305
Views
9
CrossRef citations to date
0
Altmetric
Original Articles

Integrating an expert system with BrIMS, cost estimation, and linear scheduling at conceptual design stage of bridge projects

&

References

  • Agrawal K, Benoit AML, Robert Y. 2010. Scheduling algorithms for linear workflow optimization. 24th IEEE International Symposium on Parallel and Distributed Processing (IPDPS); Atlanta, Georgia, 19–23.
  • An SH, Kim GH, Kang KI. 2007. A case-based reasoning cost estimating model using experience by analytic hierarchy process. Build Environ. 42(7):2573–2579. Elsevier.
  • Ding L, Zhou Y, Akinci E. 2014. Building information modeling (BIM) application framework: The process of expanding 3D to computable nD. Automat Constr. 46:82–93. Elsevier.
  • Elbeltagi E, Dawood M. 2011. Integrated visualized time control system for repetitive construction projects. Automat Constr. 20(7):940–953.
  • Hinze J. 2008. Construction planning and scheduling. 3rd ed. Upper Saddle River (NJ): Pearson Prentice Hall.
  • Jeong WS, Chang S, Son JW. 2016. BIM-Integrated construction operation simulation for just-in-time production management. Sustain Multidiscip Dig Publ Inst (MDPI). 8(11):1–25.
  • Kim KJ, Yun WG, Cho N, Ha J. 2017. Life cycle assessment based environmental impact estimation model for pre-stressed concrete beam bridge in the early design phase. Environ Imp Assess Rev. 64:47–56. Elsevier.
  • Kivimäki T, Heikkilä R. 2009. Integrating 5D product modelling to on-Site 3D surveying of bridges. ISARC ‘26th’, Austin (TX), 445–450.
  • Lee KM, Lee YB, Shim CS, Park KL. 2012. Bridge information models for construction of a concrete box-girder bridge. Struct Infrastruct Eng. 8(7):687–703.
  • Liu W, Flood I, Issa R. 2005. Simulation and optimization of linear construction projects. International Conference on Computing in Civil Engineering, ASCE; Cancun, Mexico, 1–11. DOI:10.1061/40794(179)158.
  • Makovsek D. 2014. Systematic construction risk, cost estimation mechanism and unit price movements. Transport Pol. 35:135–145. Elsevier.
  • McGuire B, Atadero R, Clevenger C, Ozbek M. 2016. Bridge information modeling for inspection and evaluation. J Bridge Eng. 21(4):04015076.
  • Peurifoy R, Oberlender G. 2002. Estimating construction costs. 5th ed. New York, United States: McGraw Hill Education.
  • Shim C, Yun N, Song H. 2011. Application of 3D bridge information modeling to design and construction of bridges. Proc Eng. 14:95–99. Elsevier.
  • Shirole AM, Riordan TJ, Chen SS, Gao Q, Hu H, Puckett JA. 2009. BrIM for project delivery and the life-cycle: state of the art. Bridge Struct. 5(4):173–187.
  • Song L, Lee S-H, Rachmat F. 2012. Stochastic look-ahead scheduling method for linear construction projects. JRACR. 2(4):252–260.
  • Su Y, Lucko G. 2016. Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions. Automat Construct. 70:38–50. Elsevier.
  • Tang Y, Liu R, Wang HL, Sun Q. 2014. Schedule control model for linear projects based on linear scheduling method and constraint programming. Automat Construct. 37:22–37.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.