143
Views
0
CrossRef citations to date
0
Altmetric
Articles

Implementation of a reheat steam cycle to maximise electrical power from a circulating fluidised bed multi-fuel cogeneration facility at an alumina refinery expansion

&
Pages 120-130 | Received 01 Aug 2014, Accepted 07 Oct 2014, Published online: 18 Nov 2015

References

  • EN 12952-12. 2003. Water-tube Boilers and Auxiliary Installations – Part 12: Requirements for Boiler Feedwater and Boiler Water Quality. European Committee for Standardization, Brussels.
  • Kautsky, B., and D. Kopecky. 2007. “Pulling Out all the Stops for Plant Efficiency – Novel Options with lower Costs and Risks Tailored to Fuel and Site Variability.” Electric Power Conference, Chicago, May 1–3.
  • MacDonald D. K., and D. M. Madden. 1997. “B&W’s Advanced Coal-fired Low Emission Boiler System Commercial Generating Unit and Proof-of-Concept Generation Plant”. ASME International Joint Power Generation Conference, Denver, November 3–5.
  • VGB-M 418 Le. 2002. Organic Matter and Dissolved Carbon Dioxide in the Steam Water Circuit of Power Plant. VGB PowerTech Service Instruction Sheet, Essen.
  • Pennington, I. 2013. Multi-fuel CFB Boilers in Unique Back-Pressure Reheat Cycle Cogeneration Project. PowerGen Asia, Bangkok, October 2–4.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.