References
- Blischke, W. R. & Murthy, D. N. P. 2000, Reliability — Modelling, Prediction and Optimization. New York: John Wiley & Sons, Inc.
- Cavory, G., Dupas, R. & Goncalves, G. 2001, “A genetic approach to the scheduling of preventive maintenance tasks on a single product manufacturing production line”, Int. J. of Production Economics, Vol. 74, No. 1, pp. 135-146.
- Chareonsuk, C., Nagarur, N. & Tabucanon, M. T. 1997, “A multicriteria approach to the selection of preventive maintenance intervals”, Int. J. of Production Economics, Vol. 49, No. 1, pp. 55-64.
- Dallery, Y. & Bihan, H. L. 1999, “An improved decomposition method for the analysis of production lines with unreliable machines and finite buffers”, Int. J. of Production Research, Vol. 37, No. 5, pp. 1093-1117.
- Ebeling, C. E. 1997, An Introduction to Reliability and Maintainability Engineering, New York: The McGraw-Hill Company, Inc.
- Kelly, A. 1984, Maintenance Planning and Control, Cambridge: Butterworth & Co Ltd.
- Liberopoulos, G. & Tsarouhas, P. 2004, “Reliability analysis of an automated pizza production line”, J. of Food Engineering, In press.
- Miltenburg, J. 2000, “The effect of breakdowns on U-shaped production lines”, Int. J. of Production Research, Vol. 38, No. 2, pp. 352-364.
- Percy, D. F., Kobbacy, K. A. H. & Fawzi, B. B. 1997, “Setting preventive maintenance schedules when data are sparse”, Int. J. of Production Economics, Vol. 51, No. 2, pp. 223-234.
- Pham, H. (ed.) 2003, Handbook of Reliability Engineering, London: Springer.
- Sun, Y., Ma, L. & Mathew, J. 2004, “Reliability prediction of repairable systems for single component repair”, In J. Lee. (ed.) Proceedings of International Conference on Intelligent Maintenance System, Arles, France, pp. S2-A. IMS.