1,847
Views
25
CrossRef citations to date
0
Altmetric
Articles

Design–construction interface problems in large building construction projects

, ORCID Icon, , &

References

  • Alarcon LF, Mardones DA. 1998. Improving the design–construction interface. Paper presented at: Sixth Annual Conference of the International Group for Lean Construction ; Sao Paulo, Brazil.
  • Al-Hammad AM. 1990. A study of interface problem between owners and contractors over the construction of residential houses in Saudi Arabia. Hous. Sci. 14:245–257.
  • Al-Hammad AM. 1993. Factors affecting the relationship between contractors and their sub-contractors in Saudi Arabia. J. Build. Res. Inf. 21:269–273.
  • Al-Hammad AM. 1995. Interface problems between owners and maintenance contractors in Saudi Arabia. J. Perform. Constr. Facil. 9:194–205.
  • Al-Hammad AM. 2000. Common interface problems among various construction parties. J. Perform. Constr. Facil. 14:71–74.
  • Al-Hammad AM, Al-Hammad I. 1996. Interface problems between building owners and designers. J. Perform. Constr. Facil. 10:123–126.
  • Al-Hammad AM, Assaf SA. 1992. Design–construction interface problems in Saudi Arabia. J. Build. Res. Inf. 20:61–63.
  • Al-Hazmi MHS. 1987. Causes of delays in large building construction projects [MSc thesis]. Dhahran, Saudi Arabia: Faculty of Environmental Design, King Fahd University of Petroleum and Minerals.
  • Al-Mansouri O. 1988. The relationship between the designer and contractor in Saudi Arabia. [ dissertation]. Reading, UK: Faculty of Urban and Regional Studies, University of Reading.
  • Arain FM. 2002. Design–construction interface dissonances. [ MSc thesis]. Dhahran, Saudi Arabia: Faculty of Environmental Design, King Fahd University of Petroleum and Minerals.
  • Assaf SA, Al-Hejji S. 2006. Causes of delay in large construction projects. Int. J. Proj. Manag. 24:349–357.
  • Chang AS, Shen FY, Ibbs W. 2010. Design and construction coordination problems and planning for design–build project new users. Can. J. Civ. Eng. 37:1525–1534.
  • Chen Q, Reichard G, Beliveau YPE. 2008. Multiperspective approach to exploring comprehensive cause factors for interface issues. J. Constr. Eng. Manag. 134:432–441.
  • Dmaidi N, Dwaikat M, Shweiki I. 2013. Construction contracting management obstacles in Palestine. J. Constr. Eng. Manag. 2:15–22.
  • Engineers Association – Jerusalem [Internet]. 2014. The portal of the Engineers Association – Jerusalem Branch. [ cited May 2014]. Available from: http://www.paleng.org/.
  • El-Namrouty K. 2012. The impact of construction sector on Palestinian economy – case study: Gaza Strip. Am. Acad. Sch. Res. J. 4(5): 1.
  • Enshassi A, Arain F, Tayeh B. 2012. Major causes of problems between contractors and subcontractors in the Gaza Strip. J. Financ. Manag. Prop. Constr. 17:92–112.
  • Hinze J, Tracey A. 1994. The contractor–subcontractor relationship: the subcontractors’ view. J. Constr. Eng. Manag. 120:274–287.
  • Huang RY, Huang CT, Lin H, Ku WH. 2008. Factor analysis of interface problems among construction parties: a case study of MRT. J. Mar. Sci. Technol. 16:52–63.
  • Kish L. 1995. Survey sampling. 1st ed. New York: John Wiley and Sons.
  • Kushnir I. [ Internet]. 2012. Construction in Palestine 1970–2012. Ivan Kushnir's Research Center. [ cited May 2014]. Available from: http://www.kushnirs.org.
  • Mahamid I. 2011. Analysis of cost deviations in road construction activities – a case study from Palestine. Jordan J. Civ. Eng. 5(4):552–567.
  • McCarney, M and Gibb A. 2012. Interface management from an offsite construction perspective. In: Smith, SD, editor. Proceedings of the 28th Annual ARCOM Conference; 3–5 September 2012; Edinburgh, UK: Association of Researchers in Construction Management; p. 775–784.
  • Mitchell A, Frame I, Coday A, Hoxley M. 2011. A conceptual framework of the interface between the design and construction processes. J. Eng. Constr. Archit. Manag. 18:297–311.
  • Mortaheb MM, Rahimi M. 2010. Interface management in mega oil refinery projects. Paper presented at: International Project Management Conference; Tehran, Iran, 26–27 October.
  • Palestinian Central Bureau of Statistics (PCBS) [Internet]. 2013. Palestine in numbers 2013. Issued by PCBS. [ cited May 2014 ]. Available from: http://www.pcbs.gov.ps/.
  • Palestinian Contractors Union (PCU) [Internet]. 2014. The portal of the Palestinian Contractors Union. [ cited May 2014]. Available from: http://www.pcu.ps/.
  • Pffaffenberger R, Patterson J. 1977. Statistical methods for business and economics. Homewood, IL: Richard D. Irwin.
  • Pilot Study. 2014. AMAAR and CCC commercial towers’ publication; Ramallah, Palestine.
  • Sugumaran B, Lavanya MR. 2013. Evaluation of design construction interface in construction industry. Int. J. Eng. Res. Technol. (IJERT). 2(1):1–14.
  • Tian, X. (2013). Influencing factors for project interface management; p. 448–456. doi:10.1061/9780784413135.042
  • Vanegas, J. A., Opdenbosch, A. (1994). Using simulation and visualization technologies to strengthen the design/construction interface. Winter Simulation Conference Proceedings, 1137–1144.
  • Verma VK. 1995. The human aspects of project management: Organizing projects for success. Newtown Square, PA: Project Management Institute; p. 15–190.
  • Wang Y. 2000. Coordination issues in Chinese large building projects. J. Manag. Eng. 16:54–61.
  • Weshah N, El-Ghandour W, Jergeas G, Falls LC. 2013. Factor analysis of the interface management (IM) problems for construction projects in Alberta. Can. J. Civ. Eng. 40:848–860.
  • Wren D. 1967. Interface and inter-organizational coordination. Acad. Mana. J. 10:69–81.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.