References
- Andriolo, A., D. Battini, R. W. Grubbström, A. Persona, and F. Sgarboss. 2014. “A Century of Evolution from Harris's Basic lot Size Model: Survey and Research Agenda.” International Journal of Production Economics 155: 16–38. doi:https://doi.org/10.1016/j.ijpe.2014.01.013.
- Bakal, I. S., and E. Akcali. 2006. “Effects of Random Yield in Remanufacturing with Price-Sensitive Supply and Demand.” Production and Operations Management 15: 407–420. doi:https://doi.org/10.1111/j.1937-5956.2006.tb00254.x.
- Barba-Gutierrez, Y., and B. Adenso-Diaz. 2009. “Reverse MRP Under Uncertain and Imprecise Demand.” The International Journal of Advanced Manufacturing Technology 40: 413–424. doi:https://doi.org/10.1007/s00170-007-1351-y.
- Barba-Gutierrez, Y., B. Adenso-Diaz, and S. M. Gupta. 2008. “Lot Sizing in Reverse MRP for Scheduling Disassembly.” International Journal of Production Economics 111: 741–751. doi:https://doi.org/10.1016/j.ijpe.2007.03.017.
- Brans, J. P., and P. L. Kunsch. 2010. “Ethics in Operations Research and Sustainable Development.” International Transactions in Operational Research 17: 427–444. doi:https://doi.org/10.1111/j.1475-3995.2009.00728.x.
- Bushuev, M. A., A. Guiffrida, M. Y. Jaber, and M. Khan. 2015. “A Review of Inventory lot Sizing Review Papers.” Management Research Review 38: 283–298.
- Fleishmann, M., J. M. Bloemhof-Ruwaard, R. Dekker, E. van der Laan, J. A. van Nunen, and L. N. van Wassenhove. 1997. “Quantitative Models for Reverse Logistics.” European Journal of Operational Research 103: 1–17. doi:https://doi.org/10.1016/S0377-2217(97)00230-0.
- Glock, C. H., E. H. Grosse, and J. M. Ries. 2014. “The lot Sizing Problem: A Tertiary Study.” International Journal of Production Economics 155: 39–51. doi:https://doi.org/10.1016/j.ijpe.2013.12.009.
- Godichaud, M., and L. Amodeo. 2018. “Economic Order Quantity for Multistage Disassembly Systems.” International Journal of Production Economics 199: 16–25. doi:https://doi.org/10.1016/j.ijpe.2018.02.008.
- Godichaud, M., and L. Amodeo. 2019. “EOQ Inventory Models for Disassembly Systems with Disposal and Lost Sales.” International Journal of Production Research 57: 5685–5704.
- Gupta, S. M. 2013. Reverse Supply Chains: Issues and Analysis. Florida, FI: CRC Press, Taylor & Francis.
- Gupta, S. M., and K. N. Taleb. 1994. “Scheduling Disassembly.” International Journal of Production Research 32: 1857–1866. doi:https://doi.org/10.1080/00207549408957046.
- Harris, F. W. 1990. “How Many Parts to Make at Once.” Operations Research 38: 947–950. doi:https://doi.org/10.1287/opre.38.6.947.
- Ilgin, M. A., and S. M. Gupta. 2010. “Environmentally Conscious Manufacturing and Product Recovery (ECMPRO): A Review of the State of the art.” Journal of Environmental Management 91: 563–591. doi:https://doi.org/10.1016/j.jenvman.2009.09.037.
- Ji, X., Z. Zhang, S. Huang, and L. Li. 2016. “Capacitated Disassembly Scheduling with Parts Commonality and Start-up Cost and its Industrial Application.” International Journal of Production Research 54: 1225–1243. doi:https://doi.org/10.1080/00207543.2015.1058536.
- Johnson, P. F. 1998. “Managing Value in Reverse Logistics Systems.” Transportation Research Part E: Logistics and Transportation Review 34: 217–227. doi:https://doi.org/10.1016/S1366-5545(98)00016-7.
- Kim, D.-H., 2013. Status and Expectation - Retail Market for New and Used Automobile Parts and Subassemblies. Hana Financial Group, Hana Industry Info. 96.
- Kim, J.-G., H.-B. Jeon, H.-J. Kim, D.-H. Lee, and P. Xirouchakis. 2006c. “Disassembly Scheduling with Capacity Constraints: Minimizing the Number of Products Disassembled.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 220: 1473–1481. doi:https://doi.org/10.1243/09544054JEM349.
- Kim, C.-B., M.-Y. Lee, S.-C. Shin, B.-B. Jeong, and C.-W. Lim. 2013. “A Study on Development of Quality Assurance System for Second-Hand Automobile Parts.” Korea Automotive Recyclers Association, 1–146.
- Kim, H.-J., D.-H. Lee, and P. Xirouchakis. 2006a. “Two-phase Heuristic for Disassembly Scheduling with Multiple Product Types and Parts Commonality.” International Journal of Production Research 44: 195–212. doi:https://doi.org/10.1080/00207540500244443.
- Kim, H.-J., D.-H. Lee, and P. Xirouchakis. 2006b. “A Lagrangean Heuristic Algorithm for Disassembly Scheduling with Capacity Constraints.” Journal of the Operational Research Society 57: 1231–1240. doi:https://doi.org/10.1057/palgrave.jors.2602094.
- Kim, H.-J., D.-H. Lee, and P. Xirouchakis. 2007. “Disassembly Scheduling: Literature Review and Future Research Directions.” International Journal of Production Research 45: 4465–4484. doi:https://doi.org/10.1080/00207540701440097.
- Kim, H.-J., D.-H. Lee, and P. Xirouchakis. 2008. “An Exact Algorithm for Two-Level Disassembly Scheduling.” J. Korean Inst. Ind. Eng 34: 414–424.
- Kim, H.-J., D.-H. Lee, P. Xirouchakis, and O.-K. Kwon. 2009. “A Branch and Bound Algorithm for Disassembly Scheduling with Assembly Product Structure.” Journal of the Operational Research Society 60: 419–430. doi:https://doi.org/10.1057/palgrave.jors.2602568.
- Kim, H.-J., and P. Xirouchakis. 2010. “Capacitated Disassembly Scheduling with Random Demand.” International Journal of Production Research 48: 7177–7194. doi:https://doi.org/10.1080/00207540903469035.
- Langella, I. M. 2007. “Heuristics for Demand-Driven Disassembly Planning.” Computers & Operations Research 34: 552–577. doi:https://doi.org/10.1016/j.cor.2005.03.013.
- Lee, H.-S., H.-S. Cho, J.-H. Cho, and J.-M. Lee. 2015. “A Study on Analysis of Waste Resources Circulation Flow of End of Life Vehicles.” Korea Environment Institute, 1–188.
- Lee, D.-H., H.-J. Kim, G. Choi, and P. Xirouchakis. 2004. “Disassembly Scheduling: Integer Programming Models.” Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture 218: 1357–1372. doi:https://doi.org/10.1243/0954405042323586.
- Lee, D.-H., and P. Xirouchakis. 2004. “A two-Stage Heuristic for Disassembly Scheduling with Assembly Product Structure.” Journal of the Operational Research Society 55: 287–297. doi:https://doi.org/10.1057/palgrave.jors.2601690.
- Liu, Z., K. W. Li, B. Y. Li, J. Huang, and J. Tang. 2019. “Impact of Product-Design Strategies on the Operations of a Closed-Loop Supply Chain.” Transportation Research Part E: Logistics and Transportation Review 124: 75–91. doi:https://doi.org/10.1016/j.tre.2019.02.007.
- Mahadevan, B., D. F. Pyke, and M. Fleischmann. 2003. “Peridoic Review, Push Inventory Policies for Remanufacturing.” European Journal of Operational Research 151: 536–551. doi:https://doi.org/10.1016/S0377-2217(02)00627-6.
- Min, J. U., and H. K. Ha. 2006. “Aligning Reverse Logistics Into a Sustainable and Scalable Business Organization – A Benchmarking Study in High-Tech Industry.” Journal of International Logistics and Trade 4: 93–111. doi:https://doi.org/10.24006/jilt.2006.4.1.93.
- Nagurney, A., and F. Toyasaki. 2005. “Reverse Supply Chain Management and Electronic Waste Recycling: A Multitiered Network Equilibrium Framework for e-Cycling.” Transportation Research Part E: Logistics and Transportation Review 41: 1–28. doi:https://doi.org/10.1016/j.tre.2003.12.001.
- Neuendorf, K.-P., D.-H. Lee, D. Kiritsis, and P. Xirouchakis. 2001. “Disassembly Scheduling with Parts Commonality Using Petri Nets with Timestamps.” Fundam. Inform 47: 295–306.
- Özceylan, E., T. Paksoy, and T. Bektaş. 2014. “Modeling and Optimizing the Integrated Problem of Closed-Loop Supply Chain Network Design and Disassembly Line Balancing.” Transportation Research Part E: Logistics and Transportation Review 61: 142–164. doi:https://doi.org/10.1016/j.tre.2013.11.001.
- Sheu, J. B., Y. H. Chou, and C. C. Hu. 2005. “An Integrated Logistics Operational Model for Green-Supply Chain Management.” Transportation Research Part E: Logistics and Transportation Review 41: 287–313. doi:https://doi.org/10.1016/j.tre.2004.07.001.
- Sung, J., and B. Jeong. 2014. “A Heuristic for Disassembly Planning in Remanufacturing System.” The Scientific World Journal.
- Taleb, K. N., and S. M. Gupta. 1997. “Disassembly of Multiple Product Structures.” Computers & Industrial Engineering 32: 949–961. doi:https://doi.org/10.1016/S0360-8352(97)00023-5.
- Taleb, K. N., S. M. Gupta, and L. Brennan. 1997. “Disassembly of Complex Product Structures with Parts and Materials Commonality.” Production Planning & Control 8: 255–269. doi:https://doi.org/10.1080/095372897235316.
- Ullerich, C., and U. Buscher. 2013. “Flexible Disassembly Planning Considering Product Conditions.” International Journal of Production Research 51: 6209–6228. doi:https://doi.org/10.1080/00207543.2013.825406.
- Wenstøp, F. 2010. “Operations Research and Ethics: Development Trends 1966-2009.” International Transactions in Operational Research 17: 413–426. https://doi.org/https://doi.org/10.1111/j.1475-3995.2009.00730.x.