References
- Ahmad, A., A. El-Shafie, S. F. M. Razali, and Z. S. Mohamad. 2014. Reservoir optimization in water resources: A review. Water Resources Management 28:3391–405. doi:10.1007/s11269-014-0700-5.
- Anagnostopoulos, J. S., and D. E. Papantonis. 2007a. Optimal sizing of a run-of-river small hydropower plant. Energy Conversion and Management 48 (10):2663–70. doi:10.1016/j.enconman.2007.04.016.
- Anagnostopoulos, J. S., and D. E. Papantonis. 2007b. Pumping station design for a pumped storage wind-hydro power plant. Energy Conversion and Management 48 (11):3009–17. doi:10.1016/j.enconman.2007.07.015.
- Bakos, G. C. 2002. Feasibility study of a hybrid wind/hydro power-system for low-cost electricity production. Applied Energy 72:599–608. doi:10.1016/S0306-2619(02)00045-4.
- Bellman, R. 1957. Dynamic programming. Princeton, N.J.: Princeton University Press.
- Bellman, R., and S. Dreyfus. 1962. Applied dynamic programming. Princeton, N.J.: Princeton University Press.
- Black, M., and G. Strbac. 2006. Value of storage in providing balancing services for electricity generation systems with high wind penetration. Journal of Power Sources 162:949–53. doi:10.1016/j.jpowsour.2005.07.020.
- De Ladurantaye, D., M. Gendreau, and J. Y. Potvin. 2009. Optimizing profits from hydroelectricity production. Computers & Operations Research 36:499–529. doi:10.1016/j.cor.2007.10.012.
- Felipe, M. P., and T. A. Arcilan. 2015. Simulating reservoir storage for a wind-hydro hybrid system. Renewable Energy 76:757–67. doi:10.1016/j.renene.2014.11.047.
- Gaydaa, A. Z., H. Patrick, R. Christian, and B. Philippe. 2016. The contribution of wind-hydro pumped storage systems in meeting Lebanon’s electricity demand. International Journal of Hydrogen Energy 41 (17):6996–7004. doi:10.1016/j.ijhydene.2016.01.028.
- General Directorate of State Hydraulic Works (DSİ). 2015. General Directorate of State Hydraulic Works (DSİ), Ankara, Turkey
- Giles, J., and W. Wunderlich. 1981. Weekly multipurpose planning model for TVA reservoir system. Journal of Water Resources Planning and Management 107 (2):495–511.
- Haddad, O., M. Moradi-Jalal, and M. A. Mariño. 2011. Design–Operation optimisation of run-of-river power plants. Proceedings of the Institution of Civil Engineers-Water Management 164 (9):463–75. doi:10.1680/wama.2011.164.9.463.
- Hall, W., R. Harboe, W. Yeh, and A. Askew. 1969. Optimum firm power output from a two reservoir system by incremental dynamic programming. Los Angeles: Water Research Center, University of California.
- Hedegaard, K., and P. Meibom. 2012. Wind power impacts and electricity storage - A time scale perspective. Renewable Energy 37 (1):318–24. doi:10.1016/j.renene.2011.06.034.
- Hessami, M. A., and D. R. Bowly. 2011. Economic feasibility and optimisation of an energy storage system for Portland Wind Farm (Victoria, Australia). Applied Energy 88 (8):2755–63. doi:10.1016/j.apenergy.2010.12.013.
- Hiedari, M., V. Chow, P. Kotovic, and D. Meredith. 1971. Discrete differencial dynamic programming approach to water resources system optimization. Water Resources Research 7 (2):2733–282.
- Huang, W., C. Murray, N. Kraus, and J. Rosati. 2003. Development of a regional neural retwork for coastal water level predictions. Ocean Engineering 30, (17):2275–95. doi:10.1016/S0029-8018(03)00083-0.
- Jothiprakash, V., and R. Arunkumar. 2014. Multi-reservoir optimization for hydropower production using NLP technique. KSCE-Journal of Civil Engineering 18 (1):344–54. doi:10.1007/s12205-014-0352-2.
- Kaldelis, J. 2002. Parametrical investigation of the wind-hydro electricity production solution for Aegean Archipelago. Energy Conversion and Management 43:2097–113. doi:10.1016/S0196-8904(01)00168-6.
- Kangrang, A., and C. Lokham. 2013. Optimal reservoir rule curves considering conditional ant colony optimization with simulation model. Journal of Applied Sciences 13, (1):263–67. doi:10.3923/jas.2013.154.160.
- Kapsali, M., and J. K. Kaldellis. 2010. Combining hydro and variable wind power generation by means of pumped-storage under economically viable terms. Applied Energy 87 (11):3475–85. doi:10.1016/j.apenergy.2010.05.026.
- Katsaprakakis D. A., D. G. Christakis, K. Pavlopoylos, S. Stamataki, I. Dimitrelou, I. Stefanakis, and P. Spanos. 2012. Introduction of a wind powered pumped storage system in the isolated insular power system of Karpathos-Kasos. Applied Energy 97:38–48. doi:10.1016/j.apenergy.2011.11.069.
- Kies, A., B. Schyska, D. T. Viet, L. von Bremen, D. Heinemann, and S. Schramm. 2017. Largescale integration of renewable power sources into the Vietnamese power system. Energy Procedia 125:207–13. doi:10.1016/j.egypro.2017.08.188.
- Köse, F., and M. N. Kaya. 2013. Analysis on meeting the electric energy demand of an active plant with a wind-hydro hybrid power station in Konya, Turkey: Konya water treatment plant. Renewable Energy 55:196–201. doi:10.1016/j.renene.2012.12.047.
- Labadie, J. W. 2004. Optimal operation of multi-reservoir systems: State-of-the-art. Journal of Water Resources Planning and Management 130 (2):93–111. doi:10.1061/(ASCE)0733-9496(2004)130:2(93).
- Larson, R. 1968. State increment dynamic programming. New York: Elsevier.
- Li, C., J. Zhou, S. Ouyang, X. Ding, and L. Chen. 2014. Improved decomposition– Coordination and discrete differential dynamic programming for optimization of larges hydropower system. Energy Conversion and Management 84:363–73. doi:10.1016/j.enconman.2014.04.065.
- Liu, P., S. Guo, X. Xu, and J. Chen. 2011. Derivation of aggregation-based joint operating rule curves for Cascade hydropower reservoirs. Water Resources Management 25:3177–200. doi:10.1007/s11269-011-9851-9.
- Loucks, D. P., and E. V. Beek. 2005. Water resources system planning and management: An Introduction to Methods, Modelsand Applications. Paris, London: United Nations Educational, Scientific and Cultural Organization.
- Maas, A. M. M., R. Hufschmidt, H. A. Dorfman Jr., S. A. Thomas, and G. M. F. Marglin. 1962. Design of water resources systems. Cambridge, MA: Harvard University Press.
- Nopmongcol, P., and A. Askew. 1997. Multi-level incremental dynamic programming. Water Resources Research 12 (6):1291–97. doi:10.1029/WR012i006p01291.
- Opan, M., “Multiobjective optimal operation in multiple reservoir systems,” Ph.D., Thesis, Kocaeli University, 2007.
- Rani, D., and M. M. Moreira. 2010. Simulation-optimization modeling: A survey and potential application in reservoir. Water Resources Management 24:1107–38. doi:10.1007/s11269-009-9488-0.
- Sert, M. 1987. System optimization in water resources planning. Kocaeli, Turkey: TUBITAK Marmara Scientific and Industrial Research Institute, Operations Research Department, Press.
- Sert, M., M. Öcal, N. Oktay, and M. Ertuğrul. 1983. Sakarya basin optimal energy production project. Kocaeli, Turkey: TUBITAK Marmara Scientific and Industrial Research Institute, Operations Research Department.
- Teegavarapu, R. S. V., and S. P. Simonovic. 2014. Simulation of multiple hydropower reservoir operations using system dynamics. Water Resources Management 28:1937–58. doi:10.1007/s11269-014-0586-2.
- Yakowitz, S. J. 1982. Dynamic programming applications in water resources. Water Resources Research 18 (4):673–96. doi:10.1029/WR018i004p00673.
- Yeh, W. 1985. Reservoir management and optimization models: A state of the art review. Water Resources Research 21 (12):1797–818. doi:10.1029/WR021i012p01797.
- Yi, J., J. Labadie, and S. Stitt. 2003. Dynamic optimal unit commitment and loading in hydropower systems. Journal of Water Resources Planning and Management 129 (5):388–98. doi:10.1061/(ASCE)0733-9496(2003)129:5(388).
- Yoo, J. H. 2009. Maximization of hydropower generation through the application of a linear programming model. Journal of Hydrology 376 (1):182–87. doi:10.1016/j.jhydrol.2009.07.026.
- Young, G. 1967. Finding reservoir operating rules. ASCE-Journal of Hydraulics Division 93 (6):297–321.