Presenting a goal programming model in the time-cost-quality trade-off

, &
Pages 1-11 | Received 05 Feb 2018, Accepted 18 Jul 2018, Published online: 08 Nov 2018

References

  • Abbasnia R, Afshar A, Eshtehardian E. 2008. Time-cost trade-off problem in construction project management, based on fuzzy logic. J Appl Sci. 8(22):4159–4165.
  • AbdelSalam HM, Bao HP. 2000. Solving the project time-cost trade-off problem through an integrated engineering-computation environment. Proceedings of the 11th Annual Conference of the Production and Operations Management Society, POM-2000; 1–4 April; San Antonio, TX, Vol. 1, No. 4.
  • Babu AJG, Suresh N. 1996. Project management with time, cost, and quality considerations. Eur J Oper Res. 88(2):320–327.
  • Badri MA, Davis D, Davis D. 2001. A comprehensive 0–1 goal programming model for project selection. Int J Project Manage. 19(4):243–252.
  • Błaszczyk T, Nowak M. 2009. The time‐cost trade‐off analysis in construction project using computer simulation and interactive procedure. Technol Econ Dev Econ. 15(4):523–539.
  • Cohen I, Golany B, Shtub A. 2007. The stochastic time–cost tradeoff problem: a robust optimization approach. Networks. 49(2):175–188.
  • Demeulemeester E, De Reyck B, Foubert B, Herroelen W, Vanhoucke AM. 1998. New computational results on the discrete time/cost trade-off problem in project networks. J Oper Res Soc. 49(11):1153–1163.
  • Hajiagha SHR, Akrami H, Hashemi SS, Amoozad H. 2015. An integer grey goal programming for project time, cost and quality trade-off. Ekon Eng Econ. 26(1):93–100.
  • Hajiagha SHR, Mahdiraji HA, Hashemi SS. 2014. A hybrid model of fuzzy goal programming and grey numbers in continuous project time, cost, and quality tradeoff. Int J Adv Manuf Technol. 71(1–4):117–126.
  • Hegazy T. 1999. Optimization of construction time-cost trade-off analysis using genetic algorithms. Can J Civ Eng. 26(6):685–697.
  • Hu W, He X. 2014. An innovative time-cost-quality tradeoff modeling of building construction project based on resource allocation. Sci World J.
  • Iranmanesh H, Skandari MR, Allahverdiloo M. 2008. Finding Pareto optimal front for the multi-mode time, cost quality trade-off in project scheduling. World Acad Sci Eng Technol. 40:346–350.
  • Kelley JE. 1961. Critical-path planning and scheduling: mathematical basis. Oper Res. 9(3):296–320.
  • Kim J, Kang C, Hwang I. 2012. A practical approach to project scheduling: considering the potential quality loss cost in the time–cost tradeoff problem. Int J Project Manage. 30(2):264–272.
  • Lee JW, Kim SH. 2000. Using analytic network process and goal programming for interdependent information system project selection. Comput Oper Res. 27(4):367–382.
  • Lewis JP. 2010. Project planning, scheduling, and control: the ultimate hands-on guide to bringing projects in on time and on budget. New York, NY: McGraw-Hill.
  • Li H, Cao JN, Love PED. 1999. Using machine learning and GA to solve time-cost trade-off problems. J Constr Eng Manage. 125(5):347–353.
  • Liang TF. 2009. Fuzzy multi-objective project management decisions using two-phase fuzzy goal programming approach. Comput Indust Eng. 57(4):1407–1416.
  • Mokhtari H, Aghaie A. 2009. The effect of price discount on time-cost trade-off problem using genetic algorithm. Engineering 01(1):33.
  • Mubiru PK. 2010 (October). A goal programming model for allocating time and cost in project management. In: Proceedings of the 6th ORSEA Conference; Kampala, Uganda. p. 14–15.
  • Nikoomaram H, Lotfi FH, Jassbi J, Shahriari MR. 2010. A new mathematical model for time cost trade-off problem with budget limitation based on time value of money. Appl Math Sci. 4(63):3107–3119.
  • Rahimi M, Iranmanesh H. 2008. Multi objective particle swarm optimization for a discrete time, cost and quality trade-off problem. World Appl Sci J. 4(2):270–276.
  • Siemens N. 1971. A simple CPM time-cost tradeoff algorithm. Manage Sci. 17(6):B-354–B-363.
  • Senouci A, El-Rayes K. 2009. Time-profit trade-off analysis for construction projects. J Constr Eng Manage. 135(8):718–725.
  • Shahsavari-Pour N, Modarres M, Tavakoli-Moghadam R, Najafi E. 2010. Optimizing a multi-objectives time-cost-quality trade-off problem by a new hybrid genetic algorithm. World Appl Sci J. 10(3):355–363.
  • Snyder C, Dionisio CS. 2017. A project manager's book of forms: a companion to the PMBOK guide. New York: John Wiley & Sons.
  • Zeng J, An M, Smith N. 2007. Application of a fuzzy based decision making methodology to construction project risk assessment. Int J Proj Manage. 25(6):589–600.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.