References
- Adamtey, S. (2019). A case study performance analysis of design-build and integrated project delivery methods. International Journal of Construction Education and Research, 1-17. https://doi.org/https://doi.org/10.1080/15578771.2019.1696903
- Adamtey, S., & Onsarigo, L. (2019). Effective tools for projects delivered by progressive design-build method. CSCE annual conference (pp. 1–10). Laval, Canada: Canadian Society for Civil Engineering.
- Alleman, D., Antoine, A., Gransberg, D., & Molenaar, K. (2017). Comparison of qualifications-based selection and best-value procurement for construction manager–general contractor highway construction. Transportation Research Record: Journal of the Transportation Research Board, 2630(1), 59–67. https://doi.org/https://doi.org/10.3141/2630-08
- American Society of Civil Engineers. (2012). Quality in the constructed project: a guide for owners, designers, and constructors.
- Beard, J., Loukakis, M., & Wundram, E. (2001). Design-Build: Planning Through Development. McGraw-Hill.
- Bilbo, D., Bigelow, B., Escamilla, E., & Lockwood, C. (2015). Comparison of construction manager at risk and integrated project delivery performance on healthcare projects: A comparative case study. International Journal of Construction Education and Research, 11(1), 40–53. https://doi.org/https://doi.org/10.1080/15578771.2013.872734
- Carr, L. (1994). The strengths and weaknesses of quantitative and qualitative research: what method for nursing? Journal of Advanced Nursing, 20(4), 716–721. https://doi.org/https://doi.org/10.1046/j.1365-2648.1994.20040716.x
- Chen, Q., Jin, Z., Xia, B., Wu, P., & Skitmore, M. (2015). Time and cost performance of design–build projects. Journal of Construction Engineering and Management, 142(2), 1–6. https://doi.org/https://doi.org/10.1061/(ASCE)CO.1943-7862.0001056
- Chen, Q., Xia, B., Jin, Z., Wu, P., & Hu, Y. (2016). Choosing appropriate contract methods for design-build projects. Journal of Management in Engineering, 32(1), 1–7. https://doi.org/https://doi.org/10.1061/(ASCE)ME.1943-5479.0000393
- DBIA. (2010). DBIA position statement: Use of stipends. Design-Build Institute of America. Retrieved February 24, 2020, from https://dbia.org/wp-content/uploads/2018/05/DBIA-Position-Statement-Stipends.pdf
- DBIA. (2012). DBIA position statement: qualification based selection. Design-Build Institute of America. Retrieved February 22, 2020, from https://dbia.org/wp-content/uploads/2018/05/DBIA-Position-Statement-Qualification-Based.pdf
- El Wardani, M. (2004). Comparing Procurement methods for design-build projects. Computer Integrated Construction Research Program, The Pennsylvania State University. Retrieved February 10, 2020, from http://www.aiacc.org/wp-content/uploads/2016/03/U-of-Penn-DB-study-in-2004.pdf
- El Wardani, M., Messner, J., & Horman, M. (2006). Comparing procurement methods for design-build projects. Journal of Construction Engineering and Management, 132(3), 230–238. https://doi.org/https://doi.org/10.1061/(ASCE)0733-9364(2006)132:3(230)
- Evbuomwan, N., & Anumba, C. (2010). Concurrent engineering in design-build projects. Construction Management and Economics, 15(3), 271–281. https://doi.org/https://doi.org/10.1080/014461997373006
- Gehrig, D. (2015). A step forward for public works contracting: Design-build in the public sector after the adoption of SB 785. League of California cities 2015 spring conference (pp. 1–14). Monterey: League of California Cities. Retrieved from https://www.cacities.org/Resources-Documents/Member-Engagement/Professional-Departments/City-Attorneys/Library/2015/2015-Spring-Conference/5-2015-Spring-David-Gehrig-Design-Build-For-Public.aspx
- Gransberg, D., & Molenaar, K. (2019). Critical comparison of progressive design-build and construction manager/general contractor project delivery methods. Transportation Research Record: Journal of the Transportation Research Board, 2673(1), 261–268. https://doi.org/https://doi.org/10.1177/0361198118822315
- Gransberg, D., & Senadheera, S. (1999). Design-build contract award methods for transportation projects. Journal of Transportation Engineering, 125(6), 565–567. https://doi.org/https://doi.org/10.1061/(ASCE)0733-947X(1999)125:6(565)
- Haskell. (2018). Selection of design-builder: Best value vs. qualification-based. Retrieved February 26, 2020, from https://www.haskell.com/media/10652/selection-of-design-builder-bv-vs-qbs.pdf
- Ioannou, P., & Leu, -S.-S. (1993). Average-bid method – Competitive bidding strategy. Journal of Construction Engineering and Management, 119(1), 50–63. https://doi.org/https://doi.org/10.1061/(ASCE)0733-9364(1993)119:1(131)
- Larsen, J., Shen, G., Lindhard, S., & Brunoe, T. (2016). Factors affecting schedule delay, cost overrun, and quality level in public construction projects. Journal of Management in Engineering, 32(1), 115–123. https://doi.org/https://doi.org/10.1061/(ASCE)ME.1943-5479.0000391
- Leedy, P., & Ormrod, J. (2010). Practical research: Planning and design (9th ed.). Pearson Education, Inc.
- McDonald, J. (2009). Handbook of biological statistics (2nd ed.). Sparky House Publishing.
- Molenaar, K., & Gransberg, D. (2001). Design-builder selection for small highway projects. Journal of Management and Engineering, 17(4), 214–223. https://doi.org/https://doi.org/10.1061/(ASCE)0742-597X(2001)17:4(214)
- Molenaar, K., Sobin, N., & Antillon, E. (2010). A synthesis of best-value procurement practices for sustainable design-build projects in the public sector. Journal of Green Building, 5(4), 148–157. https://doi.org/https://doi.org/10.3992/jgb.5.4.148
- Molenaar, K., Sobin, N., Gransberg, D., McCuen, T., Korkmaz, S., & Horman, M. (2009). Sustainable, high performance projects and project delivery methods: A state-of-practice report. White Paper for the Design-Build Institute of America and the Charles Pankow Foundation. Design-Build Institute of America. Retrieved February 11, 2020, from http://citeseerx.ist.psu.edu/viewdoc/download?doi=10.1.1.537.8794&rep=rep1&type=pdf
- Molenaar, K., Songer, A., & Barash, M. (1999). Public-sector design/build evolution and performance. Journal of Management in Engineering, 15(2), 54–62. https://doi.org/https://doi.org/10.1061/(ASCE)0742-597X(1999)15:2(54)
- Nguyen, P., Lines, B., & Tran, D. (2018). Best-value procurement in design-bid-build construction projects: Empirical analysis of selection outcomes. Journal of Construction Engineering and Management, 144(10), 1–10. https://doi.org/https://doi.org/10.1061/(ASCE)CO.1943-7862.0001550
- Onsarigo, L., & Adamtey, S. (2020). Feasibility of state transportation agencies acquiring trenchless technologies: A comparison of open cut and horizontal auger boring. Tunnelling and Underground Space Technology, 95(1), 1–8. https://doi.org/https://doi.org/10.1016/j.tust.2019.103162
- Palaneeswaran, E., & Kumaraswamy, M. (2000). Benchmarking contractor selection practices in public-sector construction - A proposed model. Engineering, Construction and Architectural Management, 7(3), 285–299. https://doi.org/https://doi.org/10.1108/eb021153
- Runyon, R., Coleman, K., & Pittenger, D. (2002). Fundamentals of behavioural statistics (9th ed.). McGraw-Hill.
- Rutherford, A. (2011). ANOVA and ANCOVA: A GLM approach. Wiley & Sons, Inc.
- Sanvido, V., Grobler, F., Parfitt, K., Guvenis, M., & Coyle, M. (1992). Critical success factors for construction projects. Journal of Construction Engineering and Management, 118(1), 94–111. https://doi.org/https://doi.org/10.1061/(ASCE)0733-9364(1992)118:1(94)
- Sawyer, J., Lines, B., Perrenoud, A., Smithwick, J., & Sullivan, K. (2015). Qualifications-based selection of construction services: evaluation criteria that best differentiate contractor qualifications. 51st ASC annual international conference proceedings. College Station, TX: Associated Schools of Construction.
- Scott, S., Molenaar, K., Gransberg, D., & Smith, N. (2006). Best-value procurement methods for highway construction projects. Transportation Research Board of the National Academies. Retrieved February 10, 2020, from https://pdfs.semanticscholar.org/cdfb/8ab578095dc6460f94b7743ac97c21ecf53f.pdf
- Semple, C., Hartman, F., & Jergeas, G. (1994). Construction claims and disputes: Causes and cost/time overruns. Journal of Construction Engineering and Management, 120(4), 72–83. https://doi.org/https://doi.org/10.1061/(ASCE)0733-9364(1994)120:4(785)
- Shalwani, A., Lines, B., & Smithwick, J. (2019). Differentiation of evaluation criteria in design-build and construction manager at risk procurements. Journal of Management in Engineering, 35(5), 50–63. https://doi.org/https://doi.org/10.1061/(ASCE)ME.1943-5479.0000707
- Xia, B., Chan, A., Zuo, J., & Molenaar, K. (2013). Analysis of selection criteria for design-builders through the analysis of request for proposals. Journal of Management in Engineering, 29(1), 19–24. https://doi.org/https://doi.org/10.1061/(ASCE)ME.1943-5479.0000119