References
- Al-Barrak, A. (1993). Causes of contractors’ failures in Saudi Arabia, M.Sc. Thesis, Construction Engineering and Management, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.
- Al-Sobiei, O. S., Arditi, D., and Polat, G. (2005). “Predicting the Risk of Contractor Default in Saudi Arabia Utilizing Artificial Neural Network (ANN) and Generic Algorith (GA) Techniques.” Construction Management and Economics, 23(4), 423–430.
- Aridit, D., Koksal,A. and Kale, S. (2000). “Business Failure in the Construction Industry.” Engineering, Construction and Architectural Management, 7(2), 120–132.
- Assaf, S. and Al-Hejji, S. (2006), “Causes of delay in large construction projects”, International Journal of Project Management, 24(4), 349–357.
- Assaf, S.A., Bubshait, A.A., and Al-Muwasheer, F. (2010), “Factors affecting affordable housing cost in Saudi Arabia”, International Journal of Housing Markets and Analysis, 3(4), 290–307.
- Crutzen, N., and Van Caillie, D. (2007). The Business Failure Process: An Integrative Model of the Literature, Liège University publications, School of Management, No 200710/03.
- Everett, J. and Watson, J. (1998). “Small Business Failure and External Risk Factors.” Small Business Economics, 11(4), 371–390.
- Jannadi, M. O. (1997). “Reasons for Construction Business Failure in Saudi Arabia.” Project Management Journal, 28(2), 32–36.
- Kale, S., and Arditi, D. (1998). “Business Failure: Liabilities of Newness, Adolescence, and Smallness.” Journal of Construction Engineering and Management, ASCE, 124(6), 458–464.
- Kivrak, S., and Arslan, G. (2008). Factors Causing Construction Company Failure, Proceedings of Building Abroad Conference, October 23–25, Montreal, Canada, pp 297–306.
- Koksal, A., and Arditi, D. (2004). “An Input/Output Model for Business Failures in the Construction Industry.” Journal of Construction Research, 5(1), 1–16.
- Mahamid, I. (2011). “Causes of Contractors’ Failure: Contractors’ View.” Proceedings of the 2nd International Conference on Construction and Project Management, Singapore, 5p.
- Ministry of Municipal and Rural Affairs (MOMRA). (2013). Available from: http://www.momra.gov.sa/, Riyadh, Saudi Arabia. [Accessed September 1, 2013]
- Russell, J. S., and Jaselskis, E. J. (1992). “Predicting Construction Contractor Failure Prior to Contract Award.” Journal of Construction Engineering and Management, ASCE, 118(4), 791–811.
- Schaufelberger, J. (2003). “Causes of Subcontractor Business Failure and Strategies to Prevent Failure.” Proceedings of Construction Research Congress – Wind of Change: Integration and Innovation, March 19–21, Honolulu, Hawaii, USA.
- Thawla, W.D., and Mvubu, M. (2008). “Current Challenges and Problems Facing Small and Medium Size Contractor in Swaziland.” African Journal of Business Management, 2(5), 93–98.