525
Views
16
CrossRef citations to date
0
Altmetric
Articles

Automated safety planning approach for residential construction sites in Malaysia

, , , &

References

  • Abdelhamid TS, Everett JG. 2000. Identifying of root causes of construction accident. J Constr Eng Manage. Jan/Feb:52–60.
  • Abdul Rahim AH, Muhd Zaimi AM, Bachan S. 2008. Causes of accidents at construction sites. Malaysian J Civil Eng. 20(2):242–259.
  • Ayyub BM. 2003. Risk analysis in engineering and economics. College Park, MD: Chapman & Hall/CRC.
  • Azhar S. 2011. Building information modeling (BIM): trends, benefits, risks, and challenges for the AEC industry. Leadership Manage Eng. 11:241–252.
  • Bansal VK. 2011. Application of geographic information systems in construction safety planning. Int J Proj Manage. 29(1):66–77.
  • Bansal VK, Pal M. 2009. Construction schedule review in GIS with a navigable 3D animation of project activities. Int J Proj Manage. 27(5):532–542.
  • Benjaoran V, Bhokha S. 2010. An integrated safety management with construction management using 4D CAD model. Safety Sci. 48(3):395–403.
  • Camino MA, Ritzel DO, Fontaneda I, González OJ. 2008. Construction industry accidents in Spain. J Safety Res. 39(5):497−507.
  • Carbonari A, Giretti A, Naticchia B. 2011. A proactive system for real-time safety management in construction sites. Autom Constr. 20(6):686–698.
  • Carter G, Smith S. 2006. Safety hazard identification on construction projects. J Constr Eng Manage. 132(2):197−205.
  • Chan, DWM, Chan APC, Choi TNY. 2010. An empirical survey of the benefits of implementing pay for safety scheme (PFSS) in the Hong Kong construction industry. J Safety Res. 41(5):433–443.
  • Chantawit D, Hadikusumo BHW, Charoenngam C, Rowlinson S. 2005. 4DCAD-Safety: visualizing project scheduling and safety planning. Constr Innov Inf Process Manage. 5(2):99–114.
  • Cheng, C-W, Lin C-C, Leu S-S. 2010. Use of association rules to explore cause-effect relationships in occupational accidents in the Taiwan construction industry. Safety Sci. 48(4):436–444.
  • Cheng, M-Y, Ko C-H, Chang C-H. 2002. Computer-aided DSS for safety monitoring of geotechnical construction. Autom Constr. 11(4):375–390.
  • Chua DKH, Goh YM. 2005. Poisson Model of Construction Incident Occurrence. J Constr Eng Manage. 131(6):715–722.
  • Dave B, Boddy SC, Koskela LJ. 2010. Improving information flow within the production management system with web services. In Proceedings of the 18th Annual Conference of the International Group for Lean Construction, pp. 445–455. National Building Research Institute, Technion-Israel Institute of Technology.
  • Dejus T. 2007. Accidents on construction sites and their reasons. Avaialble from: http:\\www.vgtu.lt/leidiniai/leidykla/MBM_2007/2pdf/Dejus.pdf.
  • Fan W, Yan Z. 2010. Factors affecting response rates of the web survey: A systematic review. Comput Hum Behav. 26(2):132–139.
  • Fung IW, Tam VW, Lo TY, & Lu LL. 2010. Developing a Risk Assessment Model for construction safety. Int J Proj Manage. 28(6), 593–600
  • Gangolells M, Casals M, Forcada N, Roca X, Fuertes A. 2010. Mitigating construction safety risks using prevention through design. J Safety Res. 41(2):107–122
  • Gervais M. 2003. Good management practice as a means of preventing back disorders in the construction sector. Safety Sci. 41(1):77−88.
  • Hadikusumo BHW, Rowlinson S. 2004. Capturing safety knowledge using design-for safety-process tool. J Constr Eng Manage. 130(2):281–289.
  • Hadikusumo BHW, Rowlinson S. 2002. Integration of virtually real construction model and design-for-safety-process database. Autom Constr. 11(5):501–509.
  • Hinze J. 1981. Human aspects of construction safety. J Constr Div. 107(1):67–72.
  • Hinze J, Raboud P. 1988. Safety on large building construction projects. J Constr. 114(2):286–293.
  • Hu, Z, Zhang J. 2011. BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 2. Development and site trials. Autom Constr. 20(2):167–180.
  • Irizarry J, Gill T. 2009. Mobile applications for information access on construction jobsites. ASCE International Workshop on Computing in Civil Engineering, 24–27 June 2009, Austin, TX.
  • Kartam NA, Bouz RG. 1998 Fatalities and injuries in the Kuwaiti construction industry. Accident Anal Prev. 30(6):805–814.
  • Kim H, Lee H-S, Park M, Lee K-P. 2010. Influence Factor-Based Safety Risk Assessment Methodology for Construction Site. In Construction Research Congress 2010@ sInnovation for Reshaping Construction Practice (pp. 1356–1365). ASCE.
  • Lee U-K, Kim J-H, Cho H, Kang K-I. 2009. Development of a mobile safety monitoring system for construction sites. Autom Constr. 18(3):258–264.
  • Liao CW, Perng YH. 2008. Data mining for occupational injuries in the Taiwan construction industry. Safety Sci. 46(7):1091–1102.
  • Lubega HA, Kiggundu BM, Tindiwensi D. 2000. An investigation into the causes of accidents in the construction industry in Uganda.2nd International Conference on Construction in Developing Countries: Challenges Facing the Construction Industry in Developing Countries, p. 1–12. Available from: http://buildnet.csir.co.za
  • Manuele FA. 2006. Achieving risk reduction, effectively. Process Safety Environ Protect. 84(3b):184−190.
  • McLaughlin J, Sreenivasan SV, Haas C, Liapi K. 2004. Rapid human-assisted creation of bounding models for obstacle avoidance in construction. Comput Aided Civil Infrastruct Eng. 19(1):3–15.
  • Modarres M. 2006. Risk analysis in engineering: techniques, tools, and trends. Boca Raton, FL: CRC Press.
  • Mohd-Nor MFI, Usman IMS, Mazlan-Tahir M. 2009. How the professional practice and the architecture education in Malaysia is catching up with the development of CAD. Eur J Social Sci. 9(4):677–683.
  • Navon R, Kolton O. 2006. Model for automated monitoring of fall hazards in building construction. J Constr Eng Manage. 132(7), 733–740.
  • Niza C, Silva S, Lima ML. 2008. Occupational accident experience association with workers' accident explanation and definition. Safety Sci. 46(4):959–971.
  • Pallant J. 2001. SPSS Survival manual. A step by step guide to data analysis using SPSS for windows (Version 10–11). Buckingham: Open University Press.
  • Pipitsupaphol T, Watanabe T. 2000. Identification of root causes of labor accidents in the Thai construction industry. Proceedings of the 4th Asia Pacific Structural Engineering and Construction Conference (APSEC 2000); p. 193–202.
  • Shih TH, Fan X. 2009. Comparing response rates in e-mail and paper surveys: a meta-analysis. Educat Res Rev. 4(1):26–40.
  • Song J, Haas CT, Caldas C, Ergen E, Akinci B. 2006. Automating the task of tracking the delivery and receipt of fabricated pipe spools in industrial projects. Autom Constr. 15(2):166–177.
  • Sulankivi K, Kähkönen K, Mäkelä T, Kiviniemi M. 2010. 4D-BIM for construction safety planning. In: Barrett P, Amaratunga D, Haigh R, Keraminiyage K, Pathirage C, editors. Manchester: CIB; p. 2010.
  • Tam CM, Fung IWH. 1998. Effectiveness of safety management strategies on safety performance. Constr Manage Econ. 16(1):49–55.
  • Tam CM, Zeng SX, Deng ZM. 2004. Identifying elements of poor construction safety management in China. Safety Sci. 42:569–586.
  • Wang W-C, Liu J-J, Chou S-C. 2006. Simulation-based safety evaluation model integrated with network schedule. Autom Constr. 15(3):341−354.
  • Yakubu DM, Bakri IM. 2013. Evaluation of safety and health performance on construction sites (Kuala Lumpur). J Manage Sustain. 3(2):100–109.
  • Yi K-J, Langford D. 2006. Scheduling-based risk estimation and safety planning for construction projects. J Constr Eng Manage. 132(6):626–635.
  • Yu H. 2009. A knowledge based system for construction health and safety competence assessment. University of Wolverhampton. United Kingdom.
  • Zaki M. 2006. Dynamic quantification and analysis of the construction workspace congestion utilising 4D visualisation. Autom Constr. 15(5):640–655.
  • Zhang JP, Hu ZZ. 2011. BIM- and 4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction: 1. Principles and methodologies. Autom Constr. 20(2):155–166.
  • Zhou W, Whyte J, Sacks R. 2011. Construction safety and digital design: a review. Autom Constr.
  • Zhou W, Whyte J, Sacks R. 2012. Construction safety and digital design: A review. Autom Constr. 22:102–111.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.