690
Views
28
CrossRef citations to date
0
Altmetric
Original Articles

An application of WASPAS method in risk qualitative analysis: a case study of a road construction project in Iran

&

References

  • Badalpur M, Hafezalkotob A. 2015. Methodology based on MCDM for risk management in EPC projects: A case study of LPG storage tanks construction. J Indus Syst Eng. 8(3):1–23.
  • Bagočius V, Zavadskas KE, Turskis Z. 2013. Multi-criteria selection of a deep-water port in Klaipeda. Procedia Eng. 57:144–148.
  • Chan JHL, Chan DWM, Chan APC, Lam PTI, Yeung JFY. 2011. Developing a fuzzy risk assessment model for guaranteed maximum price and target cost contracts in construction. J. Facilities Manage. 9(1):34–51.
  • Chileshe N, Awotunde GB. 2010. An evaluation of risk impacting highway and road construction projects in Nigeria. The 8th International Conference on Construction and Real Estates Management, Brisbane, Australia, pp. 336–344. [accessed 2013 Apr 4]. http://arrow.unisa.edu.au:8081/1959.8/119503.
  • Chileshe N, Adwoa Boadua Y-F. 2012. An evaluation of risk factors impacting construction projects in Ghana. J Eng Design Tech. 10(3):306–329.
  • Costa K., et al. 2009. Contract management for International EPC projects a major qualifying project report, Submitted to the Faculty of the Worcester Polytechnic Institute.
  • Dai Q, Li J. 2016. A single DEA-based indicator for assessing the multiple negative effects of project risks. Procedia Comput Sci. 91:769–773.
  • Dorfeshan Y, Mousavi SM, Vahdani B, Siadat A. 2018. Determining project characteristics and critical path by a new approach based on modified NWRT method and risk assessment under an interval type-2 fuzzy environment. Sharif University of Technology, Articles in Press.
  • Dziadosz A, Rejment M. 2015. Risk analysis in construction project-chosen methods. Procedia Eng. 122:258–265.
  • Fontela E, Gabus A. 1974. The DEMATEL, innovative methods, Research Report 2: Structural Analysis of the World Problematique. Geneva: Battelle Institute.
  • Ghezavati V, Shojaie AA, Esfandiari H, Alavi K. 2013. Identifying, prioritization and responding to quality risks using COQ approach in construction industry. Caspian J Appl Sci Res. 2(6):21–32.
  • Guo W. 2004. Development of a framework for preliminary risk analysis in transportation projects, civil engineering. Worcester Polytechnic Institute.
  • Khameneh A-h, Taheri A, Ershadi M. 2016. Offering a framework for evaluating the performance of project risk management system. Procedia – Social Behav Sci. 226:82–90.
  • Kokangulpolat A, Dagsuyu UC. 2017. A new approximation foe risk assessment using the AHP and fine kinney methodologies. J Saf Sci. 91:24–32.
  • Kris, Nilson N. 2006. Experienced based recommendation on risk allocation for both owners and contactors. Practical Strategies for Successful International Projects, Saõ Paulo, Brazil, November 21, 2006. Pegasus.
  • Liu P, Zhang X. 2011. research on the supplier selection of a supply chain based on entropy weight and improved electre-III method. Int J Prod Res. 49(3):637–646.
  • Mahamid I. 2011. Risk matrix for factors affecting time delay in road construction projects: owners’ perspective. Eng, Constr Arch Man. 18(6):609–617.
  • Sharaf MM, Abdelwahab HT. 2015. Analysis of risk factors for highway construction projects in Egypt. J Civil Eng Architect. 9:526–533. pp
  • Molenaar KR, Diekmann JE, Ashley DB. and American Trade initiatives, Inc. 2006. Risk assessment and allocation for highway construction management Federal Highway Administration. Washington, DC, United States: U.S. Department of Transportation American Association of State Highway and Transportation Officials National Cooperative Highway Research Program.
  • Nicholas C, Gabriel Babajide A. 2010. An evaluation of risk events impacting highway and road construction projects in Nigeria, Conference Paper.
  • Odeyinka H, Lowe J, Kaka A. 2012. Regression modeling of risk impact on construction cost flow forecast. J. Financ Manage Property Construct. 17(3):203–221.
  • Oztas A, Okmen O. 2004. Risk analysis in fixed-price design–build construction project. Build. Environ. 39:229–237.
  • Perera BAKS, Dhanasinghe I, Rameezdeen R. 2009. Risk management in road construction: the case of sri lanka. Int J Strateg Property Manage. 13(2):87–102. 2009.
  • Project Management Body of Knowledge 2013. (PMBOK®) guide – 5th edition. Pennsylvania, USA: Project Management Institute, Inc.
  • Šaparauskas J, Zavadskas EK, Turskis Z. 2011. Selection of Facade's alternatives of commercial and public buildings based on multiple criteria. Int J Strateg Property Manage. 15(2):189–203.
  • Seyedhoseini SM, Hatefi MA. 2009. Two-pillar risk management (TPRM): a generic project risk management process. Scientia Iranica. Trans E, Indus Eng. 16(2):138p.
  • Shannon CE. 1948. A mathematical theory of communication. The Bell System Technical Journal. 27(3):379–432.
  • Shi Q, Zhou Y, Xiao C, Chen R, Zuo J. 2014. Delivery risk analysis within the context of program management using fuzzy logic and DEA:Achina case study. Int J Project Manage. 32(2):341–349. pp
  • Tavakolan M, Mohammadi A. 2018. Risk management workshop application: a case study of Ahwaz Urban Railway project. Int J Construct Manage. 18(3):260–274. volume pp
  • Taylan O, Bafail AO, Abdulaal RMS, Kabli MR. 2014. Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologies. Appl Soft Comput. 17:105–116.
  • Turkis Z, Zavadskas EK, Antucheviciene J, Kosareva N. 2015. A hybrid model based on fuzzy AHP and Fuzzy WASPAS for construction site selection. Int J Comput Commun Control. 10(6):113–128.
  • Tzeng G-H, Huang J-J. 2011. Multiple attribute decision making methods and applications.
  • Wang W, Wu J, Wang D. 2013. The model for risk identification based on systems engineering, International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering (QR2MSE), Chengdu, China. IEEE.
  • Wu D, Dai Q, Zhu X. 2016. Measuring the effect of project risks based on shapley value for project risk response. Procedia Comput Sci. 91:774–778. pp
  • Zavadskas E, Turskis Z, Antucheviciene J, Zakarevicius A. 2012. Optimization of weighted aggregated sum product assessment. Elektronika ir Elektrotechnika. 122:3–6.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.