64
Views
2
CrossRef citations to date
0
Altmetric
Original Articles

An Analysis of the Distribution of Time Variance for Building Projects

, , &
Pages 73-82 | Published online: 10 Feb 2014

References

  • Akinsola, A. O., Potts, K. F., Ndekugri, I. & Harris, F. C. (1997). ‘Identification and evaluation of factors influencing variations on building projects’, International Journal of Project Management, vol. 15, pp. 263–267.
  • Akintoye, A. S. & MacLeod, M. J. (1997). ‘Risk analysis and management in construction’, International Journal of Project Management, vol. 15, pp. 31–38.
  • Chan, W. M. & Kumaraswamy, M. M. (1997). ‘A comparative study of causes of time overruns in Hong Kong Construction projects’, International Journal of Project Management, vol. 15, pp. 55–63.
  • Chhikara, R. S. & Folks, J. L. (1977). ‘The inverse Gaussian distribution as a lifetime model’, Technometrics vol. 19, pp. 461–468.
  • Conlin, J. & Retik, A. (1997). ‘The applicability of project management software and advanced IT techniques in construction delays mitigation’, International Journal of Project Management, vol. 15, pp. 107–119.
  • Dean, E. B., Wood, D. A., Moore, A. A. & Bogart, E. H. (1997). ‘Cost risk analysis based on perception of the engineering process’, The Building Economist, September.
  • Hai, S., Shen, L. Y., & Ren, H. (1999). ‘Fuzzy analysis for evaluating the quality of general project manager’, Journal of Chongqing Jianzhu University, vol. 21, no. 3, pp. 100–106.
  • Hawkins, D. M. & Olwell, D. H. (1997). ‘Inverse Gaussian cumulative sum control charts for location and shape’, The Statistician, vol. 46, pp. 323–335.
  • Kaming, P. F., Olomolaiye, P. O., Holt, G. D. & Harris, F. C. (1997). ‘Factors influencing construction time and cost overruns on high-rise projects in Indonesia’, Construction Management and Economics, vol. 15, pp. 83–94.
  • Kangari, R. (1995). ‘Risk management perceptions and trends of U.S. construction’, Journal of Construction Engineering and Management, pp. 422–429.
  • MOC 1996, Regulation on project supervision, effective from 1 January 1996, Ministry of Construction, China.
  • NPC (1998). Construction Law, effective from 1 March 1998, National People’s Congress.
  • Shaked, O. & Warszawski, A. (1995). ‘Knowledge-based system for construction planning of high-rise buildings’, Journal of Construction Engineering and Management, June, pp. 172–182.
  • Shen, L. Y. (1997). ‘Project risk management in Hong Kong’, International Journal of Project Management, vol. 15, pp. 101–105.
  • Shen, L. Y., Drew, D. & Zhang, Z. H. (1999). ‘An optimal bidding model for price-time bi-parameter construction contracts’, Journal of Construction Engineering & Management, ASCE, vol. 125, no.3, pp. 204–209.
  • Shen, L. Y., Fisher, N. & Sun, C. S. (2001). ‘An analysis of the distribution of cost variance for building projects’, Journal of Construction Research, vol. 2, pp. 35–40.
  • Sneden, J. A. (1987). ‘Late completion: time as money’, Chartered Quantity Surveyor, vol. 11, pp. 33–34

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.