jun 2016

References

  • Anderson, D. L., and H. Lee. 1999. “Synchronized Supply Chains: The New Frontier.” In Achieving Supply Chain Excellence through Technology, edited by D. L. Anderson, 12–21. San Francisco: Montgomery Research.
  • Ben-Daya, M., and M. Hariga. 2004. “Integrated Single Vendor Single Buyer Model with Stochastic Demand and Variable Lead Time.” International Journal of Production Economics 92 (1): 75–80. doi: 10.1016/j.ijpe.2003.09.012
  • Bennett, D., and P. Forrester. 1994. “Product Variety and Just-in-Time: Conflict and Challenge.” The International Journal of Logistics Management 5 (1): 73–80. doi: 10.1108/09574099410805090
  • Bennett, D., and F. Klug. 2012. “Logistics Supplier Integration in the Automotive Industry.” International Journal of Operations and Production Management 32 (11): 1281–1305. doi: 10.1108/01443571211274558
  • Burbidge, J. L. 1984. Automated production control with a simulation capability. In: Proceedings IPSP Conference WG 5-7, Copenhagen, 1–14.
  • Cannella, S., and E. Ciancimino. 2010. “On the Bullwhip Avoidance Phase: Supply Chain Collaboration and Order Smoothing.” International Journal of Production Research 48 (22): 6739–6776. doi: 10.1080/00207540903252308
  • Cannella, S., E. Ciancimino, and J. M. Framinan. 2011. “Inventory Policies and Information Sharing in Multi-Echelon Supply Chains.” Production Planning & Control 22 (7): 649–659. doi: 10.1080/09537287.2010.512276
  • Cannella, S., J. M. Framinan, and A. Barbosa-Póvoa. 2013. “An IT-Enabled Supply Chain Model: A Simulation Study.” International Journal of Systems Science 45 (11): 2327–2341. doi: 10.1080/00207721.2013.769072
  • Childerhouse, P., and D. R. Towill. 2003. “Engineering the Seamless Supply Chain.” The International Journal of Logistics Management 14 (1): 109–120. doi: 10.1108/09574090310806486
  • Ciancimino, E., S. Cannella, M. Bruccoleri, and J. M. Framian. 2012. “On the Bullwhip Avoidance Phase: The Synchronised Supply Chain.” European Journal of Operational Research 221 (1): 49–63. doi: 10.1016/j.ejor.2012.02.039
  • Coleman, J. 2010. “Extending Supply Chain Synchronisation to Upstream Tiers: A Collaborative Approach Illustrated with an Automotive Case Study.” International Journal of Networking and Virtual Organisations 7 (2/3): 257–271. doi: 10.1504/IJNVO.2010.031221
  • Coleman, J., A. Lyons, and D. Kehoe. 2004. “The Glass Pipeline: Increasing Supply Chain Synchronisation through Information Transparency.” International Journal of Technology 28 (2): 172–190.
  • Crawford, K. M., and J. F. Cox. 1991. “Addressing Manufacturing Problems through the Implementation of Just-in-time.” Production and Inventory Management 1st Quarter 33–36.
  • Doran, D. 2001. “Synchronous Supply: An Automotive Case Study.” European Business Review 13 (2): 114–120. doi: 10.1108/09555340110385290
  • Fawcett, S., M. McCarter, A. Fawcett, G. Webb, and G. Magnan. 2015. “Why Supply Chain Collaboration Fails: The Socio-Structural View of Resistance to Relational Strategies.” Supply Chain Management: An International Journal 20 (6): 648–663. doi: 10.1108/SCM-08-2015-0331
  • Goldratt, E. 1990. The Theory of Constraints. New York: North River Press.
  • Grant, D. B. 2012. Logistics Management. Harlow: Pearson Education.
  • Häfner, H. 1991. “Lot Sizing and Throughput Times in a Job Shop.” International Journal of Production Economics 23 (1–3): 111–116. doi: 10.1016/0925-5273(91)90054-W
  • Hahn, C. K., E. A. Duplaga, and J. L. Hartley. 2000. “Supply-Chain Synchronization: Lessons from Hyundai Motor Company.” Interfaces 30 (4): 32–45. doi: 10.1287/inte.30.4.32.11642
  • Hariga, M., E. Hassini, and M. Ben-Daya. 2014. “A Note on Generalized Single-Vendor Multi-Buyer Integrated Inventory Supply Chain Models with Better Synchronization.” International Journal of Production Economics 154: 313–316. doi: 10.1016/j.ijpe.2013.07.018
  • Harrison, A. 1995. “Themes for Facilitating Material Flow in Manufacturing Systems.” International Journal of Physical Distribution & Logistics Management 25 (10): 3–25. doi: 10.1108/09600039510101771
  • Harrison, A. 1996. “An Investigation of the Impact of Schedule Stability on Supplier Responsiveness.” The International Journal of Logistics Management 7 (1): 83–91. doi: 10.1108/09574099610805467
  • Harrison, A. 1997. “Investigating the Sources and Causes of Schedule Instability.” The International Journal of Logistics Management 8 (2): 75–82. doi: 10.1108/09574099710805682
  • Harrison, A., and R. van Hoek. 2011. Logistics Management and Strategy. 4th ed. Harlow: FT Prentice Hall.
  • Helbing, D. 2003. “Modelling Supply Networks and Business Cycles as Unstable Transport Phenomena.” New Journal of Physics 5 (1): 90.1–90.28.
  • Hill, A., D. Doran, and R. Stratton. 2012. “How should you Stabilise your Supply Chain?” International Journal of Production Economics 135 (2): 870–881. doi: 10.1016/j.ijpe.2011.10.027
  • Holweg, M. 2002. “The Three-day Car Challenge – Investigating the Inhibitors of Responsive Order Fulfilment in New Vehicle Supply Systems.” Thesis (PhD), Cardiff University.
  • Holweg, M. 2007. “The Genealogy of Lean Production.” Journal of Operations Management 25 (2): 420–437. doi: 10.1016/j.jom.2006.04.001
  • Holweg, M., S. Disney, J. Holmström, and J. Smaros. 2005. “Supply Chain Collaboration: Making Sense of the Strategy Continuum.” European Management Journal 23 (2): 170–181. doi: 10.1016/j.emj.2005.02.008
  • Jodlbauer, H. 2008. “A Time-Continuous Analytic Production Model for Service Level, Work in Process, Lead Time and Utilization.” International Journal of Production Research 46 (7): 1723–1744. doi: 10.1080/00207540601080498
  • Jones, D. T., P. Hines, and N. Rich. 1997. “Lean Logistics.” International Journal of Physical Distribution & Logistics Management 27 (3/4): 153–173. doi: 10.1108/09600039710170557
  • Klug, F. 2011. “What We Can Learn From Toyota on How to Tackle the Bullwhip Effect.” In Logistics Research Network Conference Proceedings, edited by B. Waterson, 1–10. Southampton: The Chartered Institute of Logistics and Transport (UK).
  • Klug, F. 2013. “The Internal Bullwhip Effect in Car Manufacturing.” International Journal of Production Research 51 (1): 303–322. doi: 10.1080/00207543.2012.677551
  • Klug, F. 2014. “Modelling and Analysis of Synchronised Material Flow with Fluid Dynamics.” Physica A: Statistical Mechanics and its Applications 393 (1): 404–417. doi: 10.1016/j.physa.2013.08.065
  • Krafcik, J. F., and J. P. MacDuffie. 1989. Explaining High Performance Manufacturing: The International Automotive Assembly Plant Study. Cambridge: MIT Press, International Motor Vehicle Program.
  • Lamming, R., Th. Johnsen, J. Zheng, and Ch. Harland. 2000. “An Initial Classification of Supply Networks.” International Journal of Operations & Production Management 20 (6): 675–691. doi: 10.1108/01443570010321667
  • Lee, L. C., and K. H. W. Seah. 1988. “JIT and the Effect of Varying Process and Setup Times.” International Journal of Operations & Production Management 8 (1): 19–35. doi: 10.1108/eb054811
  • Liker, J. K. 2004. The Toyota Way – 14 Management Principles from the World’s Greatest Manufacturer. New York: McGraw-Hill.
  • Liker, J. K., and D. Meier. 2006. The Toyota Way Fieldbook – A Practical Guide for Implementing Toyota’s 4Ps. New York: McGraw-Hill.
  • Liker, J. K., and Y.-Ch. Wu. 2000. “Japanese Automakers, U.S.” Suppliers and Supply-Chain Superiority, MIT Sloan Management Review 21 (1): 81–93.
  • Lyons, A. C., A. E. Coronado Mondragon, and Z. Michaelides. 2006. “The Relationship between Proximate Supply and Build-to-Order Capability.” Industrial Management and Data Systems 106 (8): 1095–1111. doi: 10.1108/02635570610710773
  • Mapes, J., M. Szwejczewski, and C. New. 2000. “Process Variability and its Effect on Plant Performance.” International Journal of Operations & Production Management 20 (7): 792–808. doi: 10.1108/01443570010330775
  • Newman, W. R., M. Hanna, and M. J. Maffei. 1993. “Dealing with Uncertainties of Manufacturing: Flexibility, Buffers and Integration.” International Journal of Operations & Production Management 13 (1): 19–43. doi: 10.1108/01443579310023972
  • Novack, R. A., L. M. Rinehart, and S. A. Fawcett. 1993. “Rethinking Integrated Concept Foundations: A Just-in-Time Argument for Linking Production/Operations and Logistics Management.” International Journal of Operations and Production Management 13 (6): 31–43. doi: 10.1108/01443579310039001
  • Ohno, T. 1984. “How the Toyota Production System Was Created.” In The Anatomy of Japanese Business, edited by K. Sato and Y. Hoshino, 197–215. Beckenham: Croom Helm.
  • Pikovsky, A., M. Rosenblum, and J. Kurths. 2001. Synchronization – A Universal Concept in Nonlinear Sciences. Cambridge: Cambridge University Press.
  • Riddalls, C. E., and S. Bennett. 2001. “The Optimal Control of Batched Production and its Effect on Demand Amplification.” International Journal of Production Economics 72 (2): 159–168. doi: 10.1016/S0925-5273(00)00092-X
  • Schmenner, R. W., and M. L. Swink. 1998. “On Theory in Operations Management.” Journal of Operations Management 17 (1): 98–113. doi: 10.1016/S0272-6963(98)00028-X
  • Scholz-Reiter, B., J. T. Tervo, and M. Freitag. 2006. “Phase-Synchronisation in Continuous Flow Models of Production Networks.” Physica A 363 (1): 32–38. doi: 10.1016/j.physa.2006.01.046
  • Seppälä, U., and J. Holmström. 1995. “Rough Modelling of Logistics Networks.” Integrated Manufacturing Systems 6 (5): 13–20. doi: 10.1108/09576069510093433
  • Shingo, S. 1981. Study of Toyota Production System from Industrial Engineering Viewpoint. Tokyo: Japan Management Association.
  • Steele, D. C., and K. E. Papke-Shields. 1993. “Capacity Slack: Strategic Alternative to Lead Time.” Production and Inventory Management Journal 4th Quarter 1–5.
  • Sterman, J. D. 2000. Business Dynamcis – Systems Thinking and Modelling for a Complex World. Boston: McGraw-Hill.
  • Sterman, J. D. 2006. “Operational and Behavioral Causes of Supply Chain Instability.” In The Bullwhip Effect in Supply Chains – A Review of Methods, Components and Cases, edited by O. A. Carranza Torres and F. A. Villegas Morán, 17–56. New York: Palgrave Macmillan.
  • Sugimori, Y., K. Kusunoki, F. Cho, and S. Uchikawa. 1977. “Toyota Production System and Kanban System Materialization of Just-in-Time and Respect-for-Human System.” International Journal of Production Research 15 (6): 553–564. doi: 10.1080/00207547708943149
  • Suri, R. 1999. Quick Response Manufacturing. Portland: Productivity Press.
  • Swenseth, S. R., K. Muralidhar, and R. L. Wilson. 1993. “Planning for Continual Improvement in a JIT Environment.” International Journal of Operations and Production Management 13 (6): 4–22. doi: 10.1108/01443579310038985
  • Towill, D. R. 1993. “System Dynamics – Background, Methodology, and Applications. Part 2: Applications.” Computing and Control Engineering Journal 4 (5): 261–268. doi: 10.1049/cce:19930050
  • Vollman, T. E., W. L. Berry, and D. C. Whybark. 1992. Manufacturing Planning and Control Systems. 3rd ed. Homewood: Irwin.
  • Warburton, R. D. H., and S. M. Disney. 2007. “Order and Inventory Variance Amplification: The Equivalence of Discrete and Continuous Time Analyses.” International Journal of Production Economics 110 (1–2): 128–137. doi: 10.1016/j.ijpe.2007.02.021
  • Wilding, R. 1998. “The Supply Chain Complexity Triangle – Uncertainty Generation in the Supply Chain.” International Journal of Physical Distribution and Logistics Management 28 (8): 599–616. doi: 10.1108/09600039810247524

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.