References
- AGC (2009). Qualifications based selection of contractors [WWW document] http://www.aiacc.org/wp-content/uploads/2016/03/AGC-QBS-of-Contractors-Study-2009.pdf
- AGC & NASFA (2008). Best practices for use of best value selections [WWW document]. https://www.agc.org/sites/default/files/Project%20Delivery%20-%20Best%20Value%20Selection.pdf
- Akintoye, A., Hardcastle, C., Beck, M., Chinyio, E., & Asenova, D. (2003). Achieving best value in private finance initiative project procurement. Construction Management and Economics, 21(5), 461–470. https://doi.org/https://doi.org/10.1080/0144619032000087285
- Awwad, R., & Ammoury, M. (2019). Owner’s perspective on evolution of bid prices under various price-driven bid selection methods. Journal of Computing in Civil Engineering, 33(2), 1–12. https://doi.org/https://doi.org/10.1061/(ASCE)CP.1943-5487.0000803
- Chan, A. P. C., Scott, D., & Chan, A. P. L. (2004). Factors affecting the success of a construction project. Journal of Construction Engineering and Management, 130(1), 153–155. https://doi.org/https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(153)
- DBIA (2012). DBIA position statement - qualification based selection [WWW document]. https://dbia.org/wp-content/uploads/2018/05/DBIA-PositionStatement-LPTA.pdf
- DBIA (2013). Building America: Challenges for small construction contractors [WWW document] https://dbia.org/dbia-tells-congress-design-build-is-good-for-small-businesses/
- Falagario, M., Sciancalepore, F., Costantino, N., & Pietroforte, R. (2012). Using a DEA-cross efficiency approach in public procurement tenders. European Journal of Operational Research, 218(2), 523–529. https://doi.org/https://doi.org/10.1016/j.ejor.2011.10.031
- Gransberg, D. (2020). Does low bid award facilitate wrongdoing? US implications of Quebec’s charbonneau commission report. Journal of Legal Affairs and Dispute Resolution in Engineering and Construction, 12(1), 03719004. https://doi.org/https://doi.org/10.1061/(ASCE)LA.1943-4170.0000357
- Gransberg, D. D., & Ellicot, M. A. (1997). Best-value contracting criteria. Cost Engineering, 39(6), 31–34. https://www.researchgate.net/publication/290097777_Best-value_contracting_criteria
- Gransberg, D. D., & Senadheera, S. P. (1999). Design-build contract award methods for transportation projects. Journal of Transportation Engineering, 125(6), 565–567. https://doi.org/https://doi.org/10.1061/(ASCE)0733-947X(1999)125:6(565)
- Gunhan, S., Arditi, D., & Doyle, J. (2007). Avoiding change orders in public school construction. Journal of Professional Issues in Engineering Education and Practice, 133(1), 67–73. https://doi.org/https://doi.org/10.1061/(ASCE)1052-3928(2007)133:1(67)
- Hatush, Z., & Skitmore, M. (1997). Criteria for contractor selection. Construction Management and Economics, 15(1), 19–38. https://doi.org/https://doi.org/10.1080/014461997373088
- Illia, T. (2001). Late, overbudget state job sparks contracting changes. Engineering News Record, 247(1), 17. https://www.elibrary.ru/item.asp?id=6020243
- Kashiwagi, D., & Byfield, R. E. (2002). Selecting the best contractor to get performance: On time, on budget, meeting quality expectations. Journal of Facilities Management, 1(2), 103–116. https://doi.org/https://doi.org/10.1108/14725960310807872
- Kashiwagi, D., Child, G. S., Child, G. S., & Sullivan, K. (2014). Price based environment of design and engineering services. Journal for the Advancement of Performance Information and Value, 6(1), 1. https://doi.org/https://doi.org/10.37265/japiv.v6i1.70
- Kashiwagi, D., Kashiwagi, J., Kashiwagi, A., & Sullivan, K. (2012). Best value solution designed in a developing country. Journal for the Advancement of Performance Information and Value, 4(2), 223–239. https://www.researchgate.net/publication/280924120_Best_Value_Solution_Designed_in_a_Developing_Country_Best_Value_Solution_Designed_in_a_Developing_Country
- Kashiwagi, D., & Savicky, J. (2002). Analysis of best-value pricing. AACE International Transactions, 181–185. https://asu.pure.elsevier.com/en/publications/analysis-of-best-value-pricing
- Kashiwagi, D., & Savicky, J. (2003). The cost of ‘best value’ construction. Journal of Facilities Management, 2(3), 285–295. https://doi.org/https://doi.org/10.1108/14725960410808267
- Kashiwagi, J., Sullivan, K., & Kashiwagi, D. (2010). New contract model for project management. Proceedings of the fifth scientific conference on project management, 228–235. Heraklion, Crete, Greece.
- Korman, R. (2016). Disputed design-build study raises questions about costs [WWW document]. https://www.enr.com/articles/38694-disputed-design-build-study-raises-questions-about-costs?v=preview
- Luu, D. T., Ng, S. T., & Chen, S. E. (2005). Formulating procurement selection criteria through case-based reasoning approach. Journal of Computing in Civil Engineering, 19(3), 269–276. https://doi.org/https://doi.org/10.1061/(ASCE)0887-3801(2005)19:3(269)
- Markus, E. (1997). Low bid alternatives earning respect. American City and County, 112(9), 22. https://www.americancityandcounty.com/1997/08/01/low-bid-alternatives/
- McCormick, M. (2012). General contractor selection guide [WWW document] http://www.mccormickpcs.com/images/GC_Selection_Guide.pdf
- McKeon, J. (2016). Construction management: Evolution of a profession [WWW document] https://www.cmaanet.org/sites/default/files/2018-04/evolutionofcmprofession.pdf
- McKim, R., Hegazy, T., & Attalla, M. (2000). Project performance control in reconstruction projects. Journal of Construction Engineering and Management, 126(2), 137–141. https://doi.org/https://doi.org/10.1061/(ASCE)0733-9364(2000)126:2(137)
- Minchin, R. E., & Chini, A. P. (2016). Alternative contracting research. (Rep. No. BDV31-977-40). Florida DOT.
- MnDOT. (2012). Best-value procurement manual [WWW document] http://www.dot.state.mn.us/const/tools/docs/BestValueGuide-FinalMarch2013.pdf
- Molenaar, K., Harper, C., & Yugar-Arias, I. (2014). Guidebook for selecting alternative contracting methods for roadway projects: Project delivery methods, procurement procedures, and payment provisions. (Rep. No. TPF-5(260)). University of Colorado.
- NSPE (2015). Qualifications-based selection of engineering services: state list [WWW document]. https://www.nspe.org/resources/issues-and-advocacy/action-issues/qualifications-based-selection-engineering-services/state-list
- O’Meara, S., & Azman, M. (2008) School construction and the new best value contracting law [WWW document]. https://www.olwklaw.com/documents/Best_Value_Contracting.pdf
- Perrenoud, A., Lines, B., Savicky, J., & Sullivan, K. (2017). Using best-value procurement to measure the impact of initial risk management capability on qualitative construction performance. Journal of Management in Engineering, 33(5), 1–8. https://doi.org/https://doi.org/10.1061/(ASCE)ME.1943-5479.0000535
- Rankin, J. H., Champion, S. L., & Waugh, L. M. (1996). Contractor selection: Qualification and bid evaluation. Canadian Journal of Civil Engineering, 23(1), 117–123. https://doi.org/https://doi.org/10.1139/l96-012
- Sandquist, R. (2007). Qualifications-based vs. low-bid contractor selection. [WWW document]. URL https://www.wyattmgmt.com/wp-content/uploads/2015/02/AIA.pdf
- Schottle, A., & Arroyo, P. (2017). Comparison of weighting-rating-calculating, best value, and choosing by advantages for bidder selection. Journal of Construction Engineering and Management, 143(8), 1–12. https://doi.org/https://doi.org/10.1061/(ASCE)CO.1943-7862.0001342
- Scott, S., Molenaar, K. R., Gransberg, D. D., & Smith, N. C. (2006). Best value procurement methods for highway construction projects (Rep. No. 561 NCHRP). Transportation Research Board of the National Academics.
- Singh, Y., Abdelhamid, T., Mrozowski, T., & El-Gafy, M. A. (2014). Investigation of contemporary performance measurement systems for production management of renovation projects. Journal of Construction Engineering, 2014, 1–9. https://doi.org/https://doi.org/10.1155/2014/417853
- Slowey, K. (2016). UPDATE: DBIA disputes study claiming design-build projects often delivered on time, over budget [WWW document]. https://www.constructiondive.com/news/update-dbia-disputes-study-claiming-design-build-projects-often-delivered/412806/
- Sullivan, K. T., & Guo, Y. (2009). Contractor cash flow and profitability analysis between best value and low bid. Cost Engineering, 51(9), 16–20. http://connection.ebscohost.com/c/articles/44451703/contractor-cash-flow-profitability-analysis-between-best-value-low-bid
- Taiwan Ministry of Justice. (2009). Analysis of BV application in the county government procurement projects [WWW document]. http://www.moj.gov.tw/public/Data/6616141146181.doc
- Wong, C. H., Holt, G. D., & Cooper, P. A. (2010). Lowest price or value? Investigation of UK construction clients’ tender selection process. Construction Management and Economics, 18(7), 767–774. https://doi.org/https://doi.org/10.1080/014461900433050
- Wong, C. H., Holt, G. D., & Harris, P. (2001). Multi-criteria selection or lowest price? Investigation of UK construction clients’ tender evaluation preferences. Engineering. Construction and Architectural Management, 8(4), 257–271. https://www.emerald.com/insight/content/doi/10.1108/eb021187/full/html
- Yasamis, F., Arditi, D., & Mohammadi, J. (2002). Assessing contractor quality performance. Construction Management and Economics, 20(3), 211–223. https://doi.org/https://doi.org/10.1080/01446190110113693
- Yu, W., & Wang, K. (2012). Best value or lowest bid? A quantitative perspective. Journal of Construction Engineering and Management, 38(1), 128–134. https://doi.org/https://doi.org/10.1061/(ASCE)CO.1943-7862.0000414