References
- Carpio, L. G. T., and Margueron, M. V. 2010. Quantification of the competitiveness in the commercialization of electricity in Brazil. Energ. Source. Part B, 5:93–105.
- Carpio, L. G. T., and Pereira, Jr., A. 2006. Independent operation by subsystems: Strategic behavior for the Brazilian electricity sector. Energ. Policy 34:2964–2976.
- Energy Research Company (EPE). 2010. Ten-Year Energy Expansion Plan 2010–2019. Brasilia. Avalilable at:http://www.epe.gov.br/PDEE/Forms/EPEEstudo.aspx.
- Fernandes, E., de Oliveira, J. C. S., de Oliveira, P. R., and Alonso, P. S. R. 2008. Natural- gas-powered thermoelectricity as a reliability factor in the Brazilian electric sector. Energ. Policy 36:999–1018.
- Maceira, M. E. P., Mercio, C. B., Gorenstin, B. G., Cunha, S. H. F., Suanno, C., Sacramento, M. C., and Kligerman A. 1998. Application of the NEWAVE model in the energy evaluation of the Brazilian North/Northeast and South/Southeast interconnected systems. Annals of VI Symposium of Specialists in Electric Operational and Expansion Planning, Salvador, Brazil, May 24–29.
- Oren, S. 2001. Market based risk mitigation: Risk management vs. risk avoidance. White House OSTP/NSF Workshop on Critical Infrastructure Interdependencies, Washington, DC, June 14–15.
- Pereira, M. V. F. 1989. Optimal stochastic operations of large hydroelectric systems. Electrical Power & Energy Systems 11:161–169.
- Ramos, D. S., Fadigas, E. A., Reis, L. B., and Lima, W. L. 2003. Important issues influencing thermal plant attractiveness in a large hydroelectric generation system. Int. J. Elec. Power 25:797–807.
- Silva, E. 2001. Price Formation in Electricity Markets. Porto Alegre, RS, Brazil: Editora Sagra Luzzatto.