Is Too Little Transmission Capacity Being Built? – If So, Why?

&
Pages 46-54 | Published online: 10 Apr 2008

References

  • Averch , H. A. and Johnson , L. L. 1962 . Behaviour of the firm under regulatory constraint. . Am Econ Rev , 52 : 1053 – 1069 .
  • Birol , F. 2004 . Power to the people – the world outlook for electricity investments. . IAEA bull , 46/1
  • Copenhagen Economics . 2006 . “ The economic consequences of capacity limitations on the Oresund connection. ” . Copenhagen : Copenhagen Economics . [15 January 2007]. Available from: http://www.copenhageneconomics.com/publications/Capacity_limitations.pdf
  • CEER . 2002 . “ CEER technical background paper, inter‐TSO compensation mechanism: locational signals. ” . Brussels : Council of European Energy Regulators . [15 January 2007]. Available from: http://www.ceer.eu
  • Damsgard , N. and Green , R. 2005 . Regulatory reform in the Swedish electricity industry – good or bad? . SNS occasional paper No 95, ISSN 1400‐2159
  • Daxhelet , O. and Smeers , Y. 2005 . Inter‐TSO compensation mechanism. . Cambridge Massachussetts [2005 Nov 7; 15 January 2007]; Available from: http://www.ksg.harvard.edu/hepg/
  • European Commission . 1996 . Directive 96/92/EC of the European Parliament and of the Council of 19 December 1996 concerning common rules for the internal market in electricity. . Off J , 30/01/1997
  • European Commission . 2003 . Directive 2003/54/EC of the European Parliament and of the Council of 26 June 2003 concerning common rules for the internal market in electricity and repealing Directive 96/92/EC. . Off J Eur Union , 15/07/2003
  • European Commission . 2006 . “ Inquiry pursuant to Article 17 of Regulation (EC) No 1/2003 into the European gas and electricity sectors (Final Report). ” . Brussels : EC (Communication from the Commission) .
  • European Parliament and Council . 2003 . “ Regulation No 1228/2003 on conditions for access to the network for cross‐border exchanges in electricity. ” . Brussels : EC . [2003 Jun; 15 January 2007]. Available from: http://www.europa.eu.int/comm/energy/electricity/index_en.htm
  • E.R.G.E.G. 2006 . “ Cross‐border framework for transmission network infrastructure – an ERGEG public consultation paper. ” . Brussels : Council of European Energy Regulators . [15 January 2007]. Available from: http://www.ceer.eu
  • EU's Director‐General for Transport and Energy . 2005 . “ Green Paper on energy efficiency or doing more with less. ” . Brussels : EC . 2005 Jun, COM(2005) 265
  • Hogan , W. W. 2003 . “ Transmission market design. ” . Paper presented at: Electricity deregulation – Where to from here?; 2003 Apr 4; Texas A&M University
  • Leonhard , W. and Müller , K. 2002 . “ Balancing fluctuating wind energy with fossil power stations – where are the limits? ” . Electra, Oct.
  • Nilsson , M. and Gustafsson , K. 2007 . Prices across the markets – how the German coal‐based electricity price may affect the Swedish nuclear/hydro‐based system. . Miner Energy , 21 (3,4) : 57 – 67 .
  • Sharman , H. 2005 . Why wind power works for Denmark. . Civ Eng , 158(May) : 66 – 72 .
  • White , D. 2004 . “ Reduction in carbon dioxide emissions: Estimating the potential contribution from wind‐power. ” . Report Commissioned by the Renewable Energy Foundation

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.