References
- Akinci B, Fischer M. 1998. Factors affecting contractors’ risk of cost overburden. J Manage Eng. 14(1):67–76. http://dx.doi.org/10.1061/(asce)0742-597x(1998)14:1(67).
- Alavifar AH, Motamedi S. 2014. Identification, evaluation and classification of time delay risks of construction project in Iran, International Conference on Industrial Engineering and Operations Management; Jan 7–9; IEOM, Bali, Indonesia, p. 919–929.
- Alinaitwe H, Apolot R, Tindiwensi D. 2013. Investigation into the causes of delays and cost overruns in Uganda's public sector construction projects. J Constr Dev Countries. 18(2):33–47.
- Arif F, Lodi SH, Azhar N. 2015. Factors influencing accuracy of construction project cost estimates in Pakistan: perception and reality. Int J Constr Manage. 15(1):59–70. https://doi.org/10.1080/15623599.2015.1012141.
- Assaf SA, Al-Hejji S. 2006. Causes of delay in large construction projects. Int J Project Manage. 24(4):349–357. http://dx.doi.org/10.1016/j.ijproman.2005.11.010.
- Aziz RF. 2013. Ranking of delay factors in construction projects after Egyptian revolution. Alexandria Eng J. 52(3):387–406. http://dx.doi.org/10.1016/j.aej.2013.03.002.
- Baccarini D. 1996. The concept of project complexity—a review. Int J Project Manage. 14(4):201–204.
- Bayram S, Al-Jibouri S. 2018. Cost forecasting using RCF: a case study for planning public building projects costs in Turkey. Int J Constr Manage. 18(5):405–417. Vol. https://doi.org/10.1080/15623599.2017.1333399.
- Bhargava A, Anastasopoulos PC, Labi S, Sinha KC, Mannering FL. 2010. Three-stage least-squares analysis of time and cost overruns in construction contracts. J Constr Eng Manage. 136(11):1207–1218. http://dx.doi.org/10.1061/(asce)co.1943-7862.0000225.
- Callegari C, Szklo A, Schaeffer R. 2018. Cost overruns and delays in energy megaprojects: how big is big enough? Energy Policy. 114:211–220. https://doi.org/10.1016/j.enpol.2017.11.059.
- CBI 2014. Annual Inflation Rates. Iran: Central Bank of Iran (CBI); [accessed 2014 Mar 20]. http://www.cbi.ir/.
- Chan DWM, Kumaraswamy MM. 1997. A comparative study of causes of time overruns in Hong Kong construction projects. Int J Project Manage. 15(1):55–63.
- Charkhakan MH, Heravi G. 2012. Identification of changes formation scenarios in construction projects based on changes occurrence paths analysis. Construction Research Congress (CRC2012); May 21–23; ASCE, West Lafayette, IN, USA. p. 427–436.
- Chen Q, Jin Z, Xia B, Wu P, Skitmore M. 2016. Time and cost performance of design–build projects. J Constr Eng Manage. 142(2):04015074.
- Chen GX, Shan M, Chan APC, Liu X, Zhao YQ. 2019. Investigating the causes of delay in grain bin construction projects: the case of China. Int J Constr Manage. 19(1):1–14.
- Cheng YM. 2014. An exploration into cost-influencing factors on construction projects. Int J Project Manage. 32(5):850–860. http://dx.doi.org/10.1016/j.ijproman.2013.10.003.
- Cochran WG. 1977. Sampling techniques. 3rd ed. New York: John Wiley & Sons.
- Doloi H. 2013. Cost overruns and failure in project management: understanding the roles of key stakeholders in construction projects. J Constr Eng Manage. 139(3):267–279. http://dx.doi.org/10.1061/(asce)co.1943-7862.0000621.
- Doloi H, Sawhney A, Iyer KC, Rentala S. 2012. Analysing factors affecting delays in Indian construction projects. Int J Project Manage. 30(4):479–489. http://dx.doi.org/10.1016/j.ijproman.2011.10.004.
- Enshassi A, Kumaraswamy M, Al‐Najjar J. 2010. Significant factors causing time and cost overruns in construction projects in the Gaza Strip: contractors’ perspective. Int J Constr Manage. 10(1):35–60. Vol. http://doi.org/10.1080/15623599.2010.10773137.
- Faridi AS, El‐Sayegh SM. 2006. Significant factors causing delay in the UAE construction industry. Constr Manage Econom. 24(11):1167–1176. http://dx.doi.org/10.1080/01446190600827033.
- Flyvbjerg B, Skamris Holm MK, Buhl SL. 2003. How common and how large are cost overruns in transport infrastructure projects? Transp Rev. 23(1):71–88.
- Frimpong Y, Oluwoye J, Crawford L. 2003. Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study. Int J Project Manage. 21(5):321–326. http://dx.doi.org/10.1016/s0263-7863(02)00055-8.
- Gardezi SSS, Manarvi IA, Gardezi S. 2014. Time extension factors in construction industry of Pakistan. Procedia Eng. 77:196–204. http://dx.doi.org/10.1016/j.proeng.2014.07.022.
- George D, Mallery P. 2006. SPSS for Windows step by step: a simple guide and reference. Boston: Allyn and Bacon.
- Ghoddousi P, Hosseini MR. 2012. A survey of the factors affecting the productivity of construction projects in Iran. Technol Econom Dev Econom. 18(1):99–116.
- González P, González V, Molenaar K, Orozco F. 2014. Analysis of causes of delay and time performance in construction projects. J Constr Eng Manage. 140(1):04013027. http://dx.doi.org/10.1061/(asce)co.1943-7862.0000721.
- Heravi G, Charkhakan MH. 2014. Predicting and tracing change-formation scenarios in construction projects using the DEMATEL technique. J Manage Eng. 30(6):04014010–04014028. http://dx.doi.org/10.1061/(asce)me.1943-5479.0000229.
- Heravi G, Charkhakan MH. 2015. Predicting change by evaluating the change implementation process in construction projects using event tree analysis. J Manage Eng. 31(5):04014010–04014081. http://dx.doi.org/10.1061/(asce)me.1943-5479.0000325.
- Heravi G, Eslamdoost E. 2015. Applying artificial neural networks for measuring and predicting construction-labor productivity. J Constr Eng Manage. 141(10):04015032.
- Heravi G, Jafari A. 2014. Cost of quality evaluation in mass-housing projects in developing countries. J Constr Eng Manage. 140(5):04014004.
- Heravi G, Mohammadian M. 2017. Cost overruns and delay in municipal construction projects in developing countries. AUT J Civil Eng. 1(1):31–38.
- Huo T, Ren H, Cai W, Shen GQ, Liu B, Zhu M, Wu H. 2018. Measurement and dependence analysis of cost overruns in megatransport infrastructure projects: case study in Hong Kong. J Constr Eng Manage. 144(3):05018001-1–05018001-10. https://doi.org/10.1061/(ASCE)CO.1943-7862.0001444.
- Jahren CT, Ashe AM. 1990. Predictors of cost‐overrun rates. J Constr Eng Manage. 116(3):548–552. http://dx.doi.org/10.1061/(asce)0733-9364(1990)116:3(548).
- Jørgensen M, Halkjelsvik T, Kitchenham B. 2012. How does project size affect cost estimation error? Statistical artifacts and methodological challenges. Int J Project Manage. 30(7):839–849. http://dx.doi.org/10.1016/j.ijproman.2012.01.007.
- Khabisi J, Aigbavboa C, Thwala W. 2017. Causes of cost overruns in public sector construction projects in South Africa, International Conference on Construction and Real Estate Management 2016; Sep 29–Oct 1; Edmonton, Canada. https://doi.org/10.1061/9780784480274.162.
- Khalafizadeh H, Mirhosseini RT, Tayari O. 2014. Investigating causes of delay in construction projects and presenting a solution (Case study of northwest projects of Iran). New York Sci J. 7:43–47.
- Khoshgoftar M, Bakar AHA, Osman O. 2010. Causes of delays in Iranian construction projects. Int J Constr Manage. 10(2):53–69.
- Kolltveit BJ, Grønhaug K. 2004. The importance of the early phase: the case of construction and building projects. Int J Project Manage. 22(7):545–551.
- Koushki PA, Al‐Rashid K, Kartam N. 2005. Delays and cost increases in the construction of private residential projects in Kuwait. Constr Manage Econom. 23(3):285–294. 10.1080/0144619042000326710.
- Larsen JK, Shen GQ, Lindhard SM, Brunoe TD. 2016. Factors affecting schedule delay, cost overrun, and quality level in public construction projects. J Manage Eng. 32(1):04015010–04015032. http://dx.doi.org/10.1061/(asce)me.1943-5479.0000391.
- Lo T, Fung I, Tung K. 2006. Construction delays in Hong Kong civil engineering projects. J Constr Eng Manage. 132(6):636–649. http://dx.doi.org/10.1061/(ASCE)0733-9364(2006)132:6(636).
- Love PED, Zhou J, Edwards DJ, Irani Z, Sing CP. 2017. Off the rails: the cost performance of infrastructure rail projects. Transportation Research Part A: Policy and Practice. 99:14–29. https://doi.org/10.1016/j.tra.2017.02.008.
- Mansfield NR, Ugwu OO, Doran T. 1994. Causes of delay and cost overruns in Nigerian construction projects. Int J pf Project Manage. 12(4):254–260.
- Muya M, Kaliba C, Sichombo B, Shakantu W. 2013. Cost escalation, schedule overruns and quality shortfalls on construction projects: the case of Zambia. Int J Constr Manage. 13(1):53–68. http://doi.org/10.1080/15623599.2013.10773205.
- Najafabadi EA, Pimplikar SS. 2013. The significant causes and effects of delays in Ghadir. IOSR-JMCE. 7(4):75–81.
- Park YI, Papadopoulou TC. 2012. Causes of cost overruns in transport infrastructure projects in Asia. Built Environ Project Asset Manage. 2(2):195–216.
- PMI 2017. A guide to the project management body of knowledge (PMBOK). 6th ed. Pennsylvania: Project Managemnt Institute (PMI).
- Pourrostam T, Ismail A. 2011. Significant factors causing and effects of delay in Iranian construction projects. Australian J Basic Appl Sci. 5:450–456.
- Rachid Z, Toufik B, Mohammed B. 2018. Causes of schedule delays in construction projects in Algeria. Int J Constr Manage. 1. https://doi.org/10.1080/15623599.2018.1435234.
- Rahman MDM, Lee YD, Ha DK. 2014. Investigating main causes for schedule delay in construction projects in Bangladesh. J Constr Eng Project Manage. 4(3):33–46. http://dx.doi.org/10.6106/jcepm.2014.4.3.033.
- Rosenfeld Y. 2014. Root-cause analysis of construction-cost overruns. J Constr Eng Manage. 140(1):04013039. http://dx.doi.org/10.1061/(asce)co.1943-7862.0000789.
- Samarghandi H, Tabatabaei SMM, Taabayan P, Hashemi AM, Willoughby K. 2016. Studying the reasons for delay and cost overrun in construction projects: the case of Iran. J Constr Dev Countries. 21(1):51–84.
- Sambasivan M, Soon YW. 2007. Causes and effects of delays in Malaysian construction industry. Int J Project Manage. 25(5):517–526. http://dx.doi.org/10.1016/j.ijproman.2006.11.007.
- Shehu Z, Endut IR, Akintoye A, Holt GD. 2014. Cost overrun in the Malaysian construction industry projects: a deeper insight. Int J Project Manage. 32(8):1471–1480. http://dx.doi.org/10.1016/j.ijproman.2014.04.004.
- Sinesilassie EG, Tabish SZS, Jha KN. 2018. Critical factors affecting cost performance: a case of Ethiopian public construction projects. Int J Constr Manage. 18(2):108–119. https://doi.org/10.1080/15623599.2016.1277058
- Skamris MK, Flyvbjerg B. 1997. Inaccuracy of traffic forecasts and cost estimates on large transport projects. Transp Policy. 4(3):141–146.
- Sweis GJ, Sweis R, Rumman MA, Hussein RA, Dahiya SE. 2013. Cost overruns in public construction projects: the case of Jordan. J Am Sci. 9:134–141.
- Venkateswaran CB, Murugasan R. 2017. Time delay and cost overrun of road over bridge (ROB) construction projects in India. J Constr Dev Countries. 22(suppl 1):79–96. https://doi.org/10.21315/jcdc2017.22.supp1.5.
- Zidane YJT, Andersen B. 2018. Causes of delay and their cures in major Norwegian projects. J Modern Project Manage. 5(3):80–91.