Delay causes in Kazakhstan’s construction projects and remedial measures

, , &

References

  • Abd El-Razek ME, Bassioni HA, Mobarak AM. 2008. Causes of delay in building construction projects in Egypt. J Constr Eng Manage. 134(11):831–841.
  • Abdelhadi Y, Dulaimi MF, Bajracharya A. 2018. Factors influencing the selection of delay analysis methods in construction projects in UAE. Int J Construct Manag. 19(4):329–340.
  • Abdul-Rahman H, Berawi MA, Berawi AR, Mohamed O, Othman M, Yahya IA. 2006. Delay mitigation in the Malaysian construction industry. J Constr Eng Manage. 132(2):125–133.
  • Aibinu AA, Odeyinka HA. 2006. Construction delays and their causative factors in Nigeria. J Constr Eng Manage. 132(7):667–677.
  • Al-Fadhali N, Zainal R, Kasim N, Dodo M, Soon NK, Hasaballah A. 2019. The desirability of Integrated Influential Factors (IIFs) Model of internal stakeholder as a panacea to project completion delay in Yemen. Int J Constr Manage. 19(2):128–136.
  • Al-Khalil MI, Al-Ghafly MA. 1999. Important causes of delay in public utility projects in Saudi Arabia. Construct Manag Econ. 17(5):647–655.
  • Al-Kharashi A, Skitmore M. 2009. Causes of delays in Saudi Arabian public sector construction projects. Construct Manag Econ. 27(1):3–23.
  • Al-Momani AH. 2000. Construction delay: a quantitative analysis. Int J Proj Manag. 18(1):51–59.
  • Alaghbari W, Razali A, Kadir M, Salim A. 2007. The significant factors causing delay of building construction projects in Malaysia. Eng Construct Architect Manag. 14(2):192–206.
  • Arditi D, Nayak S, Damci A. 2017. Effect of organizational culture on delay in construction. Int J Proj Manag. 35(2):136–147.
  • Assaf SA, Al-Hejji S. 2006. Causes of delay in large construction projects. Int J Proj Manag. 24(4):349–357.
  • Bajjou MS, Anas C. 2018. Empirical study of schedule delay in Moroccan construction projects. Int J Construct Manag. 1–18. DOI: 10.1080/15623599.2018.1484859
  • Chan DWM, Kumaraswamy MM. 1997. A comparative study of causes of time overruns in Hong Kong construction projects. Int J Proj Manag. 15(1):55–63.
  • Chen GX, Shan M, Chan APC, Liu X, Zhao YQ. 2019. Investigating the causes of delay in grain bin construction projects: the case of China. Int J Construct Manag. 19(1):1–14.
  • Crosthwaite D. 2000. The global construction market: a cross-sectional analysis. Constr Manag Econ. 18(5):619–627.
  • Doloi H, Sawhney A, Iyer KC, Rentala S. 2012. Analysing factors affecting delays in Indian construction projects. Int J Proj Manag. 30(4):479–489.
  • Fallahnejad MH. 2013. Delay causes in Iran gas pipeline projects. Int J Proj Manag. 31(1):136–146.
  • Faridi AS, El-Sayegh SM. 2006. Significant factors causing delay in the UAE construction industry. Constr Manag Econ. 24(11):1167–1176.
  • Field A. 2005. Discovering statistics using SPSS. Los Angeles, CA: SAGE Publications.
  • Fikri Mohamed S, Anumba CJ. 2006. Potential for improving site management practices through knowledge management. Constr Innovat. 6(4):232–249.
  • Frimpong Y, Oluwoye J. 2003. Significant factors causing delay and cost overruns in construction of groundwater projects in Ghana. J Construct Res. 04(02):175–187.
  • Gunduz M, Nielsen Y, Ozdemir M. 2015. Fuzzy assessment model to estimate the probability of delay in Turkish construction projects. J Manage Eng. 31(4):04014055.
  • Horta IM, Camanho AS, Jill J, Geraint J. 2013. Performance trends in the construction industry worldwide: an overview of the turn of the century. J Prod Anal. 39(1):89–99.
  • Iyer KC, Jha KN. 2005. Factors affecting cost performance: evidence from Indian construction projects. Int J Proj Manag. 23(4):283–295.
  • Kaliba C, Muya M, Mumba K. 2009. Cost escalation and schedule delays in road construction projects in Zambia. Int J Proj Manag. 27(5):522–531.
  • Kazaz A, Ulubeyli S, Tuncbilekli NA. 2012. Causes of delays in construction projects in Turkey. J Civil Eng Manag. 18(3):426–435.
  • Koushki PA, Al‐Rashid K, Kartam N. 2005. Delays and cost increases in the construction of private residential projects in Kuwait. Constr Manag Econ. 23(3):285–294.
  • Lambla V. 2016. Construction sector in Kazakhstan 2016. Market Analysis and Development Forecasts for 2016-2021. PMR Market Insight.
  • Lo TY, Fung IWH, Tung K. 2006. Construction delays in Hong Kong civil engineering projects. J Constr Eng Manage. 132(6):636–649.
  • Mahamid I, Bruland A, Dmaidi N. 2012. Causes of delay in road construction projects. J Manage Eng. 28(3):300–310.
  • Odeh AM, Battaineh HT. 2002. Causes of construction delay: traditional contracts. Int J Proj Manag. 20(1):67–73.
  • Odeyinka H, Oladapo A. 1997. The causes and effects of construction delays on completion cost of housing project in Nigeria. J Financial Manag Property Constr. 2(3):31–44.
  • Rachid Z, Toufik B, Mohammed B. 2018. Causes of schedule delays in construction projects in Algeria. Int J Constr Manag. 19(5):371–381.
  • Ruqaishi M, Bashir HA. 2015. Causes of delay in construction projects in the oil and gas industry in the gulf cooperation council countries: a case study. J Manage Eng. 31(3):05014017.
  • Sambasivan M, Soon YW. 2007. Causes and effects of delays in Malaysian construction industry. Int J Proj Manag. 25(5):517–526.
  • Shi JJ, Cheung SO. 2001. Construction delay computation method. J Constr Eng Manag. 127(1):60–65.
  • Statistia: Global Construction Expenditures 2014-2025. [Accessed 2019 Jan 05]. https://www.statista.com/statistics/788128/construction-spending-worldwide/.
  • Sweis G, Sweis R, Abu Hammad A, Shboul A. 2008. Delays in construction projects: The case of Jordan. Int J Proj Manag. 26(6):665–674.
  • Toor S-U-R, Ogunlana SO. 2008. Problems causing delays in major construction projects in Thailand. Constr Man Econ. 26(4):395–408.
  • Williams T. 2003. Assessing extension of time delays on major projects. Int J Proj Manag. 21(1):19–26.
  • Yang J-B, Ou S-F. 2008. Using structural equation modeling to analyze relationships among key causes of delay in construction. Can J Civ Eng. 35(4):321–332.
  • Yang J-B, Wei P-R. 2010. Causes of delay in the planning and design phases for construction projects. J Archit Eng. 16(2):80–83.
  • Zidane YJT, Andersen B. 2018. Causes of delay and their cures in major Norwegian projects. J Modern Proj Manag. 5(3):80–91.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.