313
Views
6
CrossRef citations to date
0
Altmetric
Original Articles

Developing a temporary multi-organization integration performance index for delivering construction projects in Malaysia

ORCID Icon, , ORCID Icon & ORCID Icon

References

  • Aapaoja A, Herrala M, Pekuri A, Haapasalo H. 2013. The characteristic of and cornerstones for creating integrated teams. Int J Manag Projects Bus 6(4):695–713.
  • Alashwal AM, Fong, 2015. Empirical study to determine fragmentation of construction projects. J Construct Eng Manage. 141(7):04015016.
  • Anvuur AM, Kumaraswamy MM, Fellows R. 2012. Perceptions of status and TMO workgroup cooperation: implications for project governance. Construct Manage Econ. 30(9):719–737.
  • Awuzie BO, McDermott P. 2015. A conceptual model for evaluating infrastructure-based temporary multi-organisations. Built Environ Project Asset Manage. 5(1):103–120.
  • Baiden BK, Price ADF, Dainty ARJ. 2006. The extent of team integration within construction projects. Int J Project Manage. 24(1):13–23.
  • Bakker, RM, DeFillippi RJ, Schwab A, Sydow J. 2016. Temporary organizing: promises, processes, problems. Org Stud. 37(12):1703–1719.
  • Bresnen M. 2007. Deconstructing partnering in project based organisation: seven pillars, seven paradoxes and seven deadly sins. Int J Project Manage. 25(4):365–74.
  • Brady SR. 2015. Utilizing and adapting the Delphi method for use in qualitative research. Int J Qual Methods. 14(5):1–6.
  • Bryman A, Bresnen M, Beardsworth AD. 1987. The concept of temporary the system: The case of the construction project. Res Sociol Org Res Ann. 5:253–283.
  • Buede DM. 2009. The engineering design of systems: models and methods. 2nd ed. Hoboken (NJ): Wiley.
  • Burke CM, Morley MJ. 2016. On temporary organizations: a review, synthesis and research agenda. Human Relat. 69(6):1235–1258.
  • Chan APC, Hu Y, Ma L, Shan M. 2016. Improving the outcomes of public drainage projects through NEC3-based relational contracting: Hong Kong case study. J Prof Issues Eng Educ Pract. 142(2):06015003.
  • Che Ibrahim CKI, Costello SB, Wilkinson S. 2013. Development of a conceptual team integration performance index for alliance projects. Construct Manage Econ. 31(11):1127–1142.
  • Che Ibrahim CKI, Costello SB, Wilkinson S. 2015. Key indicators influencing the management of team integration in construction projects. Int J Manag Projects Bus. 8(2):300–323.
  • Che Ibrahim CKI, Rahmat A, Belayutham S. 2017. Ensuring teams integrate better: Views from Malaysian Construction Builders. Proceedings of the CRIOCM 2017 22nd International Conference on Advancement of Construction Management and Real Estate, Swinburne University of Technology, 20–23 November 2017. Hawthorn, Melbourne, Australia.
  • Cheung SO, Suen HCH, Cheung KKW. 2003. An automated partnering monitoring system—Partnering temperature index. Automat Constr. 12(3):331–345.
  • Davis PR, Jefferies M, Ke Y. 2017. Psychological contracts: framework for relationships in construction procurement. J Construct Eng Manage. 143(8):04017028.
  • de Blois M, Lizarralde G, De Coninck P. 2016. Iterative project processes within temporary multi-organizations in construction: the self-, eco-, re-organizing projects. Project Manage J. 47(1):27–44.
  • Egan J. 2002. Accelerating change. A report by the strategic forum for construction, rethinking construction. London: Rethinking Construction, Construction Industry Council.
  • Frodell M, Josephson PE, Lindahl G. 2008. Swedish construction clients' views on project success and measuring performance. J Eng Des Technol.. 6(1):21–32.
  • Hallowell MR, Gambatese JA. 2010. Qualitative research: application of the Delphi method to CEM research. J Construct Eng Manage. 136(1):99–107.
  • Hanafin S. 2004. Review of literature on the Delphi technique. Dublin: National Children’s Office. https://www.dcya.gov.ie/documents/publications/Delphi_Technique_A_Literature_Review.pdf
  • Haniff A, Ogunlana SO. 2015. Towards a theory of temporary multi organisations: implications for project success. Engineering Project Organization Conference, June 24–26; Scotland, UK: The University of Edinburgh.
  • Hu Y, Chan APC, Le Y, Xu Y, Shan M. 2016. Developing a program organization performance index for delivering construction megaprojects in China: fuzzy synthetic evaluation analysis. J Manage Eng. 32(4):05016007.
  • Janowicz M, Bakker RM, Kenis PN. 2008. Temporary organizations: the state of the art and distinct approaches toward "temporariness". Paper presented at PMI® Research Conference: defining the future of project management, Warsaw, Poland. Newtown Square, PA: Project Management Institute.
  • Jin XH, Tan HC, Zuo J, Feng Y. 2012. Exploring critical success factors for developing infrastructure projects in malaysia – main contractors’ perspective. Int J Construct Manage. 12(3):25–41.
  • Jones C, Lichtenstein BB. 2008. Temporary inter-organizational projects: how temporal and social embeddedness enhance coordination and manage uncertainty. In: Cropper S, Huxham C, Ebers M, Ring PS, editors. The Oxford handbook of inter-organizational relations. Oxford (UK): Oxford University Press.
  • Kapogiannis G, Sherratt F. 2018. Impact of integrated collaborative technologies to form a collaborative culture in construction projects. Built Environ Project Asset Manage. 8(1):24–38.
  • Kokkonen A, Vaagaasar AL. 2018. Managing collaborative space in multi-partner projects. Construct Manage Econ. 36(2):83–95.
  • Kusuma IC. 2016. The evolution of culture-climate interplay in temporary multi organisations: the case of construction alliancing projects [Ph.D. thesis]. London (UK): The Bartlett School of Construction and Project Management, University College London. http://discovery.ucl.ac.uk/1476944/13/Illona%20Kusuma% 20Thesis%20 Restrictied%20Version.pdf [accessed 2017 July 14].
  • Lai KS, Yusof NA, Kamal EM. 2016. Organizational culture of the architectural firm: a case in a developing country. Int J Construct Manage. 16(3):197–208.
  • Lavikka RH, Smeds R, Jaatinen M. 2015. Coordinating collaboration in contractually different complex construction projects. Supply Chain Manage Int J. 20(2):205–217.
  • Lim BTH, Ling FYY, William Ibbs C, Raphael B, Ofori G. 2011. Empirical analysis of the determinants of organizational flexibility in the construction business. J Construct Eng Manage. 137(3):225–237.
  • Ling FYY, Khoo WW. 2016. Improving relationships in project teams in Malaysia. Built Environ Project Asset Manage. 6(3):284–301.
  • Liu AMM, Chan IYS. 2017. Understanding the interplay of organizational climate and leadership in construction innovation. J Manage Eng. 33(5):04017021.
  • Lizarralde G, De Blois M, Davidson C. 2011a. Relations intra- and inter-organisations for the study of the temporary multi-organisation in construction projects. Int J Project Org Manage. 3(1):57–77.
  • Lizarralde G, de Blois M, Latunova I. 2011b. Structuring of temporary multi-organizations: contingency theory in the building sector. Project Manage J. 42(4):19–36.
  • Lundin RA, Söderholm A. 1995. A theory of the temporary organization. Scand J Manage. 11(4):437–455.
  • Luzon B, El-Sayegh SM. 2016. Evaluating supplier selection criteria for oil and gas projects in the UAE using AHP and Delphi. Int J Construct Manage. 16(2):175–183.
  • Mohammed S, Nadkarni S. 2011. Temporal diversity and team performance: the moderating role of team temporal leadership. Acad Manage J. 54(3):489–508.
  • Molenaar KR, Leicht RM. 2015. Study shows importance of team integration. IQ Magazine Articles, Issue 2. http://www.designbuilddoneright.com/study-shows-importance-of-team-integration/ [accessed 10 August 2017].
  • Mollaoglu-Korkmaz S, Miller, VD, Sun W. 2014. Assessing key dimensions to effective innovation implementation in interorganizational project teams: an integrated project delivery case. Eng Project Org J. 4(1):17–30
  • Moore DR, Dainty ARJ. 1999. Integrated project teams’ performance in managing unexpected change events. Team Perform Manage. 5(7):212–222.
  • Osei-Kyei R, Chan APC. 2017. Developing a project success index for public–private partnership projects in developing countries. J Infrastruct Syst. 23(4):04017028.
  • Packendorff J. 1994. Temporary organizing: integrating organization theory and project management. In: Lundin RA, Packendorff J, editors. Proceedings of the IRNOP conference on temporary organizations and project management, March 22–25, Lycksele, Sweden: The International Research Network on Organizing by Projects (IRNOP).
  • Pearce CL, Conger JA. 2002. Shared leadership: reframing the hows and whys of leadership. 1st ed. Thousand Oaks (CA): SAGE Publications.
  • Perera BAKS, Rameezdeen R, Chileshe N, Hosseini MR. 2014. Enhancing the effectiveness of risk management practices in Sri Lankan road construction projects: a Delphi approach. Int J Construct Manage. 14(1):1–14.
  • Pocock J, Hyun CT, Liu LY, Kim MK. 1996. Relationship between project interaction and performance indicators. J Construct Eng Manage. 122(2):165–176.
  • Poleacovschi C, Javernick-Will A. 2017. Who are the experts? Assessing expertise in construction and engineering organizations. J Construct Eng Manage. 143(8):04017033.
  • Shadid WK. 2018. A framework for managing organizations in complex environments. Construct Manage Econ. 36(4):182–202.
  • Shariff NJ. 2015. Utilizing the Delphi survey approach: a review. J Nurs Care. 4(3):1000246.
  • Shan M, Chan APC, Le Y, Hu Y, and Xia B. 2017. Understanding collusive practices in Chinese construction projects. J Professional Issues Eng Educ Pract. 143(3):05016012.
  • Stringer J. 1967. Operational research for “multi-organisations'’ Opl Res Q. 18:105–120.
  • Sourani A, Sohail M. 2015. The Delphi method: Review and use in construction management research. Int J Construct Educ Res. 11(1):54–76.
  • Tymvios N, Gambatese JA. 2016. Direction for generating interest for design for construction worker safety: a delphi study. J Construct Eng Manage. 142(8):04016024.
  • Tyssen AK, Wald A, Spieth P. 2013. Leadership in temporary organizations: a review of leadership theories and a research agenda. Project Manage J. 44(6):52–67.
  • Walker DH, Davis PR, Stevenson A. 2017. Coping with uncertainty and ambiguity through team collaboration in infrastructure projects. Int J Project Manage. 35(2):180–190.
  • Walker DHT, Lloyd-Walker BM. 2015. Collaborative project procurement arrangements. Newtown Square (PA): Project Management Institute..
  • Xia B, Chan APC. 2012. Measuring complexity for building projects: a Delphi study. Eng Construct Architect Manage. 19(1):7–24.
  • Xue X, Shen Q, Ren Z. 2010. Critical review of collaborative working in construction projects: business environment and human behaviors. J Manage Eng. 26(4):196–208.
  • Yeung JFY, Chan APC, Chan DWM. 2009. Developing a performance index for relationship-based construction projects in Australia: Delphi study. J Manage Eng. 25(2):59–68.
  • Yeung JFY, Chan APC, Chan DWM, Lin LK. 2007. Development of a partnering performance index (PPI) for construction projects in Hong Kong: a Delphi study. Construct Manage Econ. 25(12):1219–1237.
  • Yong YC, Mustaffa NE. 2012. Analysis of factors critical to construction project success in Malaysia. Eng Construct Architect Manage. 19(5):543–556.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.