91
Views
10
CrossRef citations to date
0
Altmetric
Original Articles

A Benchmark Model for Construction Duration in Public Housing Developments

&
Pages 1-14 | Published online: 10 Feb 2014

References

  • Belsley, D. A., Kuh, E. & Welsch, R. E. (1980). Regression diagnostics: identifying influential data and sources of collinearity, John Wiley & Sons, New York, USA.
  • Blyth, S. M. (1995). An investigation into the development of a benchmark for UK construction time performance, MSc thesis, University of Glamorgan, UK.
  • Camp, R. C. (1989). Benchmarking: the search for the industry best practice that lead to superior performance, American Society for Quality Control Press, New York, USA.
  • Chan, A. P. C. (1996). Determinants of project success in the construction industry of Hong Kong, PhD thesis, University of South Australia, Australia.
  • Chan, A. P. C., Chan, D. W. M. & Ho, K. S. K. (2002). Critical success factors for partnering projects: a Hong Kong perspective’, Award winning paper for the CIOB(UK) Research Papers Competition 2001.
  • Chan, D. W. M. (1998). Modelling construction durations for public housing projects in Hong Kong, PhD thesis, The University of Hong Kong, Hong Kong.
  • Chan, D. W. M. & Kumaraswamy, M. M. (1996a). ‘Reasons for delay in civil engineering projects – the case of Hong Kong’, The Hong Kong Institution of Engineers Transactions, vol. 2, no. 3, pp. 1–8.
  • Chan, D. W. M. & Kumaraswamy, M. M. (1996b). ‘An evaluation of construction time performance in the building industry’, Building and Environment, vol. 31, no. 6, pp. 569–578.
  • Chan, D. W. M. & Kumaraswamy, M. M. (1997). ‘A comparative study of causes of time overruns in Hong Kong construction projects’, International Journal of Project Management, vol. 15, no. 1, pp. 55- 3.
  • Chan, D. W. M. & Kumaraswamy, M. M. (1999a). ‘Modelling and predicting construction durations in Hong Kong public housing’, Construction Management and Economics, vol. 17, no. 3, pp. 351–362.
  • Chan, D. W. M. & Kumaraswamy, M. M. (1999b). ‘Forecasting construction durations for public housing projects: a Hong Kong perspective’, Building and Environment, vol. 34, no. 5, pp. 633–646.
  • Chan, D. W. M. & Kumaraswamy, M. M. (2002). ‘Compressing construction durations: lessons learned from Hong Kong building projects’, International Journal of Project Management, vol. 20, no. 1, pp. 23–35.
  • CIRC (2001). Construct for excellence : report by the Construction Industry Review Committee (CIRC), Hong Kong SAR Government, Hong Kong.
  • Construction and Contract News (2001). Construct for excellence : report of the Construction Industry Review Committee, Hong Kong, no. 2, pp. 68–73.
  • Fellows, R. & Liu, A. (1997). Research methods for construction, Blackwell Science Ltd., Oxford, UK.
  • Goh, B. H. (2000). ‘Evaluating the performance of combining neural networks and genetic algorithms to forecast construction demand: the case of the Singapore residential sector’, Construction Management and Economics, vol. 18, no. 2, pp. 209–217.
  • Gray, C. & Little, J. (1985). ‘The classification of work packages to determine the relationship between design and construction’, Occasional Paper no. 18, Department of Construction Management, University of Reading, UK.
  • Griffith, A., Stephenson, P. & Watson, P. (2000). Management systems for construction, Pearson Education Inc., New York, USA.
  • Khosrowshahi, F. & Kaka, A. P. (1996). ‘Estimation of project total cost and duration for housing projects in the UK’, Building and Environment, vol. 31, no. 4, pp. 373–383.
  • Kumaraswamy, M. M. & Chan, D. W. M. (1995). ‘Determinants of construction duration’, Construction Management and Economics, vol. 13, no. 3, pp. 209–217.
  • Leedy, P. D. (1997). Practical research: planning and design, 6th edn, Merrill, New Jersey, USA.
  • MacKenzie, J. (1996). The influence of a benchmarking system for construction time performance of contracts in South Wales, MSc thesis, University of Glamorgan, UK.
  • Mendenhall, W., Reinmuth, J. E. & Beaver, R. (1993). Statistics for management and economics, 7th edn, Duxbury Press, Belmont, California, USA.
  • Ng, S. T., Mak, M. M. Y., Skitmore, R. M., Lam, K. C. & Varnam, M. (2001). ‘The predictive ability of Bromilow’s time-cost model’, Construction Management and Economics, vol. 19, no. 2, pp. 165–173.
  • Nkado, R. N. (1991). A construction time information system for the building industry, PhD thesis, University of Reading, UK.
  • SAS Institute Inc. (1993). SAS/INSIGHT User’s guide version 6, 2nd edn, Cary, North Carolina, USA.
  • Sekaran, U. (1992). Research methods for business - a skill building approach, 2nd edn, Wiley, New York, USA.
  • Walker, D. H. T. (1994). An investigation into factors that determine building construction time performance, PhD thesis, Royal Melbourne Institute of Technology, Australia.
  • Walker, D. H. T. & Vines, M. W. (2000). ‘Australian multi-unit residential project construction time performance factors’, Engineering, Construction and Architectural Management, vol. 7, no. 3, pp. 278–284.
  • Wittink, D. R. (1988). The application of regression analysis, Allyn and Bacon Inc., Boston, Massachusetts, USA.
  • Zikmund, W. G. (2000). Business research methods, 6th edn, Dryden Press, Texas, USA.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.