References
- ARPANSA. 2001, “Regulatory Assessment Principles for Controlled Facilities”, RB-STD-42-00 rev 1, Australian Radiation Protection and Nuclear Safety Agency, Regulatory Branch, October.
- Barón, J., Núñez, J. & Rivera, S. 1996, “A Level III PSA for the Inherently Safe CAREM-25 Nuclear Power Station”, Probabilistic Safety Assessment and Management 96, Cacciabue & Papazoglou (Eds), 1996 Springer-Verlag, London, ISBN 3-540-76051-2, pp. 553-558.
- Barón, J., Núñez, J. & Rivera, S. 2002, “Human Reliability Analyses to consider Common Cause Failures for a Research Reactor during its Design Phase”, Probabilistic Safety Assessment and Management PSAM-VI, Bonano et al. (Eds), 2002 Elsevier, UK, ISBN 0-08-044121-1.
- Bastin, S. & Witt, H. 1991, “Reliability models for overpressure protection systems on offshore platforms”, Commercial report ANSTO/C 230.
- Bastin, S. 1994, “Determination of Proof Test Periods of Instrumentation in the Combined Safety System of an Offshore Platform by Risk Criteria”, Commercial report ANSTO/C 346.
- Bastin, S., Barón, J., Núñez, J., McLeod, J., Rivera, S. & Perera, J. 2004, “Probabilistic Safety Assessment of the Australian Replacement Research Reactor”, Risk 2004 National Conference, 8-10 November, Melbourne, Paper 215.
- Corran, E., Bastin, S. & Witt, H. 1990, “Reliability Analysis of a wellhead shutdown system”, Commercial report ANSTO/C 140.
- IAEA. 1988, “Component Reliability Data for use in Probabilistic Safety Assessment”, TECDOC-478, International Atomic Energy Agency, Vienna.
- IAEA. 1989, “Application of Probabilistic Safety Assessment to Research Reactors”, TECDOC-517, International Atomic Energy Agency, Vienna.
- IAEA. 1993,"Probabilistic Safety Assessment for Seismic Events”, TECDOC-724, International Atomic Energy Agency, Vienna.
- IAEA. 1995, “Treatment of External Hazards in Probabilistic Safety Assessment for Nuclear Power Plants”, Safety Series No. 50-P-7, International Atomic Energy Agency, Vienna.
- IAEA. 1997, “Generic Component Reliability data for Research Reactor PSA”, TECDOC-930, International Atomic Energy Agency, Vienna.
- IGNS. 1999, “Seismic Hazards Analysis — Lucas Heights, site of the High Flux Australian Reactor”, IGNS, December.
- INEL. 2003, “Systems Analysis Programs for Handson Integrated Reliability Evaluations (SAPHIRE) Version 6.54”, Idaho National Engineering Laboratory, Lockheed Martin Idaho Technologies Company, Inc., USA, Fall.
- INVAP. 2004, “Probabilistic Safety Assessment (PSA)”, ANSTO Replacement Research Reactor Project, Prepared by INVAP for ANSTO, RRRP-7225-3BEIN-002-REVA, November.
- Stirling, M. W. & Berryman, K. R. 2001, “Extension to Lucas Heights Probabilistic Seismic Hazard Assessment”, IGNS, July.
- US-NRC. 1983, “PRA Procedures Guide”, NUREG/CR-2300, Nuclear Regulatory Commission, USA, 1983, pp. 3-21.
- USNRC. 1994, “Handbook of Methods for RiskBased Analyses of Technical Specifications”, NUREG/CR-6141, US Nuclear Regulatory Commission.