References
- Atanassov, K. T. 1986. Intuitionistic fuzzy sets. Fuzzy Sets and Systems 20 (1):87–96.
- Balin, A., and H. Baraçli. 2015. A fuzzy multi-criteria decision making methodology based upon the interval Type-2 fuzzy sets for evaluating renewable energy alternatives in Turkey. Technological and Economic Development of Economy 23 (5):742–63.
- Büyüközkan, G., and S. Güleryüz. 2016. An integrated DEMATEL-ANP approach for renewable energy resources selection in Turkey. International Journal of Production Economics 182:435–48.
- Cayir Ervural, B., S. Zaim, O. F. Demirel, Z. Aydin, and D. Delen. 2018. An ANP and fuzzy TOPSIS-based SWOT analysis for Turkey’s energy planning. Renewable and Sustainable Energy Reviews 82 (2):1538–50.
- Çolak, M., and İ. Kaya. 2017. Prioritization of renewable energy alternatives by using an integrated fuzzy MCDM model: A real case application for Turkey. Renewable and Sustainable Energy Reviews 80:840–53.
- Erdogan, M., and İ. Kaya. 2015. An integrated multi-criteria decision-making methodology based on type-2 fuzzy sets for selection among energy alternatives in Turkey. Iranian Journal of Fuzzy Systems 12 (1):1–25.
- Ertay, T., C. Kahraman, and İ. Kaya. 2013. Evaluation of renewable energy alternatives using MACBETH and fuzzy AHP multicriteria methods: the case of Turkey. Technological and Economic Development of Economy 19 (1):38–62.
- Intarapaiboon, P. 2016. A hierarchy-based similarity measure for intuitionistic fuzzy sets. Soft Computing 20 (5):1909–19.
- Kahraman, C., and İ. Kaya. 2010. A fuzzy multicriteria methodology for selection among energy alternatives. Expert Systems with Applications 37 (9):6270–81.
- Kaya, T., and C. Kahraman. 2010. Multicriteria renewable energy planning using an integrated fuzzy VIKOR & AHP methodology: the case of Istanbul. Energy 35 (6):2517–27.
- Pak, B., Y. E. Albayrak, and Y. C. Erensal. 2015. Renewable energy perspective for Turkey using sustainability indicators. International Journal of Computational Intelligence Systems 8 (1):187–97.
- Opricovic, S. 1998. Visekriterijumska Optimizacija Sistema U Gradevinarstvu. Belgrade: Faculty of Civil Engineering.
- Opricovic, S., and G.-H. Tzeng. 2004. Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS. European Journal of Operational Research 156 (2):445–55.
- Opricovic, S., and G.-H. Tzeng. 2007. Extended VIKOR method in comparison with outranking methods. European Journal of Operational Research 178 (2):514–29.
- Ozgur, M. A. 2008. Review of Turkey’s renewable energy potential. Renewable Energy 33 (11):2345–56.
- Özkale, C., C. Celik, A. C. Turkmen, and E. S. Cakmaz. 2017. Decision analysis application intended for selection of a power plant running on renewable energy sources. Renewable and Sustainable Energy Reviews 70:1011–21.
- Park, J. H., H. J. Cho, J. S. Hwang, and Y. C. Kwun 2010. Extension of the VIKOR method to dynamic intuitionistic fuzzy multiple attribute decision making. Paper read at 3rd International Workshop on Advanced Computational Intelligence, IWACI 2010.
- Saaty, T. L. 1980. The Analytic Hierarchy Process, NY. McGraw-Hill, USA. Cook WD and Seiford LM. (1978). Priority Ranking and Consensus Formation, Management Science 24:1721–32.
- Şengül, Ü., M. Eren, S. Eslamian Shiraz, V. Gezder, and A. B. Şengül. 2015. Fuzzy TOPSIS method for ranking renewable energy supply systems in Turkey. Renewable Energy 75:617–25.
- Shu, M. H., C. H. Cheng, and J. R. Chang. 2006. Using intuitionistic fuzzy sets for fault-tree analysis on printed circuit board assembly. Microelectronics Reliability 46 (12):2139–48.
- Zadeh, L. A. 1965. Fuzzy sets. Information and Control 8 (3):338–53.