References
- Ahmad I, Minkarah I. 1988. Questionnaire survey on bidding in construction. J Manage Eng. 4(3):229–243.
- Asian Development Bank. 2012. Annual Report 2012: advancing regional cooperation and integration in Asia and the Pacific. [accessed 2017 Dec 18]. https://www.adb.org/sites/default/files/institutional-document/33806/adb-annual-report-2012.pdf.
- Brook M. 2016. Estimating and tendering for construction work. New York: Taylor & Francis.
- Central Bank of Sri Lanka. 2016. CBSL Annual Report 2016: economic and social infrastructure. [accessed 2017 Dec 12]. https://www.cbsl.gov.lk/sites/default/files/cbslweb_documents/publications/annual_report/2016/en/7_Chapter_03.pdf.
- Christodoulou S. 2000. The science in human intuition: optimum bid markup calculation in competitive bidding environments using probabilistic neural networks. Proceedings of the 8th International Conference on Computing in Civil and Building Engineering, ASCE, Stanford, California. p. 574–579.
- Dikmen I, Birgonul MT, Gur AK. 2007. A case-based decision support tool for bid mark-up estimation of international construction projects. Automat Constr. 17(1):30–44.
- Doloi H. 2008. Application of AHP in improving construction productivity from a management perspective. Constr Manage Econ. 26(8):841–854.
- Dozzi SP, AbouRizk SM, Schroeder SL. 1996. Utility-theory model for bid markup decisions. J Constr Eng Manage. 122(2):119–124.
- Dulaimi MF, Shan HG. 2002. The factors influencing bid mark-up decisions of large- and medium-size contractors in Singapore. Constr Manage Econ. 20(7):601–610.
- Egemen M, Mohamed AN. 2007. A framework for contractors to reach strategically correct bid/no bid and mark-up size decisions. Build Environ. 42(3):1373–1385.
- Fayek A, Ghoshal I, AbouRizk S. 1999. A survey of the bidding practices of Canadian civil engineering construction contractors. Can J Civ Eng. 26(1):13–25.
- Fayek A, Young DM, Duffield CF. 1998. A survey of tendering practices in the Australian construction industry. Eng Manage J. 10(4):29–34.
- Finco. 2017. The Sri Lankan construction sector’s increased investment and development. [accessed 2018 Jan 24]. http://www.fincoengineering.com/the-sri-lankan-construction-sectors-increased-investment-and-development/.
- Flyvbjerg B. 2007. Policy and planning for large-infrastructure projects: problems, causes, cures. Environ Plan B Plan Des. 34(4):578–597.
- Hsieh H, Shannon SE. 2005. Three approaches to qualitative content analysis. Qual Health Res. 15(9):1277–1288.
- ICRA Sri Lanka. 2011. Industry report on Sri Lanka. [accessed 2017 Nov 16]. http://icralanka.com/images/pdf/Sri%20Lanka%20Construction%20-%20Sept%2015%20final.pdf.
- International Enterprise Singapore. 2016. IE Singapore Annual Report 2016–2017. [accessed 2017 Dec 10]. https://www.iesingapore.gov.sg/-/media/IE-Singapore/Files/Publications/Annual-Report/IE_AR2016_17.ashx.
- Khan S, VanWynsberghe R. 2008. Cultivating the under-mined: cross-case analysis as knowledge mobilization. Forum Qualitative Sozialforschung/Forum Qual Soc Res. 9(1):Article 34.
- Lee S, Chang L. 2004. Bid-markup determination for micro tunneling projects. Tunn Undergr Space Technol. 19(2):151–163.
- Ling FY. 2005. Global factors affecting margin-size of construction projects. J Constr Res. 06(01):91–106.
- Ling FY, Liu M. 2004. Factors considered by successful and profitable contractors in mark-up size decision in Singapore. Build Environ. 40(11):1557–1565.
- Liu M. 2001. Fuzzy neural network model for markup estimation for construction project [master’s thesis]. Singapore: Department of Building, National University of Singapore.
- Liu M, Ling YY. 2005. Modeling a Contractor’s Markup Estimation. J Constr Eng Manage. 131(4):391–399.
- Mathers NJ, Fox NJ, Hunn A. 1998. Using interviews in a research project. NHS Executive. Trent.
- McKinsey Global Institute. 2017. [accessed 2017 Dec 16]. https://www.mckinsey.com/mgi/overview.
- Meeting the demand for listed infrastructure indexes. 2017. [accessed 2018 Jan 13]. https://www.ftserussell.com/sites/default/files/meeting-the-demand-for-listed-infrastructure-indexes-final_0.pdf.
- Nagulan S. 2001. A survey of current contractors' cost estimating practices in Sri Lanka [dissertation]. Sri Lanka, Moratuwa: University of Moratuwa.
- Okeyo MP, Rambo CM, Odundo PA. 2015. Effects of delayed payment of contractors on the completion of infrastructural projects: a case of Sondu-Miriu hydropower project, Kisumu County, Kenya. Chinese Bus Rev. 14(7):325–336.
- Perera BA, Sudeha HM. 2016. A framework to select the most suitable delay analysis technique for building construction through a consideration of utility factors. Bhumi, Planning Res J. 3(2):11.
- Polat G, Bingol B. 2017. Data envelopment analysis (DEA) approach for making the bid/no bid decision: a case study in a Turkish construction contracting company. Sci Iran. 24(2):497–511.
- Sahoo P, Dash RK. 2009. Infrastructure development and economic growth in India. J Asia Pacific Econ. 14(4):351–365.
- Saunders MN, Lewis P, Thornhill A. 2009. Research methods for business students. 5th ed. India: Pearson Education; [accessed 2018 Feb 11]. https://is.vsfs.cz/el/6410/leto2014/BA_BSeBM/um/Research_Methods_for_Business_Students__5th_Edition.pdf.
- Schell C. 1992. The value of the case study as a research strategy. Manchester Bus School. 2:1–15.
- Sechrest L, Sidani S. 1995. Quantitative and qualitative methods: is there an alternative? Eval Program Plan. 18(1):77–87.
- Semaan N, Salem M. 2017. A deterministic contractor selection decision support system for competitive bidding. Eng Const Arch Manage. 24(1):61–77.
- Shash AA, Abdul-Hadi NH. 1992. Factors affecting a contractor's mark-up size decision in Saudi Arabia. Constr Manage Econ. 10(5):415–429.
- Shash AA. 1993. Factors considered in tendering decisions by top UK contractors. Constr Manage Econ. 11(2):111–118.
- Shash AA. 1998. Subcontractors’ bidding decisions. J Constr Eng Manage ASCE. 124(2):101–106.
- Statistics Canada. 2017. Canada in profile 2017. [accessed 2017 Dec 23]. http://www.statcan.gc.ca/.
- Tavakoli A, Utomo J. 1989. Bid mark-up assistant: an expert system. Cost Eng. 31(6):28.
- Tejale DS, Khandekar SD, Patil JR. 2015. Analysis of construction project cost overrun by statistical method. Int J. 3(5):349–355.
- Thakur D. 1993. Research Methodology in Social Sciences. New Delhi, Vic: DEEP & DEEP PUB.
- US Department of Commerce. 2017. Annual services report 2017. [accessed 2017 Dec 12]. https://www.commerce.gov/.
- Wilfred A, Sharafudeen M. 2015. A methodology to identify the delays and rank its causative factors in Indian construction industry. Int Res J Eng Technol (IRJET). 2(03):2214–2218.
- World Bank. 2017. Annual report 2017: advancing regional cooperation and integration in Asia and the Pa end extreme poverty – boost shared prosperitycific. [accessed 2017 Dec 14]. http://pubdocs.worldbank.org/en/908481507403754670/Annual-Report-2017-WBG.pdf.
- World Economic Forum. 2012. Strategic infrastructure – steps to prioritize and deliver infrastructure effectively and efficiently. [accessed 2017 Dec 16]. www.weforum.org.
- Xu N, Xu Q, Li Q. 2017. Construction project bidding research based on game theory and target cost pre-control management. Proceedings of the 20th International Symposium on Advancement of Construction Management and Real Estate. p. 875–882.
- Zainal Z. 2007. Case study as a research method. J Kemanusiaan. 5(1):1–6.