A systematic review of ‘enablers of collaboration’ among the participants in construction projects

, &

References

  • Ahadzi M, Bowles G. 2004. Public–private partnerships and contract negotiations: an empirical study. Constr Manage Econ. 22(9):967–978.
  • Akintoye A, McIntosh G, Fitzgerald E. 2000. A survey of supply chain collaboration and management in the UK construction industry. Eur J Purchasing Supply Manage. 6(3):159–168.
  • Alderman N, Ivory C. 2007. Partnering in major contracts: paradox and metaphor. Int J Proj Manage. 25(4):386–393.
  • Alhazmi T, McCaffer R. 2000. Project procurement system selection model. J Constr Eng Manage. 126(3):176–184. doi: 10.1061/(Asce)0733-9364(2000)126:3(176)
  • Apa R, Sedita SR. 2017. How (do) internal capabilities and the geography of business networks shape the performance of contractors in public procurement tenders? Evidence from the construction industry. Constr Manage Econ. 35(7):1–16.
  • Ateş MA, van Raaij EM, Wynstra F. 2017. The impact of purchasing strategy-structure (mis) fit on purchasing cost and innovation performance. J Purch Supply Manage. 24:68–82.
  • Bankvall L, Bygballe LE, Dubois A, Jahre M. 2010. Interdependence in supply chains and projects in construction. Supply Chain Manage. 15(5):385–393.
  • Børve S, Ahola T, Andersen B, Aarseth W. 2017. Partnering in offshore drilling projects. Int J Manag Projects Bus. 10(1):84–108.
  • Bresnen M, Marshall N. 2000. Building partnerships: case studies of client–contractor collaboration in the UK construction industry. Construct Manage Econ. 18(7):819–832.
  • Briscoe G, Dainty A. 2005. Construction supply chain integration: an elusive goal? Supply Chain Manage. 10(4):319–326.
  • Cannon JP, Doney PM, Mullen MR, Petersen KJ. 2010. Building long-term orientation in buyer–supplier relationships: the moderating role of culture. J Oper Manage. 28(6):506–521.
  • CII. 1991. In search of partnering excellence. Bureau of Engineering Research. Construction Industry Institute, University of Texas Austin, TX.
  • Danesh D, Ryan MJ, Abbasi A. 2017. A systematic comparison of multi-criteria decision making methods for the improvement of project portfolio management in complex organisations. IJMDM. 16(3):280–320.
  • Davis PR, Jefferies M, Ke YJ. 2017. Psychological contracts: framework for relationships in construction procurement. J Constr Eng Manage. 143(8):1–10.
  • de Araújo MCB, Alencar LH, de Miranda Mota CM. 2017. Project procurement management: a structured literature review. Int J Proj Manage. 35(3):353–377.
  • de Boer L. 2017. Procedural rationality in supplier selection: outlining three heuristics for choosing selection criteria. Manage Decis. 55(1):32–56.
  • Doloi H. 2015. Key factors of relational partnerships in project management handbook on project management and scheduling. Vol. 2. Switzerland: Springer. p. 1047–1061.
  • Donato M. 2016. The influence of resource dependency on collaboration in the construction supply chain. Victoria, Australia: Victoria University.
  • Donato M, Ahsan K, Shee H. 2015. Resource dependency and collaboration in construction supply chain: literature review and development of a conceptual framework. IJPM. 8(3):344–364.
  • Du L, Tang W, Liu C, Wang S, Wang T, Shen W, Huang M, Zhou Y. 2016. Enhancing engineer–procure–construct project performance by partnering in international markets: perspective from Chinese construction companies. Int J Proj Manage. 34(1):30–43.
  • El-Adaway I, Abotaleb I, Eteifa S. 2017. Framework for multiparty relational contracting. J Leg Aff Dispute Resolut Eng Constr. 9(3):04517018.
  • Ercan T. 2019. New three-part model of innovation activity in construction companies. J Constr Eng Manage. 145(5):04019022. doi: 10.1061/(Asce)Co.1943-7862.0001645
  • Eriksson PE. 2015. Partnering in engineering projects: four dimensions of supply chain integration. J Purch Supply Manage. 21(1):38–50.
  • Ernzen JJ, Schexnayder C. 2000. One company’s experience with design/build: labor cost risk and profit potential. J Constr Eng Manage. 126(1):10–14. doi: 10.1061/(Asce)0733-9364(2000)126:1(10)
  • Ey W, Zuo J, Han S. 2014. Barriers and challenges of collaborative procurements: an exploratory study. Int J Constr Manage. 14(3):148–155.
  • Forsythe PJ. 2016. Construction service quality and satisfaction for a targeted housing customer. Eng Const Arch Manage. 23(3):323–348.
  • Gajendran T, Brewer G. 2012. Collaboration in public sector projects: unearthing the contextual challenges posed in project environments. Eng Proj Org J. 2(3):112–126.
  • Gilbert A, Sovacool BK, Johnstone P, Stirling A. 2017. Cost overruns and financial risk in the construction of nuclear power reactors: a critical appraisal. Energy Policy. 102:644–649.
  • Gopalakrishnan S, Zhang HS. 2017. Client dependence and vendor innovation: the moderating role of organizational culture. Ind Market Manage. 66:80–89.
  • Hartmann A, Caerteling J. 2010. Subcontractor procurement in construction: the interplay of price and trust. Supply Chain Manage. 15(5):354–362.
  • Hesping FH, Schiele H. 2015. Purchasing strategy development: a multi-level review. J Purch Supply Manage. 21(2):138–150.
  • Hietajärvi A-M, Aaltonen K. 2017. The formation of a collaborative project identity in an infrastructure alliance project. Constr Manage Econ. 36:1–21.
  • Hjelmbrekke H, Klakegg OJ, Lohne J. 2017. Governing value creation in construction project: a new model. Int J Managing Proj Bus. 10(1):60–83.
  • Hochrein S, Muther M, Glock CH. 2017. Strategy alignment in purchasing and supply management: a systematic literature review and research framework on the performance impact. IJISM. 11(1):44–86.
  • Hughes W, Champion R, Murdoch J. 2015. Construction contracts: law and management. New York: Routledge.
  • Jagtap M, Kamble SS, Raut RD. 2017. An empirical examination of the procurement-led supply chain in the construction industry. IJPM. 10(1):1–20.
  • Jefferies M, John Brewer G, Gajendran T. 2014. Using a case study approach to identify critical success factors for alliance contracting. Eng, Constr Arch Manage. 21(5):465–480.
  • Jelodar MB, Yiu TW, Wilkinson S. 2016. Relationship-quality judgment model for construction project procurement: a conjoint measurement. J Constr Eng Manage. 142(7):04016012. doi: 10.1061/(Asce)Co.1943-7862.0001104
  • Jelodar MB, Yiu TW, Wilkinson S. 2017. Assessing contractual relationship quality: study of judgment trends among construction industry participants. J Manage Eng. 33(1): 04016028. doi: 10.1061/(Asce)Me.1943-5479.0000461
  • Ju QQ, Ding LY, Skibniewski MJ. 2017. Optimization strategies to eliminate interface conflicts in complex supply chains of construction projects. J Civil Eng Manage. 23(6):712–726.
  • Kapogiannis G, Sherratt F. 2018. Impact of integrated collaborative technologies to form a collaborative culture in construction projects. Built Environ Proj Ass Manage. 8(1):24–38.
  • Kerkhove LP, Vanhoucke M. 2017. A parallel multi-objective scatter search for optimising incentive contract design in projects. Eur J Oper Res. 261(3):1066–1084.
  • Koolwijk JSJ, van Oel CJ, Wamelink JWF, Vrijhoef R. 2018. Collaboration and integration in project-based supply chains in the construction industry. J Manage Eng. 34(3):04018001. doi: 10.1061/(Asce)Me.1943-5479.0000592
  • Kotula M, Ho W, Dey PK, Lee CKM. 2015. Strategic sourcing supplier selection misalignment with critical success factors: findings from multiple case studies in Germany and the United Kingdom. Int J Prod Econ. 166:238–247.
  • Lam EW, Chan AP, Chan DW. 2004. Benchmarking design-build procurement systems in construction. Benchmarking. 11(3):287–302.
  • Lin X, Ho CM-F, Shen GQ. 2018. For the balance of stakeholders’ power and responsibility. Manage Decis. 56(3):550–569.
  • Ling FYY, Ong SY, Ke YJ, Wang SQ, Zou P. 2014. Drivers and barriers to adopting relational contracting practices in public projects: comparative study of Beijing and Sydney. Int J Proj Manage. 32(2):275–285.
  • Lloyd-Walker BM, Mills AJ, Walker DH. 2014. Enabling construction innovation: the role of a no-blame culture as a collaboration behavioural driver in project alliances. Constr Manage Econ. 32(3):229–245.
  • Lonsdale C, Hoque K, Kirkpatrick I, Sanderson J. 2017. Knowing the price of everything? Exploring the impact of increased procurement professional involvement on management consultancy purchasing. Ind Market Manage. 65:157–167.
  • Love PE, Irani Z, Smith J, Regan M, Liu J. 2017a. Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders. Prod Plann Control. 28:1–12.
  • Love PED, Smith J, Simpson I, Regan M, Olatunji O. 2015. Understanding the landscape of overruns in transport infrastructure projects. Environ Plann B Plann Des. 42(3):490–509.
  • Love PED, Zhou J, Edwards DJ, Irani Z, Sing CP. 2017b. Off the rails: the cost performance of infrastructure rail projects. Transport Res A. 99:14–29.
  • Mahamid I. 2017. Analysis of common factors leading to conflicts between contractors and their subcontractors in building construction projects. Aus J Multidiscipl Eng. 13:18–28.
  • Manley K, Chen L. 2017. Collaborative learning to improve the governance and performance of infrastructure projects in the construction sector. J Manage Eng. 33(5):04017030. doi: 10.1061/(Asce)Me.1943-5479.0000545
  • Mathivathanan D, Kannan D, Haq AN. 2018. Sustainable supply chain management practices in Indian automotive industry: a multi-stakeholder view. Res Conserv Recy. 128(01):284–305.
  • Matthews J, Love PED, Mewburn J, Stobaus C, Ramanayaka C. 2017. Building information modelling in construction: insights from collaboration and change management perspectives. Prod Plann Control. 29(3):202–216.
  • Melese Y, Lumbreras S, Ramos A, Stikkelman R, Herder P. 2017. Cooperation under uncertainty: assessing the value of risk sharing and determining the optimal risk-sharing rule for agents with pre-existing business and diverging risk attitudes. Int J Proj Manage. 35(3):530–540.
  • Meng X. 2019. Lean management in the context of construction supply chains. Int J Prod Res. 1–15.
  • Mills AJ, Devery A, Nalewaik A. 2016. The impact of agreed principles in the culture of alliance contracts. IJPM. 9(6):718–732.
  • Morledge R, Smith A. 2013. Building procurement. Hoboken, New Jersey: Wiley.
  • Muir RW Jr. 2015. Application of lean construction principles to highway projects: analysis of barriers to timely delivery of service. Philadelphia, PE: Drexel University.
  • Noorizadeh A, Peltokorpi A, Avkiran NK. 2019. Supplier performance evaluation in construction projects: challenges and possible solutions. J Constr Eng Manage. 145(4):04019007.
  • Olawumi TO, Chan DWM. 2019. Critical success factors for implementing building information modeling and sustainability practices in construction projects: A Delphi survey. Sustain Dev. 1–16. doi: 10.1002/sd.1925
  • Orangi A, Palaneeswaran E, Wilson J. 2011. Exploring delays in victoria-based Australian pipeline projects. Proceedings of the Twelfth East Asia-Pacific Conference on Structural Engineering and Construction (Easec12). Proc Eng. 14:874–881.
  • Ortiz JI, Pellicer E, Molenaar KR. 2019. Determining contingencies in the management of construction projects. Proj Manage J. 50(2):226–242. doi: 10.1177/8756972819827389
  • Osipova E, Eriksson PE. 2011. How procurement options influence risk management in construction projects. Constr Manage Econ. 29(11):1149–1158.
  • Ou-Yang C, Chen WL. 2017. Applying a risk assessment approach for cost analysis and decision-making: a case study for a basic design engineering project. J Chin Inst Eng. 40(5):378–390.
  • Paesbrugghe B, Rangarajan D, Sharma A, Syam N, Jha S. 2017. Purchasing-driven sales: matching sales strategies to the evolution of the purchasing function. Ind Market Manage. 62:171–184.
  • Pal R, Wang P, Liang X. 2017. The critical factors in managing relationships in international engineering, procurement, and construction (IEPC) projects of Chinese organizations. Int J Proj Manage. 35(7):1225–1237.
  • Palaneeswaran E, Kumaraswamy MM. 2000. Contractor selection for design/build projects. J Constr Eng Manage. 126(5):331–339. doi: 10.1061/(Asce)0733-9364(2000)126:5(331)
  • Palaneeswaran E, Kumaraswamy M, Zhang QX. 2001. Reforging construction supply chains: a source selection perspective. Eur J Purch Suppl Manage. 7:165–178.
  • Palmer R. 2007. The transaction‐relational continuum: conceptually elegant but empirically denied. J Bus Indus Market. 22(7):439–451.
  • Perez D, Gray J, Skitmore M. 2017. Perceptions of risk allocation methods and equitable risk distribution: a study of medium to large southeast Queensland commercial construction projects. Int J Constr Manage. 17(2):132–141.
  • Perrenoud A, Lines BC, Savicky J, Sullivan KT. 2017. Using best-value procurement to measure the impact of initial risk-management capability on qualitative construction performance. J Manage Eng. 33(5):1–8.
  • Prasad KV, Vasugi V, Venkatesan R, Bhat N. 2019. Analysis of causes of delay in Indian construction projects and mitigation measures. J Financ Manage Prop Constr. 24(1):58–78. doi: 10.1108/JFMPC-04-2018-0020
  • Rahmani F, Maqsood T, Khalfan M. 2017. An overview of construction procurement methods in Australia. Eng Const Arch Manage. 24(4):593–609.
  • Rehme J, Nordigården D, Ellström D, Chicksand D. 2016. Power in distribution channels – supplier assortment strategy for balancing power. Ind Market Manage. 54:176–187.
  • Reimann F, Shen P, Kaufmann L. 2016. Effectiveness of power use in buyer-supplier negotiations the moderating role of negotiator agreeableness. Int J Phys Dist Log Manage. 46(10):932–952.
  • Ryciuk U. 2017. Identification of factors related to trust formation in construction supply chains. 7th International Conference on Engineering, Project, and Production Management. Proc Eng. 182:627–634.
  • Sanderson M, Allen P, Gill R, Garnett E. 2018. New models of contracting in the public sector: a review of alliance contracting, prime contracting and outcome‐based contracting literature. Soc Policy Admin. 52:1060–1083. doi: 10.1111/spol.12322.
  • Sarhan S, Pasquire C, Manu E, King A. 2017. Contractual governance as a source of institutionalised waste in construction a review, implications, and road map for future research directions. Int J Manag Proj Bus. 10(3):550–577.
  • Segerstedt A, Olofsson T. 2010. Supply chains in the construction industry. Supp Chain Manage. 15(5):347–353.
  • Shan M, Hwang BG, Wong KSN. 2017. A preliminary investigation of underground residential buildings: advantages, disadvantages, and critical risks. Tunn Undergr Sp Technol. 70:19–29.
  • Sigmund Z, Radujkovic M. 2014. Risk breakdown structure for construction projects on existing buildings. Selected Papers from the 27th IPMA (International Project Management Association). 119:894–901.
  • Sullivan J, El Asmar M, Chalhoub J, Obeid H. 2017. Two decades of performance comparisons for design-build, construction manager at risk, and design-bid-build: quantitative analysis of the state of knowledge on project cost, schedule, and quality. J Constr Eng Manage. 143(6):04017009. doi: 10.1061/(Asce)Co.1943-7862.0001282
  • Sundquist V, Gadde L-E, Hulthén K. 2018. Reorganizing construction logistics for improved performance. Constr Manage Econ. 36(1):49–65.
  • Tanko BL, Abdullah F, Ramly ZM. 2017. Stakeholders assessment of constraints to project delivery in the Nigerian construction industry. Int J Built Environ Sustain. 4(1):56–62.
  • Tchokogue A, Nollet J, Robineau J. 2017. Supply’s strategic contribution: an empirical reality. J Purch Suppl Manage. 23(2):105–122.
  • Tee R, Davies A, Whyte J. 2019. Modular designs and integrating practices: managing collaboration through coordination and cooperation. Res Policy. 48(1):51–61.
  • Terrill M, Danks L. 2016. Cost overruns in transport infrastructure (No. 2016-13). Carlton, Victoria, Australia: Grattan Institute.
  • Tezel A, Aziz Z. 2017. Visual management in highways construction and maintenance in England. Eng Constr Arch Manage. 24(3):486–513.
  • Thunberg M, Persson F. 2014. Using the Scor model’s performance measurements to improve construction logistics. Prod Plann Control. 25(13–14):1065–1078.
  • Thunberg M, Rudberg M, Gustavsson TK. 2017. Categorising on-site problems. A supply chain management perspective on construction projects. Constr Innov. 17(1):90–111.
  • Vrijhoef R, Koskela L. 2000. The four roles of supply chain management in construction. Eur J Purch Suppl Manage. 6(3–4):169–178.
  • Walker DHT, Davis PR, Stevenson A. 2017. Coping with uncertainty and ambiguity through team collaboration in infrastructure projects. Int J Proj Manage. 35(2):180–190.
  • Walker DHT, Rahamani F. 2016. Delivering a water treatment plant project using a collaborative project procurement approach. Constr Innov. 16(2):158–184.
  • Wang TF, Tang WZ, Du L, Duffield CF, Wei YP. 2016. Relationships among risk management, partnering, and contractor capability in international EPC project delivery. J Manage Eng. 32(6):1–10. doi: 10.1061/(Asce)Me.1943-5479.0000459
  • Wiengarten F, Ambrose E. 2017. The role of geographical distance and its efficacy on global purchasing practices. Int J Oper Prod Manage. 37(7):865–881.
  • Winch GM. 2000. Institutional reform in British construction: partnering and private finance. Build Res Inform. 28(2):141–155. doi: 10.1080/096132100369046
  • Yazdani M, Abdi MR, Kumar N, Keshavarz-Ghorabaee M, Chan FTS. 2019. Improved decision model for evaluating risks in construction projects. J Constr Eng Manage. 145(5):04019024. doi: 10.1061/(Asce)Co.1943-7862.0001640
  • Zhang J, Li H, Olanipekun AO, Bai L. 2019. A successful delivery process of green buildings: the project owners’ view, motivation and commitment. Renew Energy. 138:651–658.
  • Zhang L, Qian Q. 2017. How mediated power affects opportunism in owner–contractor relationships: the role of risk perceptions. Int J Proj Manage. 35(3):516–529.
  • Zsidisin GA, Panelli A, Upton R. 2000. Purchasing organization involvement in risk assessments, contingency plans, and risk management: an exploratory study. Suppl Chain Manage. 5(4):187–198.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.