990
Views
5
CrossRef citations to date
0
Altmetric
Original Articles

The impact of quality management systems on construction performance in the North West of England

&

References

  • Abdirad H, Nazari A. 2015. Barriers to effective implementation of quality management systems in public design projects in Iran. Architect Eng Design Manage. 11(6):457–474.
  • Ali MC. 2014. Exploring the potential of integration quality assessment system in construction (Qlassic) With ISO 9001 Quality Management System (QMS). Int J Quality Res. 8(1):73–86.
  • Ahzahar N, Karim NA, Hassan SH, Eman J. 2011. A study of contribution factors to building failures and defects in construction industry. 2nd Int Building Control Conf. 20(1):249–255.
  • Aichouni M, Messaoudene NA, Al-Ghonamy A, Touahmia M. 2014. An empirical study of quality management systems in the Saudi construction industry. Int J Construct Manage. 14(3):181–190.
  • Almusharraf A, Whyte A. 2016. Task-based defect management: anatomical classification. Built Environ Project Asset Manage. 6(3):345–358.
  • Awny Z. 2015. The opportunity of applying models of quality management system in public construction enterprises. Studia Universitatis Moldaviae: Stiinte Exacte Si Economice. 2(82):212–216.
  • Banwell SH. 1964. The placing and management of contracts for building and civil engineering work: report of the Committee. London: HMSO.
  • Bossom AC. 1934. Building to the skies: the romance of the skyscraper. London: Studio.
  • Breja SK, Banwet DK, Iyer KC. 2011. Quality strategy for transformation: a case study. TQM J. 23(1):5–20.
  • Chiarini A. 2011. Integrating lean thinking into ISO 9001: a first guideline. Lean Six Sigma J. 2(2):96–117.
  • CITB. 2017. North West. Available: http://www.citb.co.uk/research/construction-skills-network/north-west/. Last accessed 29/08/2017.
  • Creswell JW. 2009. Research design: qualitative, quantitative and mixed method approaches. 2nd ed. Thousand Oaks, CA: Sage Publications.
  • Dadhich P, Genovese A, Kumar N, Acquaye A. 2015. Developing sustainable supply chains in the UK construction industry: a case study. Int J Production Econ. 164:271–284.
  • Egan SJ. 1998. Rethinking construction. London: Department of Trade and Industry.
  • Egan SJ. 2002. Rethinking construction 2002: achievements, next steps, getting involved’. London: The Department of Trade and Industry.
  • Georgiou J. 2010. Verification of a building defect classification system for housing. Structural Survey. 28(5):370–383.
  • Gorman JC. 2014. Team coordination and dynamics: two central issues. Curr Dir Psychol Sci. 23(5):355–360.
  • Hernad JMC, Gaya CG. 2013. Methodology for implementing Document Management Systems to support ISO 9001:2008 Quality Management Systems. Procedia Eng. 63(1):29–35.
  • HM Government. 2013. Construction 2025. Industry strategy: government and industry in partnership. London: HM Government.
  • Hoonaker P, Carayon P, Loushine T. 2010. Barriers and benefits of quality management in the construction industry: an empirical study. Total Quality Manage Business Excellence. 21(9):953–969.
  • Jingmond M, Ågren R. 2015. Unravelling causes of defects in construction. Construct Innovation. 15(2):198–218.
  • Jraisat L, Jreisat L, Hattar C. 2015. Quality in construction management: An exploratory study. Int J Qual & Reliability Mgmt. 33(7):920–941.
  • Kotane I. 2015. Evaluating the importance of financial and non-financial indicators for the evaluation of company’s performance. Manage Theory Studies Rural Business Infrastruct Develop. 37(1):80–94.
  • Kuei CH, Lu MH. 2013. Integrating quality management principles into sustainability management. Total Quality Manage Business Excellence. 24(1–2):62–78.
  • Lai HH, Lin CL. Lo, W 2016. A study on performance of three levels quality management system and the satisfaction of implementing construction quality of public construction in Taiwan. Int Conf Appl Syst Innovation. 1(1):1–4.
  • Latham SM. 1994. Constructing the team. London: HM Stationery Office.
  • Lee D, Lim T, Arditi D. 2011. An expert system for auditing quality management systems in construction. Computer-Aided Civil Infrastruct Eng. 26(8):612–631.
  • Leong T, Zakuan N, Saman M, Ariff M, Tan C. 2014. Using project performance to measure effectiveness of quality management system maintenance and practices in construction industry. Sci World J. 1(1):1–9.
  • Love PE, Edwards DJ, Irani Z, Walker DH. 2009. Project pathogens: the anatomy of omission errors in construction and resource engineering project. IEEE Trans Eng Manage. 56(3):425–435.
  • Mane PP, Patil JR. 2015. Quality management system at construction project: a questionnaire survey. Int J Eng Res Appl. 5(3):126–130.
  • Martin Z, Gatto K. 2014. Wood panelized roof subpurlin hanger construction defect assessment and load testing to establish defect tolerances. J Struct Design Construct. 20(1):401–405.
  • Mills A, Love PE, Williams P. 2009. Defect costs in residential construction. J Constr Eng Manage. 135(1):12–16.
  • Milne MJ, Adler RW. 1999. Exploring the reliability of social and environmental disclosures content analysis. Acc Auditing Accountability J. 12(2):237.
  • Mukhtar CA, Rosli MZ, Zuhairi AH, Rahman A. 2010. Quality cost in the construction industry – preliminary findings in Malaysia. J Design Built Environ. 6(1):29–43.
  • Mydin MAO, Othman NA, Sani NMD. 2014. A prospective study on building quality: relationship between workmanship quality and common building defects of low-cost construction projects. MATEC Web Conf. 17(1):01001.
  • Naoum S. 2007. Dissertation research and writing for construction students. 2nd ed. Oxford: Butterworth.
  • Pabedinskaitė A, Vitkauskas R. 2011. The implementation of quality management principles in Lithuanian enterprises. Econ Manage. 7(4):252–257.
  • Parmet A. 2013. Quality management safety professionals in construction quality control. Professional Saf. 58(5):10–11.
  • Patil BS, Ullagaddi PB, Jugati DG. 2012. An investigation of factors impelling effective and continuous improvement of Indian Construction Industries Quality Management Systems. IEEE-International Conference on Advances in Engineering, Science and Management (ICAESM-2012) 1(1):405–410.
  • Potter S. 2006. Doing postgraduate research. 2nd ed. London: Sage.
  • Rajendran S, Clarke B, Andrews R. 2012. Quality management in construction. Professional Saf. 57(11):37–42.
  • Rezaei AR, Çelik T, Baalousha Y. 2011. Performance measurement in a quality management system. Sci Iranica. 18(3):742–752.
  • Rivera-Gómez H, Gharbi A, Kenné JP. 2013. Production and quality control policies for deteriorating manufacturing system. Int J Prod Res. 51(11):3443–3462.
  • Šaulinskas L, Paliulis N, Meidutė-Kavaliauskienė I. 2013. Theoretical and practical aspects of logistic quality management system documentation development process. CE. 7(4):57–71.
  • Saunders M, Lewis P, Thornhill A. 2012. Research methods for business students. 6th ed. Essex, England: Pearson Education Limited.
  • Simon SE. 1944. The placing and management of contracts. London: HMSO.
  • Thomas N, Ekambaram P, Mohan K. 2012. Costs and benefits of ISO9000-based quality management systems to construction contractors. CEB. 8(2):23–29.
  • Wolstenholme A. 2009. Never waste a good crisis. London: Constructing Excellence.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.