Simultaneous multi-criteria optimization for scheduling linear infrastructure projects

, &
Pages 41-55 | Received 15 Aug 2017, Accepted 24 Jul 2018, Published online: 01 Oct 2018

References

  • Ammar MA. 2013. LOB and CPM integrated method for scheduling repetitive projects. J Constr Eng Manag. 139(1):44–50.
  • Beradi L, Giustolisi O, Savic D, Kapelan Z. 2009. An effective mulit-objective approach to prioritization of sewer pipe inspection. J Water Sci Technol. 60(4):841–850.
  • Chan W, Chua D, Kannan G. 1996. Construction resource scheduling with genetic algorithms. J Constr Eng Manag. 122(2):125–132.
  • Cole LJR. 1991. Construction scheduling: principles, practices, and six case studies. J Constr Eng Manag. 117(4):579–588.
  • Dolabi HAZ, Afshar A. 2016. Cost optimization of repetitive projects with varying production rates using a max-min ant system. Construction Research Congress Reston, Virginia, U.S.A.: American Society for Civil Engineering.
  • Duffy G, Oberlender G, Jeong D. 2011. Linear scheduling model with varying production rates. J Constr Eng Manag. 137(8):574–582.
  • Eid M, El-Adaway I. 2017a. Integrating the social vulnerability of host communities and the objective functions of associated stakeholders during disaster recovery processes using agent-based modeling. J Manag Eng. 31(5):1–15.
  • Eid M, El-Adaway I. 2017b. Sustainable disaster recovery decision-making support tool: integrating economic vulnerability into the objective functions of the associated stakeholders. J Manag Eng. 33(2):04016041–04016019.
  • Eid M, El-Adaway I. 2017c. Sustainable disaster recovery: multi-agent based model for integrating environmental vulnerability into decision making processes of the associated stakeholders. J Urban Plan Dev. 143(1):04016022.
  • Eid M, El-Adaway I, Coatney K. 2015. Evolutionary stable strategy for postdisaster insurance: game theory approach. J Manag Eng. 31(6):04015005. doi:10.1061/(ASCE)ME.1943-5479.0000357.
  • Elbeltagi E, Hegazy T, Grierson D. 2005. Comparison among five evolutionary-based optimization algorithms. Adv Eng Inf. 19(1):43–53.
  • Elbelatgi E, ElKassas EM. 2008. Cost optimization of projects with repetitive activities using genetic algorithms. In Papadrakakis M, Topping BHV, editors. The sixth international conference on engineering computational technology. Stirlingshire, Scotland: Civil-Comp Press, Paper Ref. 66, Sep. 2-5, 2008, Athens, Greece; p. 15.
  • Elbeltagi E, Hegazy E, Grierson D. 2010. A new evolutionary strategy for Pareto multi-objective optimization. In: Topping BHV, Adam JM, Pallares FJ, Bru R, Romero ML, editors. The seventh international conference on engineering computational technology. Stirlingshire, Scotland: Civil-Comp Press, Paper Ref. 19, Sep. 14-17, 2010, Valencia, Spain; p. 17.
  • El-Rayes K, Moselhi S. 1998. Resource-driven scheduling of repetitive activities. Constr Manag Econ. 16(4):433–446.
  • El-Rayes K, Moselhi O. 2001. Optimizing resource utilization for repetitive construction projects. J Constr Eng Manag. 127(1):18–27.
  • Fan S, Lin Y. 2007. Time-cost trade-off in repetitive projects with soft logic. Comp in Civil Eng. ASCE. 83–90.
  • Feng C, Liu L, Burns S. 1997. Using genetic algorithms to solve construction time-cost trade-off problems. J Comput Civil Eng. 11(3):184–189.
  • Grierson DE. 2008. Pareto multi-criteria decision making. Adv Eng Inf, Elsevier, 22(3), 371–384.
  • Harmelink DJ. 1995. Linear scheduling model: the development of a linear scheduling model with micro computer applications for highway construction control. PhD thesis. Ames, Iowa: Iowa State Univ.
  • Hegazy T, Ayed A. 1999. Simplified spreadsheet solutions: models for critical path method and Time–cost trade-off analysis. Cost Eng. 41(7):26–33.
  • Hegazy T, Elhakeem A, Elbeltagi E. 2004. Distributed scheduling model for infrastructure networks. J Constr Eng Manag. 130(2):160–167.
  • Hegazy T, Kamarah E. 2008. Efficient repetitive scheduling for high-rise construction. J Constr Eng Manag. 134(4):253–264.
  • Hegazy T, Wassef N. 2001. Cost optimization in projects with repetitive non-serial activities. J Constr Eng Manag. 127(3):183–191.
  • Hsie M, Chang C-J, Yang I-T, Huang C-Y. 2009. Resource-constrained scheduling for continuous repetitive projects with time-based production units. Autom Constr. 18(7):942–949.
  • Holland JH. 1975. Adaptation in natural and artificial systems. Ann Arbor, Mich.: University of Michigan Press.
  • Huang R, Sun K. 2006. Non-unit-based planning and scheduling of repetitive construction projects. J Constr Eng Manage. 132(6):585–597.
  • Huang Y, Zou X, Zhang L. 2016. Genetic algorithm–based method for the deadline problem in repetitive construction projects considering soft logic. J Manag Eng. 32(4):04016002. doi:10.1061/(ASCE)ME.1943-5479.0000426,
  • Hyari K, El-Rayes K. 2006. Optimal planning and scheduling for repetitive construction projects. J Manag Eng. 22(1):11–19.
  • Ioannou Photios G., and Yang I-Tung (2016). Repetitive scheduling method: requirements, modeling, and implementation. J Constr Eng Manag. 142, 04016002.
  • Ipsilandis PG. 2007. Multiobjective linear programming model for scheduling linear repetitive projects. J Constr Eng Manag. 133(6):417–424.
  • Leu SS, Hwang ST. 2001. Optimal repetitive scheduling model with shareable resource constraint. J Constr Eng Manag. 127(4):270–280.
  • Li H, Love P. 1997. Using improved genetic algorithms to facilitate time-cost optimization. J Constr Eng Manag. 123(3):233–237.
  • Li H, Zhang Q. 2009. Multiobjective optimization problems with complicated Pareto sets, MOEA/D and NSGA-IIO. IEEE Trans Evol Comput. 13(2):284–302.
  • Lim SM, Sultan ABM, Sulaiman MN, Mustapha A, Leong KY. 2017. Crossover and mutation operators of genetic algorithms. Int J Mach Learn Comput. 7(1):9–12.
  • Lucko G. 2011. Optimizing cash flows for linear schedules modeled with singularity functions by simulated annealing. J Constr Eng Manag . 137(7):523–535.
  • Maravas A, Pantouvakis J-P. 2011. Fuzzy repetitive scheduling method for projects with repeating activities. J Constr Eng Manag. 137(7):561–564.
  • Mattila K, Park A. 2003. Comparison of linear scheduling model and repetitive scheduling model. J Constr Eng Manag. 129(1):56–64.
  • Moon H, Kim H, Kamat VR, Kang L. 2015. BIM-based construction scheduling method using optimization theory for reducing activity overlaps. J Comput Civil Eng. 29(3):04014048.
  • Moselhi O, Hassanein A. 2003. Optimized scheduling of linear projects. J Constr Eng Manag. 129(6):664–673.
  • Rahbar FF, Rowings JE. 1992. Repetitive activity scheduling process. Trans Am Assn Cost Eng. 2, O.5.1-O.5.8.
  • Reda RM. 1990. RPM: repetitive project modeling. J Constr Eng Manag. 116(2):316–330. ASCE.
  • Roofigari-Esfahan N, Paez A, N.Razavi S. 2015. Location-aware scheduling and control of linear projects: introducing space-time float prisms. J Constr Eng Manag. 141(1):06014008.
  • Sacks R, Seppänen R, Priven V, Savosnick J. 2017. Construction flow index: a metric of production flow quality in construction. Constr Manag Econ. 35(1-2):45–63.
  • Senouci A, Al-Derham HR. 2008. Genetic algorithm-based multi-objective model for scheduling of linear construction projects. Adv Eng Softw J. 39(12):1023–1028.
  • Stradel O, Cacha J. 1982. Time space scheduling method. J Constr Div, ASCE. 108(3):445–457.
  • Suhail SA, Neale RH. 1994. CPM/LOB: new methodology to integrate CPM and line of balance. J Constr Eng Manag. 120(3):667–684.
  • Vanhoucke M. 2006. Work continuity constraints in project scheduling. J Constr Eng Manag . 132(1):14–25.
  • Yamin R, Harmelink D. 2001. Comparison of linear scheduling model (LSM) and critical path method (CPM). J Constr Eng Manag. 127(5):374–381.
  • Zhang L, Pan C, Zou X. 2013. Criticality comparison between the repetitive scheduling method and the network model. J Constr Eng Manag. 139(10):06013004.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.