References
- [AIA] American Institute of Architects. 2007b. Integrated Project Delivery: A Guide. American Institute of Architects (Vol. 1); [accessed 2017 Dec 18].
- [AIA] American Institute of Architects. 2007a. Integrated Project Delivery: A Working Definition. American Institute of Architects (Vol. 2); [accessed 2017 Dec 12]. http://www.csa.com/partners/viewrecord.php?requester=gs&collection=TRD&recid=201004B90300712MB
- [AIA] American Institute of Architects. 2014. Integrated Project Delivery: An Updated Working Definition. American Institute of Architects (Vol. 3); [accessed 2017 Dec 01]. http://www.aiacc.org/wp-content/uploads/2014/07/AIACC_IPD.pdf
- Ahuja R, Sawhney A, Jain M, Arif M, Rakshit S. 2018. Factors influencing BIM adoption in emerging markets – the case of India. Int J Constr Manage. 1–12. DOI: 10.1080/15623599.2018.1462445
- Becerik-Gerber B, Asce AM, Kensek K. 2010. Building information modelling in architecture, engineering, and construction: Emerging research directions and trends. J Prof Issues Eng Educ Pract. 136(3):139–147.
- Belfitt RJ, Sexton M, Schweber L, Handcock B. 2011. Sustainable Procurement – Challenges for Construction Practice. Proceedings of the TSBE EngD Conference.
- Bolpagni M. 2013. The implementation of BIM within the public procurement A model-based approach for the construction industry. 1st ed. Espoo: Julikaisija Utgitgivare Publisher.
- British Standards Institution. 2013. PAS 1192-2:2013 Incorporating Corrigendum No. 1 Specification for information management for the capital/delivery phase of construction projects using building information modelling. 1st ed. London: BSI Standards Limited.
- [CIPS] Chartered Institute of Purchasing & Supply. 2011. CIPS Sustainable Procurement. Annual Report, 1–29; [accessed 2017 Nov 27]. https://www.cips.org/Documents/About%20CIPS/1/CIPS_Annual_Accounts_2010-11.pdf
- Chong HY, Lee CY, Wang X. 2017. A mixed review of the adoption of Building Information Modelling (BIM) for sustainability. J Cleaner Prod. 142:4114–4126.
- Creswell JW, Plano-Clark VL. 2007. Choosing a mixed methods design. In Designing and conducting mixed methods research. Thousand Oaks, CA: Sage.
- Department for Environment Food & Rural Affairs. 2013. London 2012 olympic and paralympic games. The legacy: Sustainable procurement for construction projects. A guide. 1st ed. London: National Archives, Kew
- Gunawardhane K, Karunasena G. 2015. Conceptual framework for sustainable public procurement process in construction industry. Proceeding of the 4th world construction symposium Sustainable Development in Built Environment: Green Growth & Innovative Directions; Colombo: Building Economics and Management Research Unit (BEMRU), Department of Building Economics, University of Moratuwa. p.192–202.
- Holzer D. 2015. BIM for procurement - procuring for BIM. In R. H. Crawford & A. Stephan, eds. Living and Learning: Research for a Better Built Environment: Proceedings of the 49th International Conference of the Architectural Science Association 2015; Melbourne. P. 237–246.
- Howard W, Ashcraft J. 2011. Negotiating an integrated project delivery agreement. The Construction Lawyer. 31(3):1–34.
- Hui WS, Othman R, Hj Omar N, Abdul Rahman R, Husna Haron N. 2011. Procurement issues in Malaysia. Int J Public Sec Manag. 24(6):567–593.
- Jayasena HS, Senevirathna NS. 2012. Adaptability of integrated project delivery in a construction industry. Proceedings of the World Construction Symposium 2012: Global Challenges in Construction Industry; Colombo. p. 188–195.
- Jayasena HS, Weddikkara C. 2013. Assessing the BIM maturity in a BIM infant industry. Proceedings of the Second World Construction Symposium 2013: Social-Economic Sustainability in Construction; Colombo. p. 62–69.
- Joseph A, Jayasena H. 2008. Impediments to the development of design and build procurement system in Sri Lanka. CIB International Conference on Building Education and Research, p. 286–287. Sri Lanka: Heritance Kandalama.
- Kothari CR. 2004. Research methodology: Methods & techniques. 2nd ed. New Delhi: New Age International PVT.
- Kumar R. 2011. Research methodology step by step guide for beginners. 3rd ed. New Dilhi: Sage Publications Inc.
- Liu S, Meng X, Tam C. 2015. Building information modelling based building design optimization for sustainability. Energ Buildings. 105:139–153.
- Liu T, Hsieh T. 2011. Bim-Based Government Procurement System- the Likely Development in Taiwan. IAARC Publications, Proceedings of the 28th ISARC. Seoul, Korea; 29 June–2 July 2011:758–763.
- Ma Z, Ma J. 2017. Formulating the application functional requirements of a BIM-based collaboration platform to support IPD projects. KSCE J Civ Eng. 21(6):2011–2026. DOI: 10.1007/s12205-017-0875-4
- Marzuki PF, Abduh M, Driejana R. 2017. The sustainable infrastructure through the construction supply chain carbon footprint approach. Procedia Eng. 171:312–322.
- Molavi J, Barral DL. 2016. A construction procurement method to achieve sustainability in modular construction. Procedia Eng. 145:1362–1369.
- Nagalingam G, Jayasena HS, Ranadewa K. 2013. Building Information Modelling and future Quantity Surveyor’s practice in Sri Lankan construction industry. Proceedings of the Second World Construction Symposium 2013: Social-Economic Sustainability in Construction; Colombo; p. 81–92.
- Naoum SG, Egbu C. 2015. Critical review of procurement method research in construction journals. Procedia Econ Financ. 21(5):6–13.
- Naoum SG, Egbu C. 2016. Modern selection criteria for procurement methods in construction A state-of-the-art literature review and a survey. Int J Managing Projects Bus. 9(2):309–336.
- Office of Government Commerce. 2007. Achieving excellence in construction procurement guide 11: Sustainability. Norfolk: Office of Government Commerce.
- Oyegoke AS, Dickinson M, Khalfan MMA, Mcdermott P, Rowlinson S. 2009. Construction project procurement routes: an in-depth critique. Int J Managing Projects in Bus. 2(3):338–354.
- Piyasena T. 2015. Challenges and Measures of Sustainable Building Procurement in Sri Lankan Construction Industry [Unpublished B.Sc. Dissertation]. Sri Lanka: University of Moratuwa.
- Rameezdeen R, de Silva S. 2002. Trends in construction procurement systems in Sri Lanka. Built-Environ Sri Lanka. 2(2):2–9.
- [RICS] Royal Institute of British Architects. 2013. RIBA Plan of Work 2013 overview. (D. Sinclair, Ed.). London: RIBA Publishing.
- [RICS] Royal Institute of Chartered Surveyors. 2010. Contracts in use: A survey of building contracts in use during 2010. London: RIBA Publishing.
- Ruparathna RJ, Hewage K. 2015. Sustainable procurement in the Canadian construction industry: challenges and benefits. Can J Civ Eng. 42(6):417–426.
- Ruparathna RJ, Hewage K. 2015. Sustainable procurement in the Canadian construction industry: current practices, drivers and opportunities. J Cleaner Prod. 109:305–314.
- Ruparathna RJ. 2013. Energy based procurement framework to improve sustainability performance in construction [doctoral dissertation]. Canada: University of British Columbia.
- Singh MM, Sawhney A, Borrmann A. 2019. Integrating rules of modular coordination to improve model authoring in BIM. Int J Constr Manage. 19(1):15–31.
- Sourani AI. 2008. Realising Sustainable Construction in Procurement Strategies [doctoral dissertation]. United Kingdom: Loughborough University
- Succar B. 2009. Building information modelling maturity matrix. In: Underwoord J, Isikdag U, editors. Handbook of Research on Building Information Modeling and Construction Informatics: Concepts and Technologies. Hershey: IGI Global:65–103.
- Sustainable Procurement Task Force. 2006. Procuring the Future. 1st ed. London: Department for Environment, Food & Rural Affairs.
- World Commission on Environment and Development. 1987. Our Common Future. 1st ed. London: Oxford University Press.