101
Views
26
CrossRef citations to date
0
Altmetric
Original Articles

Multi-Item, Multi-Period Production Planning with Uncertain Demand

&
Pages 891-900 | Received 01 Nov 1993, Accepted 01 Feb 1996, Published online: 13 Sep 2016

References

  • Baker, K.R. (1977) An experimental study of the effectiveness of rolling schedules in production planning. Decision Sciences, 8, 19–27.
  • Bertsekas, D.P. (1987) Dynamic Programming: Deterministic and Stochastic Models, Prentice-Hall, Englewood Cliffs, NJ.
  • Bitran, G.R. and Yanasse, H.H. (1985) Deterministic approximations to stochastic production problems. Operations Research, 32, 999–1018.
  • Elmaghraby, S.E. (1978) The economic lot scheduling problem (ELSP): review and extensions. Management Science, 24, 587–598.
  • Evans, R.V. (1967) Inventory control of a multi-product system with a limited production resource. Naval Research Logistics Quarterly, 14(2), 173–184.
  • Everett, H. (1966) Generalized Lagrange multiplier method for solving problems of optimum allocation of resources. Operations Research, 11, 399–417.
  • Fisher, M.L. (1981) Lagrangian relaxation method for solving integer programming problems. Management Science, 27, 1–18.
  • Gascon, A. (1987) The lookahead heuristic for multi-item single machine production scheduling with dynamic, stochastic demands. INFOR, 26, 114–126.
  • Gascon, A. and Leachman, R.C. (1988) A dynamic programming solution to the dynamic, multi-item, single-machine scheduling problem. Operations Research, 36, 50–56.
  • Graves, S.C. (1980) The multi-product production cycling problem. IIE Transactions, 12, 233–240.
  • Haneveld, W.K.K. (1988) A stochastic programming approach to multiperiod production planning. Research Memorandum 276, University of Groningen, Institute of Economic Research.
  • Held, M., Wolfe, P. and Crowder, H.P. (1974) Validation of subgradient optimization. Mathematical Programming, 6, 62–88.
  • Khang, D.B. and Fujiwara, O. (1993) Multi-period stochastic network flow problems with service level requirements: approximation and error estimates. IIE Transactions, 25, 104–110.
  • Leachman, R.C. and Gascon, A. (1988) A heuristic scheduling policy for multi-item, single-machine production systems with time-varying, stochastic demands. Management Science, 34, 377–390.
  • Luss, H. and Gupta, S.K. (1975) Allocation of effort resources among competing activities. Operations Research, 23, 360–366.
  • Nemhauser, G.L. and Wolsey, L.A. (1988) Integer and Combinatorial Optimization, Wiley, New York.
  • Peters, R.J., Boskma, K. and Kupper, H.A.E. (1977) Stochastic programming in production planning: a case with non-simple recourse. Statistica Neerlandica, 31, 113–126.
  • Sox, C.R. (1994) A heuristic for stochastic production planning, in Burke, L. and Jackman, J., editors, Proceedings of the Third Industrial Engineering Research Conference, IIE, pp. 94–99.
  • Williams, J.F. (1983) A hybrid algorithm for simultaneous scheduling of production and distribution in multi-echelon structures. Management Science, 29, 77–92.
  • Zipkin, P.H. (1980) Simple ranking methods for allocation of one resource. Management Science, 26(1), 34–43.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.