Reference
- Ameyaw, C. (2009). Comparative performance evaluation of the traditional Design-Bid-Build (Dbb) and Design-Build (Db) procurement methods in Ghana. MSc Thesis submitted to Department of Building Technology, Kwame Nkrumah University of Science and Technology.
- Anumba, C. J. and Evbuomwan, N. F. O. (1999). “A taxonomy for communication facets in concurrent life-cycle design and construction.” Computer-Aided Civil and Infrastructure Engineering, 14, 37–44.
- Arditi, D. and Lee, D. E. (2004). “Service quality performance of design/build contractors using quality function deployment.” Construction Management and Economics, 22(1), 123–127.
- Atkinson, A. A., Waterhouse, J. H. and Wells, R. B. (1997). “A stakeholder approach to strategic performance measurement.” Sloan Management Review; Cambridge, 38(3), 25–37.
- Baker, B. N., Murphy, D. C. and Fisher, D. (1983). Factors affecting project success. In: D.I. Cleland, Ed., Project Management handbook. Van Nostrand Reinhold, New York.
- Banerji, K., Gundersen, D. E. and Bahara, R. S. (2005). “Quality management practices in Indian service firms.” Total Quality Management, 16(3), 321–330.
- Beatham, S. (2003). Development of an integrated business improvement system for construction. EngD Thesis submitted to CICE, Loughborough University.
- Bennett, J., Flanagan, R., Lansley, P., Gray, C. and Atkin, B. (1988), Building Britain 2001: Centre for Strategic Studies in Construction. University of Reading.
- Bernard, H. R. (2002). Research Methods in Anthropology: Qualitative and quantitative methods, 3rd Ed., AltaMira Press, Walnut Creek, California.
- Bubshait, A. A. and Almohawis, S. A. (1994). “Evaluating the general conditions of a construction contract.” International Journal of Project Management, 12(3), 133–135.
- Castro, S. and Dawood, N. (2005). RoadSim: A road construction knowledge-based simulation system. Proceedings of the CIB W102 Conference, May 19–25, Lisbon, Portugal.
- Cooke-Davis, T. (2002). “The real success factors on projects.” International Journal of Project Management, 20, 185–190.
- Crown Agents (1998). Value for money audit report for Ghana. The World Bank Procurement Audit in Ghana. Crown Agents for Overseas Governments and Administrations Ltd, UK.
- Danso, B. P. (2007). Project cost overrun in the road construction industry in Ghana. MSc dissertation submitted to the School of Development and Society, Sheffield Hallam University.
- Danso, H. and Antwi, J. K. (2012). “Evaluation of the factors influencing time and cost overruns in telecom tower construction in Ghana.” Civil and Environmental Research, 2(6), 15 – 24
- Economic Construction Institute, ECI. (1994). Total productivity management: guidelines for the construction phase. Productivity Task Force, Economic Construction Institute, Loughborough University.
- Edvarsen, D. F. (2003). “Efficiency of Norwegian Construction Firms.” In Four Essays in the Measurement of Production Efficiency, School of Economics and Commercial Law, Goterborg University.
- Egan, J. (1998). Rethinking construction report of the construction task force on the scope for improving the quality and efficiency of UK construction. Department of the Environment, Transport and the Regions, London.
- Egemen, M. and Mohamed, A. N. (2005). “Different approaches of clients and consultants to contractors’ qualification and selection.” Journal of Civil Engineering and Management, 11(4), 267–276.
- Financial Standard (2004). Construction industry operators call for review of Road Maintenance Act. Financial Standard, December 20, Financial Standard Newspapers, Lagos.
- Griffith, A. and Bhutto, K. (2004). “The integrated management system for project quality, safety and environment: Pilot study research findings of developments in IMS.” International Journal of Construction Management, 4(1), 75–81.
- Hatush, Z. and Skitmore, M. (1997), “Evaluating Contractor prequalification data: Selection criteria and project success factors”, Construction Management and Economics, Vol. 15 No. 2, pp. 129 – 47
- Harris, F. and McCaffer, R. (2002). Modern construction management, 5th Ed, Blackwell Scientific Publishing.
- Haskell P. H. (2004). Construction productivity: its history and future direction. America’s Design-Build Leader White Paper.
- Hong, X. and David, P. (2002). “The performance of contractors in Japan, the UK and the USA: An evaluation of construction quality.” International Journal for Quality and Reliability Management, 19(6), 672–687.
- Idoro, G. I. (2007). A Comparative study of direct labour and design-tender-construct procurement systems in Nigeria. PhD Thesis submitted to Department of Building, University of Lagos, Nigeria.
- Kagioglou, M., Cooper, R. and Aouad, G. (2001). “Performance management in construction: A conceptual framework.” Journal of Construction Management and Economics, 19(1), 85–95.
- Kashiwai, D. T. (2002). The difficulty in implementing performance specifications in construction industry. Paper presented at the International Symposium of the Working Committee, CIB W92 (Procurement Systems).
- Kashiwagi, T. and Parmar, D. (2004). Past performance information in the construction industry. ASC Proceedings of the 40th Annual Conference, Brigham Young University -Provo, Utah April 8–10, 2004.
- Kenny C. (2007). Construction, corruption and developing countries. World Bank Policy Research Working Paper 4271, June 2007.
- Bernstein, H. M. and Lemer, A. C. (1996). “Solving the innovation puzzle - challenges facing the U.S design & construction industry.” American Society of Civil Engineers, 127.
- Laborde, M. and Sanvido, V. (1994). “Introducing new process technologies into construction companies.” Journal of Construction Engineering and Management, 120(3), 488-508.
- Larson, E. (1995). “Project partnering: Results of study of 280 construction projects.” Journal of Management in Engineering, 11(2), 30–35.
- Latham, M. (1994). Constructing the team, Joint Review of Procurement and Contractual Arrangement in the United Kingdom. Design, Drawing and Print Services.
- Lewis, J. L. and Sheppard, S. R. J. (2006). “Culture and communication: can landscape visualization improve forest management consultation with indigenous communities?” Landscape and Urban Planning, 77, 291–313.
- Ling, F. Y. Y., Low, S. P., Wang, S. O. and Lim, H. H. (2009). “Key project management practices affecting Singaporean firms’ project performance in China.” International Journal of Project Management, 27, 59-71.
- Mahadevappa, B. and Kotreshwar, G. (2004). “Quality management practices in India ISO 9000 certified companies.” Total Quality Management, 15(3), 295–305.
- Mohsini, R. A. and Davidson, C. H. (1992). “Determinants of performance in the traditional building process.” Construction Management & Economics, 10(4), 343–59.
- Ntorinkansa, H. (2010). NEWS: Presidential Palace Ghana - “Jubilee House” costs $176 million (US-Dollar). Retrieved from: www.Ghana-Net.com.
- National Steering Committee for Innovation in Construction, NSCIC (2003). The construction industry as a place to invest. Presentation from the NSCIC’s Second Canadian Construction Innovation Forum: Building a Strategy for Tomorrow.
- Nguyen, K. M. and Giang, T. L. (2007). On measuring efficiency of hospitals and medical centers in vietnam: a non-parametric approach. Paper prepared for the Regional Economic Development Workshop at Thammasat University, Thailand.
- Oakland, J. S. (1995). Total quality management, 1st Ed., Butterworth-Heinemann, Oxford.
- Parfitt, M. K. and Sanvido, V. E. (1993). “Checklist of critical success factors for building projects.” Journal of Management in Engineering, 9(3), 243–249.
- Project Management Institute, PMI. (2000). A guide to project management body of knowledge. Upper Derby.
- Rad, H. N. and Khosrowshahi, F. (1998). “Quality measurement in construction Project.” ARCOM 14th Annual conference 1998, University of Reading, 389–397
- Slevin, D. P. and Pinto, J. K. (1986). “The project implementation profile: a new tool for project managers.” Project Management Journal, 17(4), 57–70.
- Smallwood, J. and Venter, D. (2001). The performance of contractors: client’s perceptions, performance in product and service. CIB World Building Congress, Wellington, New Zealand.
- Stumpf, J. (2000). “Schedule delay analysis.” Cost Engineering, 42(7), 32–43.
- Walker D. H. T. (1995). “An investigation into construction time performance.” Construction Management and Economics, 13, 263–274.
- Wateridge, J. (1998). “How can IS/IT projects be measured for success.” International Journal of Project Management, 16(1), 59–63.
- Ward, S. C., Curtis, B. and Chapman, C. B. (1991). “Objectives and performance in construction projects.” Construction Management and Economics, 9(4), 343–353.
- Westring, G. (1997). Ghana Public Procurement Reform. An Audit Report prepared for the World Bank, Advokatfirman Cederquist KB, Stockholm.
- World Bank (2003). Ghana 2003 Country Procurement Assessment Report. Ghana Country Department, Washington DC.
- Yasamis, F., Arditi, D. and Mohammadi, J. (2002). “Assessing contractor quality performance.” Construction Management and Economics, 20(3), 211–223.
- Yisa, S., and Edwards, D.J. (2002). “Evaluation of Business Strategies in the UK Construction Engineering Consultancy.” Measuring Business Excellence, 6(1), 23–32.