References
- Abdul-Malak MA, El-Saadi MM, Abou-Zeid MG. 2002. Process model for administrating construction claims. J Manag Eng. 18(2):84–94.
- Al-Khalil M, Al-Ghafly M. 1999. Important causes of delay in the public utility projects in Saudi Arabia. J Constr Manag Econ. 17(5):647–655.
- Al-Mohsin M. 2012. Claim analysis of construction projects in Oman. Int J Adv Sci Eng Inf Technol. 2(2):73–78.
- Al-Qershi MT, Kishore R. 2017. Claim causes and types in Indian construction industry – contractor’s perspective. Am J Civ Eng Archit. 5(5):196–203.
- Arabian Business. 2018. [accessed 2018 Feb 26]. http://www.arabianbusiness.com/news/390589-dubai-registers-150-new-real-estate-projects-worth-22bn-in-2017.
- ASCE Technical Committee on Contracting Practices of the Underground Technology Research Council. 1991. Avoiding and resolving disputes during construction: successful practices and guidelines. New York (NY): ASCE.
- BIE: Expo 2020 Dubai. 2017. Paris: Bureau International des Expositions; [accessed 2017 Oct 23]. http://www.bie-paris.org/site/en/2020-dubai.
- Bolarinawa O. 2015. Principles and methods of validity and reliability testing of questionnaires used in social and health science researches. Niger Postgrad Med J. 22(4):195–201.
- Chaphalkar N, Iyer K. 2014. Factors influencing decisions on delay claims in construction contracts for Indian scenario. Aust J Constr Econ Build. 14(1):32–44.
- Chaphalkar N, Sandbhor S. 2015. Application of neural networks in resolution of disputes for escalation clause using neuro-solutions. KSCE J Civ Eng. 19(1):10–16.
- Dubai Statistics Center: Population Bulletin for the Emirate of Dubai. 2016. Dubai: Government of Dubai; [accessed 2017 Jun 6]. https://www.dsc.gov.ae/Publication/Population%20Bulletin%20Emirate%20of%20Dubai%202016.docx.
- Dujari M, Gupta S. 2017. A review paper on construction disputes. Int J Eng Sci Manag. 7(1):42–46.
- Export.gov: United Arab Emirates Country Commercial Guide. 2017. [accessed 2017 Jul 24]. https://www.export.gov/article?id=United-Arab-Emirates-Construction.
- Gulf Business. 2016. [accessed 2017 Jul 24]. http://gulfbusiness.com/dewa-launches-worlds-largest-concentrated-solar-power-project/.
- Gulf News. 2018. [accessed 2018 Feb 26]. http://gulfnews.com/business/property/some-of-the-uae-s-mega-residential-projects-to-watch-out-for-1.2115974.
- Ho SP, Liu LY. 2004. Analytical model for analyzing construction claims and opportunistic bidding. J Constr Eng Manag. 130(1):94–104.
- Holt G. 2014. Asking questions, analysing answers: relative importance revisited. J Constr Innov. 14(1):2–16.
- Iyer K, Chaphalkar N, Patil S. 2012. Use of artificial intelligence techniques for construction dispute resolution – an overview. Int J Adv Manag Technol Eng Sci. 1(6):115–120.
- Jamieson S. 2004. Likert scales and how to abuse them. J Med Educ. 38(12):1212–1218.
- Kerr M, Ryburn D, McLaren B, Or Z. 2014. Construction and projects in United Arab Emirates: overview. Dubai (UAE): Association of Corporate Counsel (UAE); [accessed 2017 Jun 12]. https://www.dentons.com/∼/media/PDFs/Insights/2013/September/United%20Arab%20Emiratespdf.pdf.
- Lascelles G. 2017. The international comparative legal guide to: litigation and dispute resolution 2017. London (UK): Global Legal Group Ltd.
- Lookup.ae: UAE Construction Spending. 2017. [accessed 2017 Nov 1]. https://lookup.ae/news/9081/uae-construction-spending-up-63-in-2017-to-805-billion.
- Mohamed H, Ibrahim H, Soliman A. 2014. Reducing construction disputes through effective claims management. Am J Civ Eng Archit. 2(6):186–196.
- Moura H, Teixeira JC. 2007. Types of construction claims: a Portuguese survey. Proceedings of the Annual ARCOM Conference; Sep 3–5; Belfast. UK: Association of Research in Construction Management. p. 129–135.
- Ren Z, Anumba C, Ugwu O. 2003. Multiagent system for construction claims negotiation. J Comput Civ Eng. 17(3):180–188.
- Safinia S. 2014. A review on dispute resolution methods in UK construction industry. Int J Constr Eng Manag. 3(4):105–108.
- Sangoseni O, Hellman M, Hill C. 2013. Development and validation of a questionnaire to assess the effect of online learning on behaviors, attitude and clinical practices of physical therapists in United States regarding of evidence-based practice. Internet J Allied Health Sci Pract. 11(2):1–12.
- Scott S. 1997. Delay claims in UK contracts. J Constr Eng Manag. 123(3):238–244.
- Shadid M. 2015. Construction claims management in United Arab Emirates construction industry [master’s thesis]. Gazimağusa, North Cyprus: Eastern Mediterranean University.
- Shah A, Bhatt R, Bhavsar J. 2014. Types and causes of construction claims. Int J Eng Res Technol. 3(12):732–735.
- Sibanyama G, Muya M, Kaliba C. 2012. An overview of construction claims: a case study of the Zambian construction industry. Int J Constr Manag. 12(1):65–81.
- Singh A, Sakamoto I. 2001. Multiple claims in construction law: educational case study. J Prof Issues Eng Educ Pract. 127(3):122–129.
- Waris M, Liew MS, Khamidi MF, Idrus A. 2014. Criteria for the selection of sustainable onsite construction equipment. Int J Sustain Built Environ. 3(1):96–110.
- Zaneldin E. 2006. Construction claims in United Arab Emirates: types, causes, and frequency. Int J Proj Manag. 24:453–459.
- Zaneldin E, Sivaloganathan S. 2017. A framework for the selection of heavy construction equipment. Proceedings of the 2017 International Annual Conference of the ASEM; Oct 18–21; Huntsville. Alabama (AL): ASEM.