References
- Bruland, A. 1998. Hard Rock Tunnel Boring. Trondheim: Norwegian University of Science and Technology (NTNU).
- Jennifer, G., D. Eduardo, and J. K. Alain. 2009. “Estimating Thermal Contact Resistance Using Sensitivity Analysis and Regularization.” Engineering Analysis with Boundary Elements 33: 54–62. doi:10.1016/j.enganabound.2008.04.001.
- Rostami, J. 1992. Design Optimization, Performance Prediction and Economic Analysis of Tunnel Boring Machines for the Construction of Proposed Yucca Mountain Nuclear Waste Repository, 131. Golden, CO, Colorado school of mines: Department of mining engineering.
- Rostami, J. 1997. Development of a Force Estimation Model for Rock Fragmentation with Disc Cutters through Theoretical Modeling and Physical Measurement of Crushed Zone Pressure, 162. Golden, CO, Colorado school of mines: Department of mining engineering.
- Rostami, J., and L. Ozdemir. 1993. “A New Model for Performance Prediction of Hard Rock TBMs.” In: RETC proceedings, New York, 793–809.
- Rostami, J., L. Ozdemir, and B. Nilson. 1996. “Comparison between CSM and NTH Hard Rock TBM Performance Prediction Models.” Proceedings of Annual Technical Meeting of the Institute of Shaft Drilling Technology, Las Vegas, 1–10.
- Sanio, H. P. 1985. “Prediction of the Performance of Disc Cutters in an Isotropic Rock.” International Journal of Rock Mechanics and Mining Sciences & Geomechanics Abstracts 22 (3): 153–161. doi:10.1016/0148-9062(85)93229-2.
- Song, K.Z., K. An, D.J. Yuan Da-Jun and Wang M. 2009. “Study on Fuzzy Dynamic Control for Optimum S/P of TBM Disc Cutters.” Journal of Basic Science and Engineering 17 (3): 412–420.
- Tan, Q., J.F. Li, Y.M. Xia, Zi-jun XU, Yi Zhu, and Jia Zhang 2013. “Numerical Research on Rock Fragmentation Process by Disc Cutter.” Rock and Soil Mechanics 9:2707–2714.
- Wang, L. H., C. Y. Qu, Y. L. Kang, C. X. Su, Y. Q. Wang, and Z. X. Cai. 2011. “A Mechanical Model to Estimate the Disc Cutter Wear of Tunnel Boring Machines.” Advances Science Letters 4: 2433–2439. doi:10.1166/asl.2011.1604.
- Wu, Q. X. 2011. Mechanical Analysis of Rock Breaking by Disc Cutter during Shield Tunneling in Mixed Face Ground Conditions. Guangzhou: Jinan University.
- Zhang, N. C., H. Wang, and S. Y. Zhang. 2009. “Comparative Analysis of Rock Breaking Efficient and Wearing between 17 in Disc Cutter and 19 in Disc Cutter.” Tunnel Construction 9 (1): 123–126.
- Zhao, X. X., and Y. D. Gong. 2015. “Loading Distribution in Rock-Fragmentation Contact Zone of TBM Disc Cutter Bing Cutters.” Chinese Journal of Construction Machinery 02: 168–172.