Construction project performance areas for Indian construction projects

&

References

  • Ahmed R, Azmi bin Mohamad N. 2016. Exploring the relationship between multi-dimensional top management support and project success: an international study. Eng Manage J. 28(1):54–67.
  • Alaghbari W, Al-Sakkaf AA, Sultan B. 2019. Factors affecting construction labour productivity in Yemen. Int J Constr Manage. 19(1):79–91.
  • Al-Tmeemy SMHM, Abdul-Rahman H, Harun Z. 2011. Future criteria for success of building projects in Malaysia. Int J Project Manage. 29(3):337–348.
  • Armstrong JS, Overton TS. 1977. Estimating nonresponse bias in mail surveys. J Market Res. 14(3):396–402.
  • Arriagada DRE, Alarcon CLF. 2013. Knowledge management and maturation model in construction companies. J Constr Eng Manage. 140(4):B4013006.
  • Baccarini D. 1999. The logical framework method for defining project success. Project Manage J. 30(4):25–32.
  • Baker BN, Murphy DC, Fisher D. 1983. Factors affecting project success. In Cleland DI, King WR, editors. Project management handbook. New York (NY): Van Nostrand Reinhold; p. 669–685.
  • Belassi W, Tukel OI. 1996. A new framework for determining critical success/failure factors in projects. Int J Project Manage. 14(3):141–151.
  • Belout A. 1998. Effects of human resource management on project effectiveness and success: toward a new conceptual framework. Int J Project Manage. 16(1):21–26.
  • Berssaneti FT, Carvalho MM. 2015. Identification of variables that impact project success in Brazilian companies. Int J Project Manage. 33(3):638–649.
  • Birks DF. 2006. Marketing research: an applied approach. England: Pearson Education UK.
  • Bryde DJ, Robinson L. 2005. Client versus contractor perspectives on project success criteria. Int J Project Manage. 23(8):622–629.
  • Chan AP, Chan AP. 2004. Key performance indicators for measuring construction success. Benchmarking. 11(2):203–221.
  • Chan AP, Scott D, Chan AP. 2004. Factors affecting the success of a construction project. J Constr Eng Manage. 130(1):153–155.
  • Chan AP, Scott D, Lam EW. 2002. Framework of success criteria for design/build projects. J Manage Eng. 18(3):120–128.
  • Chen IJ, Paulraj A. 2004. Towards a theory of supply chain management: the constructs and measurements. J Oper Manage. 22(2):119–150.
  • Chen SC, Quester PG. 2005. Developing a value-based measure of market orientation in an interactive service relationship. J Market Manage. 21(7–8):779–808.
  • Chin WW. 2010. How to write up and report PLS analyses. In Esposito Vinzi V, Chin WW, Henseler, J, Wang H, editors. Handbook of partial least squares: concepts, methods and applications. Berlin/Heidelberg: Springer-Verlag; p. 655–690.
  • Cho KM, Hong TH, Hyun CT. 2009. Effect of project characteristics on project performance in construction projects based on structural equation model. Expert Syst Appl. 36(7):10461–10470.
  • Chou JS, Irawan N, Pham AD. 2013. Project management knowledge of construction professionals: cross-country study of effects on project success. J Constr Eng Manage. 139(11):04013015.
  • Chovichien V, Nguyen TA. 2013. List of indicators and criteria for evaluating construction project success and their weight assignment. In Proceedings of the 4th International Conference on Engineering, Project, and Production Management (EPPM 2013); Bangkok, Thailand. p. 130–150.
  • Col Debella D, Ries R. 2006. Construction delivery systems: a comparative analysis of their performance within school districts. J Constr Eng Manage. 132(11):1131–1138.
  • Cooke-Davies T. 2002. The “real” success factors on projects. Int J Project Manage. 20(3):185–190.
  • El Asmar M, Hanna AS, Loh WY. 2016. Evaluating integrated project delivery using the project quarterback rating. J Constr Eng Manage. 142(1):04015046.
  • Field A. 2009. Discovering statistics using SPSS. 3rd ed. London: Sage.
  • Fornell C, Larcker DF. 1981. Structural equation models with unobservable variables and measurement error: algebra and statistics. J Market Res. 18:382–388.
  • Fortune J, White D, Jugdev K, Walker D. 2011. Looking again at current practice in project management. Int J Managing Projects Bus. 4(4):553–572.
  • George D, Mallery P. 2003. SPSS for window step by step. 4th ed. Bostan, MA: Allyn and Bacon.
  • Goh CS, Rowlinson S. 2013. Conceptual maturity model for sustainable construction. J Leg Aff Dispute Resolut Eng Constr. 5(4):191–195.
  • Hair JF, Anderson RE, Babin BJ, Black WC. 2010. Multivariate data analysis: a global perspective. Vol. 7. Upper Saddle River (NJ): Pearson Prentice-Hall.
  • Hair JF, Ringle CM, Sarstedt M. 2011. PLS-SEM: indeed a silver bullet. J Market Theory Pract. 19(2):139–152.
  • Hair JF, Hult GTM, Ringle CM, Sarstedt M. 2014. A primer on partial least squares structural equation modeling. Thousand Oaks (CA): Sage.
  • Hair J, Black W, Babin B, Anderson R, Tatham R. 2006. Multivariate data analysis. 6th ed. Upper Saddle River (NJ): Pearson Prentice-Hall.
  • Halman JI, Voordijk JT. 2012. Balanced framework for measuring performance of supply chains in house building. J Constr Eng Manage. 138(12):1444–1450.
  • India Brand Equity Foundation. 2018. India Infrastructure-Industry Analysis report. [accessed 2018 Mar 18]. www.ibef.org
  • Jha KN, Iyer KC. 2007. Commitment, coordination, competence and the iron triangle. Int J Project Manage. 25(5):527–540.
  • Kaplan RS, Norton DP. 1992. The balanced scorecard-measures that drive performance. Harv Bus Rev. 70(1):71–79.
  • Karlsen JT, Gottschalk P. 2004. Factors affecting knowledge transfer in IT projects. Eng Manage J. 16(1):3–11.
  • Khang DB, Moe TL. 2008. Success criteria and factors for international development projects: a life‐cycle‐based framework. Project Manage J. 39(1):72–84.
  • Kock N. 2015. A note on how to conduct a factor-based PLS-SEM analysis. Int J E-Collab 11(3):1–9.
  • Kock N, Lynn G. 2012. Lateral collinearity and misleading results in variance-based SEM: an illustration and recommendations. J Assoc Inform Syst. 13(7):546–580.
  • Kog YC, Loh PK. 2012. Critical success factors for different components of construction projects. ASCE J Constr Eng Manage. 138(4):520–528.
  • Kotrlik JWKJW, Higgins CCHCC. 2001. Organizational research: determining appropriate sample size in survey research. Inform Technol Learn Perform J. 19(1):43.
  • Lema NM. 1995. Construction of labour productivity modeling. Dar es Salaam: University of Dar es Salaam.
  • Leon H, Osman H, Georgy M, Elsaid M. 2018. System dynamics approach for forecasting performance of construction projects. J Manage Eng. 34(1):04017049.
  • Lim CS, Mohamed MZ. 1999. Criteria of project success: an exploratory re-examination. Int J Project Manage. 17(4):243–248.
  • Lin G, Shen GQ, Sun M, Kelly J. 2011. Identification of key performance indicators for measuring the performance of value management studies in construction. J Constr Eng Manage. 137(9):698–706.
  • McCoy FA. 1986. Measuring success: establishing and maintaining a baseline. PMI Annual Seminar and Symposium, Montreal, Canada. p. 47–52.
  • Menches CL, Hanna AS. 2006. Quantitative measurement of successful performance from the project manager’s perspective. J Constr Eng Manage. 132(12):1284–1293.
  • Meng X. 2012. The effect of relationship management on project performance in construction. Int J Project Manage. 30(2):188–198.
  • Mir FA, Pinnington AH. 2014. Exploring the value of project management: linking project management performance and project success. Int J Project Manage. 32(2):202–217.
  • Molenaar KR, Navarro D. 2011. Toward use of key performance indicators in highway design and construction. Transportation Research Board 90th Annual Meeting; Washington, DC, USA.
  • Molenaar K, Washington S, Diekmann J. 2000. Structural equation model of construction contract dispute potential. J Constr Eng Manage. 126(4):268–277.
  • Muller R, Turner R. 2007. The influence of project managers on project success criteria and project success by type of project. Eur Manage J. 25(4):298–309.
  • [NIST] National Institute of Standards and Technology. 2008. Baldridge national quality programme – why apply. Gaithersburg (MD): National Institute of Standards and Technology.
  • Navon R. 2005. Automated project performance control of construction projects. Autom Constr. 14(4):467–476.
  • Neely AD, Adams C, Kennerley M. 2002. The performance prism: the scorecard for measuring and managing business success. London: Financial Times/Prentice Hall.
  • Ngacho C, Das D. 2014. A performance evaluation framework of development projects: an empirical study of Constituency Development Fund (CDF) construction projects in Kenya. Int J Project Manage. 32(3):492–507.
  • Nguyen LD, Ogunlana SO, Lan DT. 2004. A study on project success factors in large construction projects in Vietnam. Eng Const Arch Man. 11(6):404–413.
  • Norman GR, Streiner DL. 2003. PDQ statistics. 3rd ed. Ontario: BC Decker Inc.
  • Nudurupati S, Arshad T, Turner T. 2007. Performance measurement in the construction industry: an action case investigating manufacturing methodologies. Comp Ind. 58(7):667–676.
  • Ofori-Kuragu JK, Baiden B, Badu E. 2016. Critical success factors for Ghanaian contractors. Benchmarking. 23(4):843–865.
  • Oyewobi LO. 2014. Modeling performance differentials in large construction organisations in South Africa [doctoral dissertation]. Cape Town: University of Cape Town.
  • Papke-Shields KE, Beise C, Quan J. 2010. Do project managers practice what they preach, and does it matter to project success? Int J Project Manage. 28(7):650–662.
  • Parmenter D. 2010. Key performance indicators: developing, implementing, and using winning KPIs. Hoboken (NJ): Wiley.
  • Pich M, Loch C, De Meyer A. 2002. On uncertainty, ambiguity, and complexity in project management. Manage Sci. 48(8):1008–1023.
  • Pinter U, Psunder I. 2013. Evaluating construction project success with use of the M-TOPSIS method. J Civil Eng Manage. 19(1):16–23.
  • Pinto JK, Slevin DP. 1988. Project success: definitions and measurement techniques. Newtown Square (PA): Project Management Institute.
  • PMI. 2005. Construction extension to the PMBOK® guide. 3rd ed. Newtown Square (PA): Project Management Institute.
  • PMI. 2013. A guide to the project management body of knowledge. Newtown Square (PA): Project Management Institute.
  • Pocock JB, Liu LY, Kim MK. 1997. Impact of management approach on project interaction and performance. J Constr Eng Manage. 123(4):411–418.
  • Polit DF, Hungler BP. 1985. Essentials of nursing research: methods and applications. Philadelphia: Lippincott Williams & Wilkins.
  • Quality Scotland. 2008. The EFQM model. Edinburgh: Quality Scotland. [accessed 2018 Apr 17]. www.qualityscotland.co.uk
  • Rad PF. 2003. Project success attributes. Cost Eng. 45(4):23–29.
  • Rigdon EE. 1998. Structural equation modeling. In Marcoulides GA, editor. Modern methods for business research. Mahwah (NJ): Lawrence-Erlbaum Associates; p. 251–294.
  • Robins J. 2012. Partial-least square – editorial. Long Range Plan. 45(5/6):309–311.
  • Rockart JF. 1982. The changing role of information systems executive: a critical success factors perspective. Sloan Manage Rev. 24(1):3–1.
  • Rojas EM, Kell I. 2008. Comparative analysis of project delivery systems cost performance in Pacific Northwest public schools. J Constr Eng Manage. 134(6):387–397.
  • Rosenthal R, Rosnow RL. 1991. Essentials of behavioral research: methods and data analysis. New York (NY): McGraw-Hill Humanities Social.
  • Samee K, Pongpeng J. 2016. Structural equation model for construction equipment selection and contractor competitive advantages. KSCE J Civ Eng. 20(1):77–89.
  • Sands MS. 2010. Standards and measures-whole-building metrics driving innovation and high performance. Lean Constr J. 1–16.
  • Sanvido V, Grobler F, Parfitt K, Guvenis M, Coyle M. 1992. Critical success factors for construction projects. J Constr Eng Manage. 118(1):94–111.
  • Shehata ME, El-Gohary KM. 2011. Towards improving construction labor productivity and projects’ performance. Alexandr Eng J. 50(4):321–330.
  • Shen LY, Bao Q, Ip SL. 2000. Implementing innovative functions in construction project management towards the mission of sustainable development. Proceedings of the Millennium Conference on Construction Project Management; 2000 Oct 24; Hong Kong. p. 77–85.
  • Shenhar AJ, Dvir D, Levy O, Maltz AC. 2001. Project success: a multidimensional strategic concept. Long Range Plan. 34(6):699–725.
  • Shrnhur AJ, Levy O, Dvir D. 1997. Mapping the dimensions of project success. R&D Manage. 28(2):5–13.
  • Skibniewski MJ, Ghosh S. 2009. Determination of key performance indicators with enterprise resource planning systems in engineering construction firms. J Constr Eng Manage. 135(10):965–978.
  • Songer AD, Molenaar KR. 1997. Project characteristics for successful public-sector design-build. J Constr Eng Manage. 123(1):34–40.
  • Tabish SZ, Jha KN. 2012. Success traits for a construction project. ASCE J Constr Eng Manage. 138(10):1131–1138.
  • Tam VW, Shen LY, Kong JS. 2011. Impacts of multi-layer chain subcontracting on project management performance. Int J Project Manage. 29(1):108–116.
  • Toor SR, Ogunlana SO. 2008. Critical COMs of success in large-scale construction projects: evidence from Thailand construction industry. Int J Project Manage. 26(4):420–430.
  • Tripathi KK, Jha KN. 2018. An empirical study on performance measurement factors for construction organizations. KSCE J Civil Eng. 22(4):1052–1066.
  • Tripathi KK, Hasan A, Jha KN. 2019. Evaluating performance of construction organizations using fuzzy preference relation technique. Int J Constr Manage. 1–14. doi: https://doi.org/10.1080/15623599.2019.1613210
  • Walker DH, Vines MW. 2000. Australian multi-unit residential project construction time performance factors. Eng Con Arch Man. 7(3):278–284.
  • Wang X, Huang J. 2006. The relationships between key stakeholders’ project performance and project success: perceptions of Chinese construction supervising engineers. Int J Project Manage. 24(3):253–260.
  • Williams T. 2016. Identifying success factors in construction projects: a case study. Project Manage J. 47(1):97–112.
  • Wong WK, Cheung SO, Yiu TW, Pang HY. 2008. A framework for trust in construction contracting. Int J Project Manage. 26(8):821–829.
  • Wong WS, Chan EH. 2000. Building Hong Kong: environmental considerations. Vol. 1. Hong Kong: Hong Kong University Press.
  • Yu AT, Shen Q, Kelly J, Hunter K. 2006. Investigation of critical success factors in construction project briefing by way of content analysis. J Constr Eng Manage. 132(11):1178–1186.
  • Zakeri M, Olomolaiye PO, Holt GD, Harris FC. 1996. A survey of constraints on Iranian construction operatives’ productivity. Constr Manage Econ. 14(5):417–426.
  • Zhang P, Ng FF. 2013. Explaining knowledge-sharing intention in construction teams in Hong Kong. J Constr Eng Manage. 139(3):280–293.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.