476
Views
1
CrossRef citations to date
0
Altmetric
Articles

Implications of governance obligations being embedded within construction contractors’ tendering procedures

ORCID Icon & ORCID Icon
Pages 93-105 | Received 30 Sep 2019, Accepted 23 Feb 2020, Published online: 29 Feb 2020

References

  • ABS (Australian Bureau of Statistics). 2013. Private Sector Construction Industry Australia 8772.0. Accessed 12 May 2019. http://www.ausstats.abs.gov.au/ausstats/subscriber.nsf/0/9798157B9BCEDB58CA257B960014FEBA/$File/87720_2011-12.pdf
  • Argote, L. 2011. “Organizational Learning Research: Past, Present and Future.” Management Learning 42 (4): 439–446. doi:10.1177/1350507611408217.
  • Asgari, S., R. Awwad, A. Kandi, and I. Odeh. 2016. “Impact of considering Need for Work and Risk on Performance of Construction Contractors: An Agent-based Approach.” Automation in Construction 65: 9–20. doi:10.1016/j.autcon.2016.01.004.
  • Ashurst Australia. 2014. Scope for Improvement 2014, Project Pressure Points – Where Industry Stands. Accessed 12 January 2017. http://www.constructors.com.au/wp-content/uploads/2015/09/Scope-for-Improvement-2014.pdf
  • Australian Securities Exchange Corporate Governance Council. 2019. Corporate Governance Principles and Recommendations. 4. available from. Accessed 26 May 2019 https://www.asx.com.au/documents/asx-compliance/cgc-principles-and-recommendations-fourth-edn.pdf
  • Ballesteros-Pérez, P., M. C. González-Cruz, J. P. Pastor-Ferrando, and M. Fernández-Diego. 2012. “The iso-Score Curve Graph. A New Tool for Competitive Bidding.” Automation in Construction 22: 481–490. doi:10.1016/j.autcon.2011.11.007.
  • Brook, M. 2011. Estimating and Tendering for Construction Work. 4 ed. London, UK: Spon Press.
  • Checkland, P. 2000. “Soft Systems Methodology: A Thirty Year Retrospective.” Systems Research and Behavioral Science 17 (SUPPL): S11–S58.
  • CoA (AustralianCommonwealth). Competition and Consumer Act 2010, Australian Government, Canberra, https://www.legislation.gov.au/Details/C2011C00003
  • Cooper, R. G. 2014. “What’s Next? After Stage-gate.” Research Technology Management 57 (1): 20–31. doi:10.5437/08956308X5606963.
  • Crosby, P. 2017. “Shaping Complex Mega-projects: Practical Steps for Success.” Australian Journal of Civil Engineering 15 (1): 1–19. doi:10.1080/14488353.2017.1362806.
  • Blake Dawson. 2011. Scope for Improvement 2011 - Project Risk - Getting The Right Balance and Outcomes. Australia: Blake Dawson.
  • Dept for Business, Energy and Industrial Strategy. 2017. Corporate Governance Reform: The Government response to the green paper consultation, Accessed 01 March 2018. https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/640631/corporate-governance-reform-government-response.pdf
  • Drew, D., and M. Skitmore. 1997. “The Effect of Contract Type and Size on Competitiveness in Bidding.” Construction Management and Economics 15 (5): 469–489. doi:10.1080/014461997372836.
  • Egemen, M., and A. N. Mohamed. 2007. “A Framework for Contractors to Reach Strategically Correct Bid/no Bid and Mark-up Size Decisions.” Building and Environment 42: 1373–1385. doi:10.1016/j.buildenv.2005.11.016.
  • Faherty, A. 2015. “A Team Effort.” Company Director 31 (6): 38–41.
  • Fellows, R., and A. Liu. 2008. Research Methods for Construction. 3 ed. UK: Wiley-Blackwell.
  • Financial Reporting Council. 2016. UK Corporate Governance Code. Accessed 01 March 2018. https://frc.org.uk/directors/corporate-governance-and-stewardship/uk-corporate-governance-code
  • Greenhalgh, B. 2013. Introduction to Estimating for Construction. London, UK: Routledge.
  • Jarkas, A. M., S. A. Mubarak, and C. Y. Kadri. 2014. “Critical Factors Determining Bid/No Bid Decisions of Contractors in Qatar.” Journal Management in Engineering 30 (4): 05014007.
  • Krippendorff, K. 2013. Content Analysis: An Introduction to Its Methodology. 3 ed. CA, USA: Sage.
  • Laryea, S. 2013. “Nature of Tender Review Meetings.” Journal of Construction Engineering and Management 139 (8): 927–940. doi:10.1061/(ASCE)CO.1943-7862.0000662.
  • Laryea, S., and W. Hughes. 2008. “How Contractors Price Risk in Bids: Theory and Practice.” Construction Management and Economics 26 (9): 911–924. doi:10.1080/01446190802317718.
  • Laryea, S., and W. Hughes. 2009. “Commercial Reviews in the Tender Process of Contractors.” Engineering, Construction and Architectural Management 16 (6): 558–572. doi:10.1108/09699980911002575.
  • Laryea, S., and W. Hughes. 2011. “Risk and Price in the Bidding Process of Contractors.” Journal of Construction Engineering and Management 137 (4): 248–258. doi:10.1061/(ASCE)CO.1943-7862.0000293.
  • Leedy, P. D., and J. E. Ormrod. 2013. Practical Research Planning and Design. 10 ed. Upper Saddle River, NJ, USA: Pearson Education.
  • Loosemore, M., and S. Reid. 2019. “The Social Procurement Practices of Tier-one Construction Contractors in Australia.” Construction Management and Economics 37 (4): 183–200. doi:10.1080/01446193.2018.1505048.
  • Love, P. E. D., C. P. Sing, B. Carey, and J. T. Kim. 2015. “Estimating Construction Contingency: Accommodating the Potential for Cost Overruns in Road Construction Projects.” Journal of Infrastructure Systems 21 (2): 04014035. doi:10.1061/(ASCE)IS.1943-555X.0000221.
  • Love, P. E. D., D. J. Edwards, and J. Smith. 2016. “Rework Causation: Emergent Theoretical Insights and Implications for Research.” Journal of Construction Engineering and Management 142: 6. doi:10.1061/(ASCE)CO.1943-7862.0001114.
  • Love, P. E. D., G. D. Holt, and H. Li. 2002. “Triangulation in Construction Management Research.” Engineering, Construction and Architectural Management 9 (4): 294–303.
  • Mochtar, K., and D. Arditi. 2001. “Pricing Strategy in the US Construction Industry.” Construction Management and Economics 19 (4): 405–415. doi:10.1080/01446190010020372.
  • Ryan, P., and C. Duffield, “Contractor Performance on MEGA Projects – Avoiding the Pitfalls”, Working Paper Series, Proceedings of the EPOC-MW Conference, 2017, pp. 1–34, http://hdl.handle.net/11343/168246
  • Securities, Australian, and Investments Commission. 2019. Australian Insolvency Statistics Released May 2019 Series 1A: Companies Entering External Administration by Industry July 2013 – March 2019. Accessed 12 May 2019. https://download.asic.gov.au/media/5109589/asic-insolvency-statistics-series-1a-published-may-2019.pdf
  • Sharkey, J., M. Bell, W. Jocic, and R. Marginean, 2014. Standard Forms of Contract in the Australian Construction Industry Research Report, University of Melbourne.
  • Shokri-Ghasabeh, M., and N. Chileshe. 2014. “Knowledge Management Barriers to Capturing Lessons Learned from Australian Construction Contractors Perspective.” Construction Innovation 14 (1): 108–134. doi:10.1108/CI-06-2013-0026.
  • Shokri-Ghasabeh, M., and N. Chileshe. 2016. “Critical Factors Influencing the Bid/no Bid Decision in the Australian Construction Industry.” Construction Innovation 16 (2): 127–157. doi:10.1108/CI-04-2015-0021.
  • Smith, N. J., T. Merna, and P. Jobling. 2006. Managing Risk in Construction Projects. Oxford, UK: Blackwell Publishing.
  • Urquhart, S., A. Whyte, and N. Lloyd. 2017. “The Development of a More Efficient Internal Tender Procedure Framework for Australian Construction Contractors.” In Proceedings of the 33rd Annual ARCOM Conference, edited by P. W. Chan and C. J. Neilson, 693–702. Cambridge, UK: Association of Researchers in Construction Management.
  • Urquhart, S., and A. Whyte. 2018b. “Impact of Contractor Internal Tendering Procedure Governance on Tender Win-Rates: How Procedures Can Be Improved.” In Proceeding of the 34th Annual ARCOM Conference, edited by C. Gorse and C. J. Neilson, 796–805. Belfast, UK: Association of Researchers in Construction Management.
  • Urquhart, S., and A. Whyte. 2018a. “Contractor Tendering Research: Going beyond Bid/no-bid and Markup Models.” Proceedings of the Institution of Civil Engineers - Management, Procurement and Law 170 (6): 255–262. doi:10.1680/jmapl.17.00039.
  • Urquhart, S., and A. Whyte. 2018c. “Rethinking the Tendering Frameworks of Construction Contractors in the Context of a Soft Systems Methodology Approach.” Frontiers of Engineering Management 5 (3): 369–380.
  • Whyte, A., and C. Cammarano. 2012. “Value Management in Infrastructure Projects in Western Australia: Techniques and Staging.” In Proceedings of the 28th Annual ARCOM Conference, edited by S. D. Smith, 797–806. Edinburgh, UK: Association of Researchers in Construction Management.
  • Whyte, A. 2015. Integrated Design and Cost Management for Civil Engineers. Florida: CRC Press.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.