13
Views
7
CrossRef citations to date
0
Altmetric
Original Articles

Lot Scheduling in a Two-Machine Cell with Swapping Devices

, &
Pages 911-917 | Received 01 Nov 1994, Accepted 01 Feb 1996, Published online: 13 Sep 2016

References

  • Agnetis, A., Pacciarelli, D. and Rossi, F. (1994) Batch scheduling in a two machine flow shop with limited buffer. Discrete Applied Mathematics in press.
  • Crama, Y. and van de Klundert, J. (1994) Cyclic scheduling of identical parts in a robotic cell. Maastricht Research School of Economics of Technology and Organizations, working paper RM/0/94-014.
  • Gilmore, P.C. and Gomory, R.E. (1964) Sequencing of a one-state variable machine: a solvable case of the traveling salesman problem. Operations Research, 12, 655–679.
  • Hall, N.G., Kamoun, H. and Sriskandarajah, C. (1993a) Scheduling in robotic cells: two machine cells and identical parts. Working paper 93–56, College of Business, The Ohio State University.
  • Hall, N.G., Kamoun, H. and Sriskandarajah, C. (1993b) Scheduling in robotic cells: large cells. Working paper 93–55, College of Business, The Ohio State University.
  • Johnson, S.M. (1954) Optimal two- and three-stage production schedules with set-up times included. Naval Research Logistics Quarterly, 1, 61–68.
  • Kise, H., Karuno, Y. and Matsumoto, H. (1993) Simultaneous optimization of tool allocation and scheduling for FMSs: an application of simulated annealing, in Takamori, T. and Tsuchiya, K. (eds). Robotics, Mechatronics and Manufacturing Systems, Elsevier, Amsterdam (North Holland), pp. 557–564.
  • Kise, H., Shioyama, T. and Ibaraki, T. (1991) Automated two-machine flowshop scheduling: a solvable case. IIE Transactions, 23(1), 10–16.
  • Papadimitriou, C.H. and Kanellakis, P.C. (1980) Flowshop scheduling with limited temporary storage. Journal of the Association for Computing Machinery, 27(3), 533–549.
  • Sethi, S.P., Sriskandarajah, C., Sorger, G., Blazewicz, J. and Kubiak, W. (1992) Sequencing of parts and robot moves in a robotic cell. International Journal of Flexible Manufacturing Systems, 4, 331–358.
  • Talavage, J. and Hannam, R.G. (1988) Flexible Manufacturing Systems in Practice, Marcel Dekker, New York.
  • Wismer, D.A. (1972) Solution of the flowshop scheduling problem with no intermediate queues. Operations Research, 20, 689–697.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.