583
Views
35
CrossRef citations to date
0
Altmetric
Original Articles

Cost Escalation, Schedule Overruns and Quality Shortfalls on Construction Projects: The Case of Zambia

, , &
Pages 53-68 | Published online: 10 Feb 2014

References

  • ACEZ (2012) http://www.acez.co.zm [Accessed 07/10/2012]
  • Ahmed S., Azher S., Castillo M. and Kappagantula P. (2002) Construction delays in Florida; an empirical study, Florida, available online: http://www.cm.fiu.edu/publication/Delays%20project.pdf [Accessed 20/3/2008]
  • Al-Moumani H. A. (2000), Construction Delay: A Quantitative Analysis, International Journal of Project Management, Elsevier, 18(1), pp. 51–9
  • Apolot R., Alinaitwe H., and Tindiwensi D. (2012), An Investigation into the Causes of Delay and Cost Overrun in Uganda’s Public Sector Construction Projects, Proceedings of the Second International Conference on Advances in Engineering and Technology, India.
  • Assaf, S, AL-Khalil M. and Al Hazmi M., (1995), Causes of delay in large building construction projects, Journal of Management in Engineering, 11(2), pp. 45–50.
  • Azhar, N. and Farouqi, R. U. (2008), Cost Overrun Factors in the Construction Industry of Pakistan, In the 1st International Conference on Construction in Developing Countries: Advancing & Integrating Construction Education, Research and Practice, Karachi, Pakistan.
  • Bank of Zambia (2011), Annual Report, Bank of Zambia.
  • Chan D. W.M and Kumaraswamy M. M. (1997), A comparative study of causes of time overruns in Hong Kong construction projects. International Journal of Project Management, Elsevier 15(1), pp 55–63.
  • Datta B. (2002) Management of Infrastructure Projects in Urban Local Bodies: Case Study of Kanpur Development Authority, India Infrastructure Report, pp. 207 – 211.
  • Dlakwa, M.M. and Culpin, M.F. (1990). Reasons for overrun in public sector projects in Nigeria. International Journal of Project Management. 8(4), pp 237–241.
  • Elinwa A. U., and Buba S., A., (1993), Construction cost factors in Nigeria, Journal of Construction, Engineering and Management, ASCE, 119(4) pp 419 – 425.
  • Elinwa A. U., and Joshua M., (2001), Schedule overrun factors in Nigerian Construction Industry, Journal of Construction, Engineering and Management, ASCE, 127(5) pp 698–713
  • Falqi I. I. (2004) Delays in Project Completion: A comparative study of construction delay factors in. Saudi Arabia and the United Kingdom, available online: http://www.saedin.com/index.php?option=com_docman&task=doc_download&gid=48&Itemid=57 [Accessed 5/6/2008]
  • Frimpong Y., Oluwoye J., and Crawford L., (2003), Causes of delays and cost overruns in construction of groundwater projects in a developing country; Ghana as a case study, International Journal of Project Management, Elsevier, 21, pp 321–326
  • Hendrickson C., Au T., (2003), Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects and Builders, Version 2.1, Pittsburgh available online: http://www.ce.cmu.edu/pmbook [Accessed 21/2/2006]
  • Kaliba C., Muya M., and Mumba K., (2009), Cost escalation and schedule delays in road construction projects in Zambia, International Journal of Project Management, Elsevier, 27(5), pp 522–531
  • Kasimu M. A. (2012), Significant factors that causes cost overruns in building construction project in Nigeria. Interdisciplinary Journal of Contemporary Research in Business, 3(11), pp 775–780.
  • Mansfield N. R., Ugwu O. O. and Doran T. (1994), Causes of delay and cost overruns in Nigerian construction projects. International Journal of Project Management, Elsevier, 12(4), pp. 254260.
  • Merewitz, L. (1973) “Cost Overruns in Public Works.” Benefit Cost and Policy Analysis Chicago, Aldine, pp. 227–297.
  • NAP (2003) Completing the Big Dig; Managing the Final Stages of Boston’s Central Artery/Tunnel Project, The National Academies Press, Washington, D. C. Available online: http://www.darwin.nap.edu/books/0309088879_ht [Accessed 5/6/2008]
  • NCC (2012) http://www.ncc.org.zm [Accessed 07/10/2012]
  • NCC (2006) Contractor Failure Workshop, Construction News, Volume 7(3), pp 3
  • Nkhata L. (1997), Methodological Options in Policy Relevant Social Research, Study Fund, Lusaka, pp 77–170.
  • Ramanathan C., Nayaranan S., and Arazi I. (2012) Analysis of Time and Cost Overrun in Malaysian Construction, Advanced Materials Research, 452–453, pp 1002–1008.
  • Schexnayder C., Fiori C., and Weber S. (2003) Project Cost Estimating; A Synthesis of Highway Practice, Arizona. Available online: http://www4.trb.org/trb/crp.nsf/All+Projects/NCHRP+20–7 [Accessed 5/6/2006]
  • The Post (2008) “Simbao warns contractors”, January 10, pp 1

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.