482
Views
11
CrossRef citations to date
0
Altmetric
Original Articles

Assessing lean construction conformance amongst the second-grade Jordanian construction contractors

&

References

  • Abbasi GY, Abdel-Jaber MS, Abu-Khadejeh A. 2005. Risk analysis for the major factors affecting the construction industry in Jordan. Emirates J Eng Res. 10(1):41–47.
  • Abdel-Razek RH, Abdel-Hamid M. 2007. Labor productivity: benchmarking and variability in Egyptian projects. Int J Project Manage. 25(2):189–197.
  • Abduh M, Roza HA. 2006. Indonesian contractors' readiness towards lean construction. Paper presented at the 14th Annual Conference of the International Group for Lean Construction; 25–27 Jul; Santiago, Chile.
  • Agbulos A, Mohamed Y, Al-Hussein M, AbouRizk S, Roesch J. 2006. Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews. J Construct Eng Manage. 132(3):291–299.
  • Al-Aomar R. 2012. Analysis of lean construction practices at Abu Dhabi construction industry. Lean Construct J. 105–121.
  • Al-Momani AH. 1996. Construction cost prediction for public school buildings in Jordan. Construct Manage Econ. 14(4):311–317.
  • Al-Momani AH. 2000. Construction delay: a quantitative analysis. Int J Project Manage. 18(1):51–59.
  • Al-Rifai J, Amoudi O. 2016. Understanding the key factors of construction waste in Jordan. Jordan J Civ Eng. 10(2):244–251.
  • Al-Sudairi AA. 2007. Evaluating the effect of construction process characteristics to the applicability of lean principles. Construct Innov. 7(1):99–121.
  • Alarcón LF, Diethelm S, Rojo O, Calderon R. 2005. Assessing the impacts of implementing lean construction. Paper presented at the 13th Annual Conference of the International Group for Lean Construction; 19–21 Jul; Sydney, Australia.
  • Alinaitwe HM. 2009. Prioritising lean construction barriers in Uganda’s construction industry. J Construct Dev Countries. 14(1):15–30.
  • Alkilani SZ, Jupp J, Sawhney A. 2013. Issues of construction health and safety in developing countries: a case of Jordan. Construct Econ Bulid. 13(3):141–156.
  • AlSehaimi AO, Fazenda PT, Koskela L. 2014. Improving construction management practice with the Last Planner System: a case study. Eng Construct Arch Manage. 21(1):51–64.
  • Alves TCL, Milberg C, Walsh KD. 2012. Exploring lean construction practice, research, and education. Eng Construct Arch Manage. 19(5):512–525.
  • Assbeihat JM. 2005. Contractors’ actual contribution during projects’ implementation: Jordanian construction sector. Dirasat: Eng Sci. 32(1):1–7.
  • Attar GA, Sweis RJ. 2009. The relationship between information technology adoption and job satisfaction in contracting companies in Jordan. J Inform Technol Construct. 15(3):44–63.
  • Awada MA, Lakkis BS, Doughan AR, Hamzeh FR. 2016. Influence of lean concepts on safety in the Lebanese construction industry. Paper presented at the 24th Annual Conference of the International Group for Lean Construction; Jul 20–22; Boston, USA.
  • Ayalew T, Dakhli Z, Lafhaj Z. 2016. The future of lean construction in Ethiopian construction industry. Int J Eng Res Technol. 5(2), 107–113.
  • Aziz RF, Hafez SM. 2013. Applying lean thinking in construction and performance improvement. Alexandria Eng J. 52(4):679–695.
  • Ballard G, Howell G. 2003. Lean project management. Build Res Inform. 31(2):119–133.
  • Bertelsen S, Koskela L. 2004. Construction beyond lean: a new understanding of construction management. Paper presented at the 12th Annual Conference in the International Group for Lean Construction; Aug 3–5; Helsingør, Denmark.
  • Bortolazza RC, Costa DB, Formoso CF. 2005. A quantitative analysis of the implementation of the Last Planner System in Brazil. Paper presented at the 13th International Group for Lean Construction Conference: Proceedings; Jul 19–21; Sydney, Australia.
  • Common G, Johansen E, Greenwood D. 2000. A survey of the take-up of lean concepts among UK construction companies. Paper presented at the 8th Annual Conference of the International Group for Lean Construction; Jul 17–19; Brigthon, UK.
  • Conte ASI. 1998. Last planner, look ahead, PPC: a driver to the site operations. Paper presented at the 6th Annual Conference of the International Group for Lean Construction; Aug 13–15; Guarujá, Brazil.
  • Conte ASI, Gransberg D. 2001. Lean construction: from theory to practice (CS101). Pittsburgh, Pennsylvania: AACE International Transactions.
  • Cronbach LJ. 1951. Coefficient alpha and the internal structure of tests. Psychometrika. 16(3):297–334.
  • Department of Statistics. 2017. Jordan in Figures 2016 [retrieved 13 January 2018]. http://dosweb.dos.gov.jo/wp-content/uploads/2017/11/JordanInFigures_2016.pdf.
  • Diekmann JE, Balonick J, Krewedl M, Troendle L. 2003. Measuring lean conformance. Paper presented at the 11th Annual Conference of the International Group for Lean Construction; Jul 22–24; Virginia, USA.
  • Diekmann JE, Balonick J, Stewart T, Won S. 2004. Application of lean manufacturing principles to construction. Boulder (CO): Construction Industry Institute; p. 191.
  • Ebbs PJ, Sexton P, Greensmith DG, Clare BG, Gibson V, Turner R. 2015. Lean construction theory and practice: an Irish perspective. Paper presented at the 23rd Annual Conference of the International Group for Lean Construction; Jul 29–31; Perth, Australia.
  • Egan J. 1998. Rethinking construction, construction task force report for department of the environment, transport and the regions. London: HMSO.
  • El-Mashaleh MS, Al-Smadi BM, Hyari KH, Rababeh SM. 2010. Safety management in the Jordanian construction industry. Jordan J Civ Eng. 4(1):47–54.
  • Enshassi A, Abu Zaiter M. 2014. Implementation of lean tools on safety in construction projects in Palestine. Paper presented at the 22nd Annual Conference of the International Group for Lean Construction; Jun 25–27; Oslo, Norway.
  • Erik Eriksson P. 2010. Improving construction supply chain collaboration and performance: a lean construction pilot project. Supp Chain Manage. 15(5):394–403.
  • Erol H, Dikmen I, Birgonul MT. 2016. Measuring the impact of lean construction practices on project duration and variability: a simulation-based study on residential buildings. J Civ Eng Manage. 23(2):241–251.
  • Farrar JM, AbouRizk SM, Mao X. 2004. Generic implementation of lean concepts in simulation models. Lean Construct J. 1(1):1–23.
  • Gao S, Low SP. 2014. Lean construction management. Singapore: Springer.
  • Hair JF, Black WC, Babin BJ, Anderson RE, Tatham RL. 1998. Multivariate data analysis. Vol. 5. Upper Saddle River (NJ): Prentice Hall.
  • Hamzeh F, Kallassy J, Lahoud M, Azar R. 2016. The first extensive implementation of lean and LPS in Lebanon: results and reflections. Paper presented at the 24th Annual Conference of the International Group for Lean Construction; Jul 20–22; Boston, USA.
  • Hanna A, Wodalski M, Whited G. 2010. Applying lean techniques in delivery of transportation infrastructure projects. Paper presented at the 18th Annual Conference of the International Group for Lean Construction; Haifa. p. 609–619.
  • Inokuma A, Aoki M, Shimura M, Nagayama D, Koizumi C. 2014. Absence in the provenance? Lean construction and its applicability in Japan. Paper presented at the 22nd Annual Conference of the International Group for Lean Construction; Jun 25–27; Oslo, Norway.
  • JCCA 2018. J. C. C. A. Find Contractor [retrieved 12 March 2018]. http://www.jcca.org.jo/FindContractor.aspx?lang=ar.
  • Johansen E, Glimmerveen H, Vrijhoef R. 2002. Understanding lean construction and how it penetrates the industry – a comparison of the dissemination of lean. Paper presented at the 10th Annual Conference of the International Group for Lean Construction; Aug 6–8; Gramado, Brazil.
  • Johansen E, Walter L. 2007. Lean construction: prospects for the German construction industry. Lean Construct J. 3(1):19–32.
  • Jørgensen B, Emmitt S. 2008. Lost in transition: the transfer of lean manufacturing to construction. Eng Construct Arch Manage. 15(4):383–398.
  • Ko CH. 2010. Application of lean production system in the construction industry: an empirical study. J Eng Appl Sci. 5(2):71–77.
  • Koskela L. 1992. Application of the new production philosophy to construction. Vol. 72. Stanford (CA): Stanford University.
  • Koskela L. 2000. An exploration towards a production theory and its application to construction. Finland: VTT Technical Research Centre of Finland.
  • Koskela L, Howell G. 2002. The underlying theory of project management is obsolete. Paper presented at the PMI Research Conference; Aug; Seattle, USA.
  • Koskela L, Howell G, Ballard G, Tommelein I. 2002. The foundations of lean construction. In: Design and Construction: Building in Value. Oxford, UK: Butterworth Heinemann. p. 211–226.
  • Kothari CR. 2004. Research methodology: methods and techniques. New Delhi: New Age International.
  • Krafcik JF. 1988. Triumph of the lean production system. MIT Sloan Manage Rev. 30(1):41–52. https://search.proquest.com/docview/224963951?pq-origsite=gscholar
  • Kung D, Alex DP, Al-Hussein M, Fernando S. 2008. Application of lean thinking to improve the productivity of water and sewer service installations. Can J Civ Eng. 35(4):418–430.
  • Lajevardi A, Endut IR, Paydar S. 2011. Application of lean model to reduce waste of time in construction Case study of concreting task in Malaysia. Paper presented at the 2011 IEEE Colloquium on Humanities, Science and Engineering (CHUSER); Penang, Malaysia.
  • Latham Sir M. 1994. Constructing the team: final report of the government/industry review of procurement and contractual arrangements in the UK construction industry. London: HMSO.
  • Leong MS, Tilley P. 2008. A lean strategy to performance measurement–reducing waste by measuring'next'customer needs. Paper presented at the 16th Annual Conference of the International Group for Lean Construction; Jul 16–18; Manchester, UK.
  • Madsen DØ, Storsveen M, Klethagen P, Stenheim T. 2016. The diffusion and popularity of Lean in Norway: an exploratory survey. Cogent Business Manage. 3(1):1258132.
  • Mao X, Zhang X. 2008. Construction process reengineering by integrating lean principles and computer simulation techniques. J Construct Eng Manage. 134(5):371–381.
  • Mastroianni R, Abdelhamid T. 2003. The challenge: the impetus for change to lean project delivery. Paper presented at the 11th Annual Conference of the International Group for Lean Construction; Jul 22–24; Virginia, USA.
  • Matias J, Cachadinha N. 2010. Evaluating the potential benefits and challenges of lean construction adoption in the Portuguese construction industry: a survey study. Paper Presented at the 18th Annual Conference of the International Group for Lean Construction; Jul 14–16; Haifa.
  • Mohan SB, Iyer S. 2005. Effectiveness of lean principles in construction. Paper presented at the 13th Annual Conference of the International Group for Lean Construction; Jul 19–21; Sydney, Australia.
  • Mossman A. 2009. Why isn't the UK construction industry going lean with gusto? Lean Construct J. 13–23.
  • Nakagawa Y, Shimizu Y. 2004. Toyota production system adopted by building construction in Japan. Paper presented at the 12th Annual Conference of the International Group for Lean Construction; Aug 3–5; Helsingør, Denmark.
  • Ngowi A. 2000. Impact of culture on the application of TQM in the construction industry in Botswana. Int J Qual Reliab Manage. 17(4/5):442–452.
  • Ohno T. 1988. Toyota production system: beyond large-scale production. Boca Raton (FL): CRC Press.
  • Olamilokun O. 2015. Investigating facilitators and barriers for adopting lean construction principles in the Nigerian building consulting firms. Int J Innov Res Dev. 4(12):234–239.
  • Olatunji JO. 2008. Lean-in-Nigerian construction: state, barriers, strategies and ‘Go-To-Gemba approach’. Paper presented at the 16th Annual Conference of the International Group for Lean Construction; Jul 16–18; Manchester, UK.
  • Paez O, Salem S, Solomon J, Genaidy A. 2005. Moving from lean manufacturing to lean construction: toward a common sociotechnological framework. Hum Factors Manage. 15(2):233–245.
  • Polat G, Ballard G. 2004. Waste in Turkish construction: need for lean construction techniques. Paper presented at the 12th Annual Conference of the International Group for Lean Construction; Aug 3–5; Helsingør, Denmark.
  • Salem O, Solomon J, Genaidy A, Luegring M. 2005. Site implementation and assessment of lean construction techniques. Lean Construct J. 2(2):1–21.
  • Salem O, Solomon J, Genaidy A, Minkarah I. 2006. Lean construction: from theory to implementation. J Manage Eng. 22(4):168–175.
  • Salem O, Zimmer E. 2005. Review of application of lean manufacturing principles to construction. Lean Construct J. 2(2):51–54.
  • Sarhan JG, Xia B, Fawzia S, Karim A. 2017. Lean construction implementation in the Saudi Arabian construction industry. Construct Econ Build. 17(1):46–69.
  • Sekaran U, Bougie R. 2016. Research methods for business: a skill building approach. New York: John Wiley & Sons.
  • Senaratne S, Wijesiri D. 2008. Lean construction as a strategic option: testing its suitability and acceptability in Sri Lanka. Lean Construct J. 4(1):34–48.
  • Shingo S. 1988. Non-stock production: the Shingo system of continuous improvement. Boca Raton (FL): CRC Press.
  • Simonsson P, Emborg M. 2007. Industrialization in Swedish bridge engineering: a case study of lean construction. Paper Presented at the 15th Annual Conference of the International Group for Lean Construction; 18–20 Jul 2007; East Lansing, Michigan, USA.
  • Sureshchandar GS, Rajendran C, Anantharaman RN. 2001. A holistic model for total quality service. Int J Serv Ind Manage. 12(4):378–412.
  • Sweis G. 2013. Factors affecting time overruns in public construction projects: the case of Jordan. Int J Business Manage. 8(23):120.
  • Sweis G, Hiyassat M, Al-Hroub FF. 2016. Assessing lean conformance by first-grade contractors in the Jordanian construction industry. Construct Innov. 16(4):446–459.
  • Sweis G, Sweis R, Hammad AA, Shboul A. 2008. Delays in construction projects: the case of Jordan. Int J Project Manage. 26(6):665–674.
  • Tapping D, Luyster T, Shuker T. 2002. Value stream management. New York: Productivity Press.
  • Tezel A, Nielsen Y. 2013. Lean construction conformance among construction contractors in Turkey. J Manage Eng. 29(3):236–250.
  • Womack JP, Jones DT. 1996. Beyond Toyota: how to root out waste and pursue perfection. Harv Bus Rev. 74(5):140–158.
  • Womack JP, Jones DT, Roos D. 1990. Machine that changed the world. Riverside (NJ): Simon and Schuster.
  • Yehuda B, Brooks CH. 2008. Survey response rate levels and trends in organizational research. Hum Relat. 61(8):1139–1160.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.