634
Views
1
CrossRef citations to date
0
Altmetric
Original Articles

Improvement measures to achieve sustainable construction labour performance

, , , &

References

  • Abdul Kadir MR, Lee WP, Jaafar MS, Sapuan SM, Ali AAA. 2005. Factors affecting construction labour productivity for Malaysian residential projects. Struct Sur. 23(1):42–54.
  • Ahmad SBS, Mazhar MU, Bruland A, Andersen BS, Langlo JA, Torp O. 2018. Labour productivity statistics: a reality check for the Norwegian construction industry. Int J Construct Manag. 1–14. doi:https://doi.org/10.1080/15623599.2018.1462443.
  • Bassioni HA, Price AD, Hassan TM. 2004. Performance measurement in construction. J Manag Eng. 20(2):42–50.
  • Beatham SM, Anumba CJ, Thorpe A, Hedges IW. 2004. KPÌs – a critical appraisal of their use in construction. Benchmarking. 11(1):93–117.
  • Buzby CM, Gerstenfeld A, Voss LE, Zeng AZ. 2002. Using lean principles to streamline the quotation process: a case study. Industr Manag Data Syst. 102:513–520.
  • Charmaz K. 2006. Constructing grounded theory: a practical guide through qualitative research. London: SagePublications Ltd.
  • Cheung SO, Suen HC, Cheung KK. 2004. PPMS: a web-based construction project performance monitoring system. Autom Construct. 13(3):361–376.
  • Creswell JW, Plano Clark VL, Gutmann ML, Hanson W. 2003. Advanced mixed methods research designs. United States of America: Sage Publications. p. 209–240.
  • Cross KF, Lynch RL. 1988. The “SMART” way to define and sustain success. Natl Prod Rev. 8:23–33.
  • Dai J, Goodrum PM, Maloney WF, Srinivasan C. 2009. Latent structures of the factors affecting construction labor productivity. J Constr Eng Manage. 135(5):397–406.
  • Dai J, Goodrum PM, Maloney WF. 2007. Analysis of craft workers' and foremen's perceptions of the factors affecting construction labour productivity. Constr Manag Econ. 25(11):1139–1152.
  • Dai J, Goodrum PM. 2011a. Differences in perspectives regarding labor productivity between spanish-and english-speaking craft workers. J Constr Eng Manage. 137(9):689–697.
  • Dai J, Goodrum PM. 2012. Generational differences on craft workers’ perceptions of the factors affecting labour productivity. Can J Civ Eng. 39(9):1018–1026.
  • Dai J, Goodrum PM. 2011b. Generational difference in craft workers’ perceptions of the factors affecting their labour productivity. Annual Conference of the Canadian Society for Civil Engineering 2011, CSCE 2011, Ottawa (ON). p. 2050–2060.
  • Dolage D, Chan P. 2013. Productivity in construction - a critical review of research. Eng: J Inst Eng, Sri Lanka. 46(4).
  • Durdyev S, Mbachu J. 2011. On-site labour productivity of New Zealand construction industry: Key constraints and improvement measures. Constr Econ Building. 11(3):18–33.
  • Egan J. 1998. Rethinking construction. London: Dept. of the Environment, Transport and Regions.
  • Elkington J. 1994. Towards the sustainable corporation: Win-win-win business strategies for sustainable development. Calif Manage Rev. 36(2):90–100.
  • EL-Mashaleh MS, Edward Minchin R, JR, O’Brien WJ. 2007. Management of construction firm performance using benchmarking. J Manage Eng. 23(1):10–17.
  • Enshassi A, Mohamed S, Mustafa ZA, Mayer PE. 2007. Factors affecting labour productivity in building projects in the Gaza strip. J Civil Eng Manage. 13(4):245–254.
  • Fleurbaey M, Blanchet D. 2013. Beyond GDP: measuring welfare and assessing sustainability. United States of America: Oxford University Press.
  • Garvin DA. 1994. Building a learning organization. Business Credit – New York. 96:19–19.
  • Ghoddousi P, Poorafshar O, Chileshe N, Hosseini MR. 2015. Labour productivity in Iranian construction projects perceptions of chief executive officers. Int J Productivity Perf Manag. 64(6):811–830.
  • Giles T, King L, DE Lacey S. 2013. The timing of the literature review in grounded theory research: an open mind versus an empty head. Ans Adv Nurs Sci. 36(2):E29–E40.
  • Halachmi A. 2002. Performance measurement and government productivity. Work Study. 51(2):63–73.
  • Hall TJ. 2011. The triple bottom line: what is it and how does it work? Indiana Business Rev. 86:4.
  • Helliwell JF, Huang H, Wang S. 2017. The social foundations of world happiness. World Happiness Report 2017, 8.
  • Horta IM, Camanho AS, DA Costa JM. 2010. Performance assessment of construction companies integrating key performance indicators and data envelopment analysis. J Constr Eng Manage. 136(5):581–594.
  • Horta IM, Camanho AS, DA Costa JM. 2012. Performance assessment of construction companies: A study of factors promoting financial soundness and innovation in the industry. Int J Prod Econ. 137(1):84–93.
  • Jarkas AM, Al Balushi RA, Raveendranath PK. 2015. Determinants of construction labour productivity in Oman. Int J Constr Manag. 15(4):332–344.
  • Jarkas AM, Bitar CG. 2012. Factors affecting construction labor productivity in Kuwait. J Constr Eng Manage. 138(7):811–820.
  • Jarkas AM, Younes JH. 2014. Principle factors contributing to construction delays in the State of Qatar. Int J Constr Project Manag. 6:39.
  • Jarkas AM. 2015. Factors influencing labour productivity in Bahrain’s construction industry. Int J Constr Manag. 15(1):94–108.
  • Kaplan RS, Nortan DP. 1992. The balanced scorecard-measures that drive performances. Harvard Business Rev. 70:71–79.
  • Keegan DP, Eiler RG, Jones CR. 1989. Are your performance measures obsolete? Strat Finance. 70:45.
  • Khahro SH, Ali TH, Memon NA, Memon ZA. 2016. Improving labour productivity: An attribute case study of building sector projects in Pakistan. Int J Appl Eng Res. 11:11121–11125.
  • Kim S-Y, Huynh T-A. 2008. Improving project management performance of large contractors using benchmarking approach. Int J Project Manag. 26:758–769.
  • Koskela L. 2000. An exploration towards a production theory and its application to construction. Finland: VTT Technical Research Centre of Finland.
  • Lam S, Tang C. 2003. Motivation of survey employees in construction projects. J Geospatial Eng. 5:61–66.
  • Latham M. 1994. Constructing the team. London: HMSO.
  • Lempert LB. 2007. Asking questions of the data: memo writing in the grounded. (Vol. 1). London, UK: Sage Publications. p. 245–264.
  • Mahamid I. 2013. Contractors perspective toward factors affecting labor productivity in building construction. Eng Const Arch Man. 20(5):446–460.
  • March JG, Sutton RI. 1997. Crossroads—organizational performance as a dependent variable. Org Sci. 8(6):698–706.
  • Maskell BH. 1991. Performance measurement for world class manufacturing: a model for American companies. New York, USA: Productivity Press.
  • Mcdonough W, Braungart M. 2002. Design for the triple top line: new tools for sustainable commerce. Corp Environ Strat. 9(3):251–258.
  • Mcnally HE, Havers JA. 1967. Labor productivity in the construction industry. J Constr Div. 93:1–12.
  • Mctague B, Jergeas G. 2002. Productivity improvements on Alberta major construction projects: Phase I-Back to basics. Alberta, Canada: Alberta Economic Development.
  • Micheli P, Mari L. 2014. The theory and practice of performance measurement. Manag Account Res. 25(2):147–156.
  • Misni F, Lee LS. 2017. A review on strategic, tactical and operational decision planning in reverse logistics of green supply chain network design. JCC. 05(08):83.
  • Mirsky R, Songer AD. 2009. Beyond sustainability: The contractor's role in regenerative system design. Paper presented at the Construction Research Congress 2009: Building a Sustainable Future.
  • Naoum SG. 2016. Factors influencing labor productivity on construction sites: A state-of-the-art literature review and a survey. Int J Productivity Perf Manag. 65(3):401–421.
  • Navon R, Sacks R. 2007. Assessing research issues in automated project performance control (APPC). Automation Constr. 16(4):474–484.
  • Neely A, Adams C. 2001. The performance prism perspective. J Cost Manag. 15:7–15.
  • Neely A, Bourne M. 2000. Why measurement initiatives fail. Measuring Business Excellence. 4(4):3–7.
  • Neely A, Gregory M, Platts K. 2005. Performance measurement system design: A literature review and research agenda. Int J Oper Prod Manag. 25:1228–1263.
  • Norway S. 2018. Construction, structural business statistics [Online]. Norway. [accessed 2018 Feb 15]. https://www.ssb.no/en/bygg-bolig-og-eiendom/statistikker/stbygganl
  • OECD 2010. Construction industry. OECD J Competition Law Policy.
  • OECD 2017a. OECD Compendium of Productivity Indicators 2017. Paris: OECD Publishing.
  • OECD 2017b. Organization for economic co-operation and development [Online]. [Accessed 2017 Jun 01]. https://data.oecd.org/natincome/value-added-by-activity.htm
  • Ostroff C. 1992. The relationship between satisfaction, attitudes, and performance: an organizational level analysis. J Appl Psychol. 77(6):963.
  • Panas A, Pantouvakis J. 2010. Evaluating research methodology in construction productivity studies. Built Hum Environ Rev. 3:63–85.
  • Patterson M, Warr P, West M. 2004. Organizational climate and company productivity: the role of employee affect and employee level. J Occup Organ Psychol. 77(2):193–216.
  • Pilateris P, Mccabe B. 2003. Contractor financial evaluation model (CFEM). Can J Civ Eng. 30(3):487–499.
  • Pillai AS, Joshi A, Rao KS. 2002. Performance measurement of R&D projects in a multi-project, concurrent engineering environment. Int J Project Manag. 20:165–177.
  • Popper K. 1934. The Logic of Scientific Discovery (London: Hutchinson, 1959). However many white swans we count, Popper argues, we cannot with certainty say that all swans are white. But if we see one black swan, we can confidently say that “not all swans are white.
  • Rankin J, Fayek AR, Meade G, Haas C, Manseau A. 2008. Initial metrics and pilot program results for measuring the performance of the Canadian construction industry. Can J Civ Eng. 35(9):894–907.
  • Rognlie M. 2016. Deciphering the fall and rise in the net capital share: accumulation or scarcity?. Brookings Pap Econ Act. 2015(1):1–69.
  • Rojas EM, Aramvareekul P. 2003. Labor productivity drivers and opportunities in the construction industry. J Manag Eng. 19(2):78–82.
  • Savitz A. 2013. The triple bottom line: how today's best-run companies are achieving economic, social and environmental success-and how you can too. John Wiley & Sons.
  • Schneider B, Hanges PJ, Smith DB, Salvaggio AN. 2003. Which comes first: employee attitudes or organizational financial and market performance? J Appl Psychol. 88(5):836.
  • Singh H, Motwani J, Kumar A. 2000. A review and analysis of the state‐of‐the‐art research on productivity measurement. Ind Manag Data Syst. 100:234–241.
  • Skibniewski MJ, Ghosh S. 2009. Determination of key performance indicators with enterprise resource planning systems in engineering construction firms. J Constr Eng Manag.
  • Stern S, Wares A, Orzell S, O’Sullivan P. 2015. Social progress index 2014 methodological report. [accessed April], 4, p. 691–705.
  • Stiglitz J, Sen A, Fitoussi J. P. 2009. The measurement of economic performance and social progress revisited. Reflections and overview. Commission on the Measurement of Economic Performance and Social Progress, Paris.
  • Tangen S. 2005. Demystifying productivity and performance. Int J Productivity Perf Manag. 54(1):34–46.
  • Thomas HR, Maloney WF, Horner RMW, Smith GR, Handa VK, Sanders SR. 1990. Modeling construction labor productivity. J Constr Eng Manag. 116(4):705–726.
  • Toor SUR, Ogunlana SO. 2010. Beyond the ‘iron triangle’: stakeholder perception of key performance indicators (KPI) for large-scale public sector development projects. Int J Project Manag. 28(3):228–236.
  • White GP. 1996. A survey and taxonomy of strategy-related performance measures for manufacturing. Int J Operations Prod Manag. 16:42–61.
  • Womack JP, Jones DT. 1996. Lean thinking. New York, USA: Simon and Schuster.
  • Yang H, Yeung JF, Chan AP, Chiang Y, Chan DW. 2010. A critical review of performance measurement in construction. J Facilities Manag. 8(4):269–284.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.