References
- Blocher, J.D. (1992) Single machine changeover scheduling. Ph.D. dissertation, Purdue University.
- Blocher, J.D. and Chand, S. (1996) A forward branch-and-search algorithm and forecast horizon results for the changeover scheduling problem. European Journal of Operational Research91, 456–470.
- Bruno, J. and Downey, P. (1978) Complexity of task sequencing with deadlines, setup times, and changeover costs. Society for Industrial and Applied Mathematics Journal of Computing, 7, 393–404.
- Cattrysse, D., Salomon, M., Kuik, R. and Van Wassenhove, L.N. (1993) A dual ascent and column generation heuristic for the discrete lotsizing and scheduling problem with setup times. Management Science, 39, 477–486.
- Gascon, A. and Leachman, R. (1988) A dynamic programming solution to the dynamic, multi-item, single-machine scheduling problem. Operations Research, 36(1), 50–56.
- Glassey, C.R. (1968) Minimum change-over scheduling of several products on one machine. Operations Research, 16, 342–352.
- Magnanti, T.L. and Vachani, R. (1990) A strong cutting plane algorithm for production scheduling with changeover costs. Operations Research, 38(3), 456–473.
- Mitsumori, S. (1972) Optimum production scheduling of multicommodity in flow line. IEEE Transactions, SMC2(9), 486–493.
- Salomon, M., Kroon, L.G., Kuik, R. and Van Wassenhove, L.N. (1991) Some extensions of the discrete lotsizing and scheduling problem. Management Science, 37, 801–812.