1,027
Views
16
CrossRef citations to date
0
Altmetric
Articles

Factors affecting cost contingency in the construction industry – Contractors' perspective

&

References

  • Bakhshi P, Touran A. 2012. A new approach for contingency determination in a portfolio of construction projects.‏ J Risk Anal Crisis Response. 2(4):223–232.
  • Baloi D. 2012. Risk analysis techniques in construction engineering projects. J Risk Anal Crisis Response. 2(2):115–123.
  • Barraza GA, Bueno RA. 2007. Cost contingency management. J Manage Eng. 23(3):140–146.
  • Buertey J, Inga E, Kumi T. 2012a. Project cost contingency estimation in Ghana: an integrated approach. Sci J Civil Eng Archit. Available from: http://www.sjpub.org/sjcea/sjcea-214.pdf
  • Buertey JIT, Abeere-Inga E, Kumi TA. 2012b. Construction cost contingency estimating in Ghana: a review of work sections prone to scope changes. Int J Manage. 3(1):237–253.
  • Buertey JIT, Abeere-Inga E, Kumi TA. 2012c. Estimating cost contingency for construction projects: The challenge of systemic and project specific risk. In: Proceedings of the 4th West Africa Built Environment Research (WABER) Conference, 24–26 July 2012, Abuja, Nigeria; p. 413–426.
  • Cha HS, Shin KY. 2011. Predicting project cost performance level by assessing risk factors of building construction in South Korea. J Asian Archit Build Eng. 10(2):437–444.
  • Chileshe N, Yirenkyi-Fianko AB. 2011. Perceptions of threat risk frequency and impact on construction projects in Ghana: opinion survey findings. J Constr Develop Countries. 16(2):115–149.
  • Dikmen I, Birgonul T, Eybpoosh M. 2011. Tracing risk paths in international construction projects: a case study. In: Proceedings of Management and Innovation for a Sustainable Built Environment, 20–23 June, Amsterdam, The Netherlands.
  • Durdyev S, Ismail S, Abu Bakar N. 2012. Factors causing cost overruns in construction of residential projects; case study of Turkey. Int J Sci Manage. 1(1):3–12.
  • Ehsan N, Mirza E, Alam M, Ishaque A. 2010. Risk management in construction industry. In: 3rd IEEE International Conference on Computer Science and Information Technology (ICCSIT), IEEE; p. 16–21.
  • Enshassi A, Al-Najjar J, Kumaraswamy M. 2009. Delays and cost overruns in the construction projects in the Gaza Strip. J Financ Manage Prop Constr. 14(2):126–151.
  • Enshassi A, Mohammed S, Abu Mustafa Z, Mayer PE. 2007. Factors affecting labor productivity in building projects in the Gaza Strip. J Civil Eng Manage. XIII(4):2007, 245–254.
  • Enshassi A, Mohamed S, Abu-Mosa J. 2008. Risk management in building projects in Palestine: contractors' perspective. Emirate J Eng Res. 13(1):29–44.
  • Field A. 2009. Discovering statistics using SPSS. 3rd ed. London: Sage.
  • Hollmann JK. 2008. AACE international recommended practice no. 40R-08. Contingency estimating-general principals. Available from: http://www.docstoc.com/docs/41735097/40R-08.
  • Kasimu MA. 2012. Significant factors that causes cost overruns in building construction project in Nigeria. Interdiscip J Contemp Res Bus. 3(11):775–780.
  • Kim DY, Han SH, Kim H. 2008. Discriminant analysis for predicting ranges of cost variance in international construction projects. J Constr Eng Manage. 134(6):398–410.
  • Kothari CR. 2004. Research methodology. 2nd ed. New Delhi, India: New Age International.
  • Laryea S, Hughes W. 2009. How contractors in Ghana include risk in their bid prices. In: Proceedings of 25th Annual ARCOM Conference, University of London, 7–9 September. Nottingham, UK: Association of Researchers in Construction Management; p. 1295–1304.
  • Laryea S, Hughes W. 2011. Risk and price in the bidding process of contractors. J Constr Eng Manage. 137(4):248–258.‏
  • Le-Hoai L, Lee YD, Lee JY. 2008. Delay and cost overruns in Vietnam large construction projects: a comparison with other selected countries. KSCE J Civil Eng. 12(6):367–377.
  • Lhee SC, Issa RRA, Flood I. 2012. Prediction of financial contingency for asphalt resurfacing projects using artificial neural networks. J Constr Eng Manage. 138(1):22–30.
  • Mehmood M, Shah A. 2012. Qualitative analysis of delay factors in construction projects of higher education sectors of Pakistan. In: Proceedings of Third International Conference on Construction in Developing Countries (ICCIDC–III): Advancing Civil, Architectural and Construction Engineering & Management, 4–6 July, Bangkok, Thailand, Paper 20.
  • Memon AH, Abdul Rahman I, Abdullah MR, Abdu Azis AA. 2010. Factors affecting construction cost in Mara large construction project: perspective of project management consultant. Int J Sustain Constr Eng Tech. 1(2):41–54.
  • Memon A, Rahman I, Azis A. 2011. Preliminary study on causative factors leading to construction cost overrun. Int J Sustain Constr Eng Tech. 2(1):57–71.
  • Oyewobi LO, Ibrahim AD, Ganiyu BO. 2012. Evaluating the impact of risk on contractors tender figure in public buildings projects in northern Nigeria. J Eng Proj Prod Manage. 2(1):2–13.
  • [PCBS] Palestinian Central Bureau of Statistics. 2014. www.pcbs.gov.ps
  • [PCHR] Palestinian Center for Human Rights. 2007. The policy of collective punishment aggravates the humanitarian crisis in the Gaza Strip. Report of the total siege and closure of border crossings and their impacts on the civilian population in the Gaza Strip, 16 July. 30 September 2007. www.pchrgaza.org.
  • [PCU] Palestinian Contracting Union. 2003. Contractors throughout Palestinian districts distribution. www.pcu.ps.
  • Polat G, Duzcan M. 2010. Factors affecting cost contingency in international projects. In: Proceedings of Advancing Project Management for the 21th Century. Concepts, Tools & Techniques for Managing Successful Projects, 29–31 May 2010, Heraklion, Greece; p. 609–617.
  • Project Management Institute. 2009. A guide to the project management body of knowledge (PMBOK guide). 4th ed. Pennsylvania: Project Management Inst.
  • Rahman AR, Memon AH, Abd Karim AT. 2013a. Significant factors causing cost overruns in large construction projects in Malaysia. J Appl Sci. 13(2):286–293.
  • Rahman I, Memon A, Karim A. 2013b. Relationship between factors of construction resources affecting project cost. Modern Appl Sci. 7(1):67–75.
  • Shane JS, Molenaar KR, Anderson S, Schexnayder C. 2009. Construction project cost escalation factors. J Manage Eng. 25(4):221–229.
  • Singh YK. 2006. Fundamental of research methodology and statistics. New Delhi, India: New Age International.
  • Sonmez R, Ergin A, Birgonul MT. 2007. Quantitative methodology for determination of cost contingency in international projects. J Manage Eng. 23(1):35–39.
  • Thal Jr AE, Cook JJ, White III ED. 2010. Estimation of cost contingency for air force construction projects. J Constr Eng Manage. 136(11):1181–1188.
  • Ugwoeri JC. 2012. A holistic survey of risk management in building construction project. In: Proceedings of 4th West Africa Built Environment Research (WABER) Conference, 24–26 July, Abuja, Nigeria; p. 1375–1382.
  • Xie H, AbouRizk S, Zou J. 2012. Quantitative method for updating cost contingency throughout project execution. J Constr Eng Manage. 138(6):759–766.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.