REFERENCES
- Ali, M. R., and Omar, M. B. 2005. Fault tree modelling of computer system security. Int. J. Comput. Math. 82:805–819.
- Bhangu, N. S., Singh, R., and Pahuja, G. L. 2011. Reliability centered maintenance in a thermal power plant: A case study. Int. J. Prod. Qual. Manage. 7:209–228.
- Clifton, A. E. 1999. Fault tree analysis—A history. Int. Syst. Saf. Conf. 17:1–9.
- Haihong, Z., Shixao, Z., Joanne, B. D., and Kevin, J. S. 2001. A benchmark for quantitative fault tree reliability analysis. Ann. Reliab. Maintain. Symp. IEEE 8:86–93.
- Hora, C., and Catanase, A. 2004. Fault tree analysis used in a thermo-electric power plant Oradea, Romania. Trans. Mech., Univ. Timisoara 6:109–112.
- Karuppusami, G., and Gandhinathan, R. 2006. Pareto analysis of critical success factors of total quality management: A literature review and analysis. TQM Mag. 18:372–385.
- Lee, W. S., Grosh, D. L., Tillman, F. A., and Lie, C. H. 1985. Fault tree analysis, methods, and applications—A review. IEEE Trans. Reliab. 34:194–203.
- Oke, S. A., Ofiabulu, C. E., Banjo, A. A., Akanbi, O. G., and Oyawale, F. A. 2008. The combined application of quality function development and Pareto analysis for hotel services improvement. Int. J. Prod. Qual. Manage. 3:241–262.
- Olcay, K., and Recep, O. 2003. Thermal power plants in Turkey. Energy Sources 25:135–151.
- Ramesh, V., and Saravannan, R. 2011. Reliability assessment of a co-generation power plant in sugar mill using fault tree analysis. Energy Sources, Part A 33:1168–1183.
- Srinath, L. S. 2003. Reliability Engineering. New Delhi, India: East-West Press Pvt. Ltd.
- Zhenjie, L., Yue, Y., and Bowen, W. 2010. Reliability evaluation of flood releasing structures power supply of hydroelectric power station by fault tree analysis. IEEE Power and Energy Engineering Conference, Asia Pacific, March 28–31, pp. 1–5.