1,284
Views
11
CrossRef citations to date
0
Altmetric
Original Articles

Framework for selection of lean construction tools based on lean objectives and functionalities

, &

References

  • Aapaoja A, Haapasalo H. 2014. The challenges of standardization of products and processes in construction. Proceedings of the 22nd Annual Conference of the International Group for Lean; June. p. 983–993.
  • Abdelhamid TS. 2008. LC principles and methods. Michigan State University. [accessed 2019 Oct 6]. https://msu.edu/∼tariq/Lean_Construction_Intro_COMPREHENSIVE.pdf.
  • Abdelhamid TS. 2003. Six sigma in lean construction systems: opportunities and challenges. Proceedings of the Eleventh Annual Conference of the International Group for Lean Construction; July; Virginia: IGLC. p. 22–24.
  • Abusalem O. 2018. Towards last planner system implementation in Gaza Strip, Palestine. Int J Constr Manage. 1–18.
  • Agbulos A, Mohamed Y, Al-Hussein M, AbouRizk S, Roesch J. 2006. Application of lean concepts and simulation analysis to improve efficiency of drainage operations maintenance crews. J Constr Eng Manage. 132(3):291–299.
  • Ahiakwo O, Oloke D, Suresh S, Khatib J. 2013. A case study of last planner system Implementation in Nigeria. Proceedings of the 21th Annual Conference of the International Group for Lean Construction; August; Fortaleza, Brazil: IGLC. p. 699–707.
  • Alarcón LF, Diethelm S, Rojo O, Calderón R. 2011. Assessing the impacts of implementing Lean Construction. Rev Ing Constr. 23(1):26–33. https://www.ricuc.cl/index.php/ric/article/view/ALARCON.
  • Aljohani A, Ahiaga-Dagbui D, Moore D. 2017. Construction projects cost overrun: What does the literature tell us? Int J Innov Manage Technol. 8(2):137.
  • Al-Momani AH. 2000. Construction delay: a quantitative analysis. Int J Project Manage. 18(1):51–59.
  • Alwisy A, Bouferguene A, Al-Hussein M. 2020. Framework for target cost modelling in construction projects. Int J Constr Manage. 20(2):89–104. .
  • Ammar MA. 2019. Optimization of line of balance scheduling considering work interruption. Int J Constr Manage. 1–12. .
  • Andersen B, Belay AM, Seim EA. 2012. Lean Construction practices and its effects: A case study at St Olav's Integrated Hospital, Norway. Lean Constr J. 122–149. https://www.leanconstruction.org/media/docs/lcj/2012/LCJ_12_003.pdf.
  • Ansah RH, Sorooshian S. 2017. Effect of lean tools to control external environment risks of construction projects. Sustainable Cities Soc. 32:348–356.
  • Arbulu R, Ballard G, Harper N. 2003. Kanban in construction. Proceedings of the Eleventh Annual Conference of the International Group for Lean Construction; Virginia: IGLC. p. 16–17.
  • Arefazar Y, Nazari A, Hafezi MR, Maghool SAH. 2019. Prioritizing agile project management strategies as a change management tool in construction projects. Int J Constr Manage. 1–12. .
  • Aslam M, Baffoe-Twum E, Saleem F. 2019. Design changes in construction projects–causes and impact on the cost. Civ Eng J. 5(7):1647–1655.
  • Ayarkwa J, Agyekum K, Adinyira E. 2011. Barriers to sustainable implementation of LC in the Ghanaian building industry. Proceedings 6th Built Environment Conference, JHB, South Africa.
  • Aziz RF, Hafez SM. 2013. Applying lean thinking in construction and performance improvement. Alexandria Eng J. 52(4):679–695.
  • Ballard G, Arbulu R. 2004. Making prefabrication lean. Proceedings of the 12th Annual Conference of the International Group for Lean Construction; August; Helsingør, Denmark: IGLC. p. 3–5.
  • Ballard G, Howell G. 1995. Toward construction JIT. In: Alarcón L, editor. Lean construction; Rotterdam, The Netherlands: AA Balkema and Taylor & Francis; p. 291–300.
  • Ballard G, Koskela L. 1998. On the agenda of design management research. Proceedings of the 6th Annual Conference of the International Group for Lean Construction; August; Guarujá, Brazil: IGLC. p. 52–69.
  • Ballard G, Tommelein I, Koskela L, Howell G. 2007. Lean construction tools and techniques. In: Best R, De Valence G, editors. Design and construction; London, UK: Routledge, Taylor and Francis Group; p. 251–279.
  • Ballard G, Zabelle T. 2000. Lean design: process tools & techniques, white paper# 10. Pineville, LA: LC Institute.
  • Ballard G. 1993. Lean Construction and EPC performance improvement. In: Alarcón L, editor. Lean construction. Rotterdam, The Netherlands: AA Balkema and Taylor and Francis; p. 79–91.
  • Bashir AM, Suresh S, Oloke DA, Proverbs DG, Gameson R. 2015. Overcoming the challenges facing LC practice in the UK contracting organizations. IJAEC. 4(1):10–18. http://usir.salford.ac.uk/id/eprint/37743/.
  • Cerveró-Romero F, Napolitano P, Reyes E, Teran L. 2013. Last Planner System® and Lean approach process®: experiences from implementation in Mexico. Proceedings of the 21th Annual Conference of the International Group for Lean Construction; Fortaleza, Brazil: IGLC. p. 709–718.
  • Cheng R, Johnson A. 2016. Motivation and means: how and why IPD and lean lead to success. Research Report, Integrated Project Delivery Alliance (IPDA) & Lean Construction Institute (LCI). https://conservancy.umn.edu/handle/11299/198897.
  • CLMA. 2016. Construction productivity in an imbalanced labor market. Construction Industry Resources, LLC. http://www.myclma.com/wp-content/uploads/2016/06/Productivity_White_Paper_FINAL.pdf.
  • Construction Lean Improvement Programme (CLIP). 2005. Profit together from process improvements. Eleven Case Studies, DTI, BRE. https://www.bre.co.uk/filelibrary/pdf/CLIP/BRE-_CLIP_Vol_2_reprint_2006.pdf.
  • Conte ASI, Gransberg DD. 2001. LC: from theory to practice. 2001 Transactions, AACE, Int’l, Pittsburgh, Pennsylvania, June, p. CSC10.01–CSC10.05.
  • Crowther J, Ajayi SO. 2019. Impacts of 4D BIM on construction project performance. Int J Constr Manage. 1–14. .
  • Dallasega P, Marcher C, Marengo E, Rauch E, Matt DT, Nutt W. 2016. A decentralized and pull-based control loop for on-demand delivery in ETO construction supply chains. In: 24th Annual Conference of the International Group for Lean Construction, Boston, MA, Sect. 8. p. 33–42.
  • Desai AE, Shelar MJ. 2014. Value stream mapping as a lean construction tool – a case study. Int J Eng Res Technol. 3(12):354–358.
  • Diekmann JE, Krewedl M, Balonick J, Stewart T, Won S. 2004. Application of lean manufacturing principles to construction. Boulder, CO, Construction Industry Institute, p. 191.
  • Do D, Chen C, Ballard G, Tommelein I. 2014. Target value design as a method for controlling project cost overruns. In: 22nd Annual Conference of the International Group for Lean Construction; June; Oslo p. 171–181.
  • Dozzi SP, AbouRizk SM. 1993. Productivity in construction. p. 44. Ottawa, Canada: Institute for Research in Construction, National Research Council.
  • Enshassi A, Abu Zaiter M. 2014. Implementation of lean tools on safety in construction projects in Palestine. 22nd Annual conference Proceedings IGLC, Oslo, Norway; June. p. 1205–1218.
  • Enshassi A, Saleh N, Mohamed S. 2019. Barriers to the application of LC techniques concerning safety improvement in construction projects. Int J Constr Manage. 1–17. .
  • Fernández S, Ramos D. 2014. Applicability of set-based design on structural engineering [master thesis]. Sweden: Chalmers University of Technology. http://publications.lib.chalmers.se/records/fulltext/200945/200945.pdf.
  • Gallardo CA, Granja AD, Picchi FA, Folch AT. 2006. Stabilization and standardization of a precast production process. Proceedings of 14th Annual Conference of the International Group for Lean Construction; Santiago, Chile: IGLC. p. 205–213.
  • Gao S, Low SP. 2015. Implementing Toyota Way principles for construction projects in China: a case study. Int J Constr Manage. 15(3):179–195.
  • Green SD. 1999. The missing arguments of lean construction. Constr Manage Econ. 17(2):133–137.
  • Guide AIA. 2007. Integrated project delivery: a guide. California: American Institute of Architects. http://info.aia.org/siteobjects/files/ipd_guide_2007.pdf.
  • Han SH, Chae MJ, Im KS, Ryu HD. 2008. Six sigma-based approach to improve performance in construction operations. J Manage Eng. 24(1):21–31.
  • Jaillon L, Poon CS. 2009. The evolution of prefabricated residential building systems in Hong Kong: A review of the public and the private sector. Autom Constr. 18(3):239–248.
  • Jørgensen B. 2006. Integrating lean design and Lean Construction: processes and methods [doctoral dissertation]. https://orbit.dtu.dk.
  • Kalsaas BT, Skaar J, Thorstensen RT. 2009. Implementation of Last Planner in a medium-sized construction site. Proceedings of the 17th Annual Conference of the International Group for Lean Construction; July; Taipei, Taiwan: IGLC. p. 15–17.
  • Kankainen J, Seppänen O. 2003. A line-of-balance based schedule planning and control system. Proceedings of the 11th Annual Conference of the International Group for Lean Construction; July; Blacksburg, VA: IGLC. p. 22–24.
  • Karlsson M, Lakka A, Sulankivi K, Hanna AS, Thompson BP. 2008. Best practices for integrating the concurrent engineering environment into multipartner project management. J Constr Eng Manage. 134(4):289–299.).
  • Kawish SE. 2017. Identifying and prioritizing barriers and overcoming strategies in implementing LC principles and methods within transportation projects [mater of science thesis]. East Lansing: Michigan State University.
  • Kim D, Park HS. 2006. Innovative construction management method: Assessment of Lean Construction implementation. KSCE J Civ Eng. 10(6):381–388.
  • Koskela L. 1992. Application of the new production philosophy to construction. Vol. 72. Stanford, CA: Stanford University. http://www.leanconstruction.org.
  • Lindhard S, Wandahl S. 2014. Exploration of the reasons for delays in construction. Int J Constr Manage. 14(1):36–44.
  • Locatelli G, Mancini M, Gastaldo G, Mazza F. 2013. Improving projects performance with Lean Construction: State of the art, applicability and impacts. Organ Technol Manage Constr: Int J . 5:775–783. https://hrcak.srce.hr/111766.
  • Lovatt AM, Shercliff HR. 1998. Manufacturing process selection in engineering design. Part 1: the role of process selection. Mater Des. 19(5–6):205–215.
  • Low SP, Ang GK. 2003. Integrating JIT and 5-S concepts for construction site management: A case study. Int J Constr Manage. 3(1):31–47.
  • Mao X, Zhang X. 2008. Construction process reengineering by integrating lean principles and computer simulation techniques. J Constr Eng Manage. 134(5):371–381.
  • Marhani MA, Jaapar A, Bari NAA, Zawawi M. 2013. Sustainability through lean construction approach: A literature review. Proc Soc Behav Sci. 101:90–99.
  • Matthews O, Howell GA. 2005. Integrated project delivery an example of relational contracting. Lean Constr J. 2(1):46–61.
  • McGraw Hill Construction. 2013. Lean construction - leveraging collaboration and advanced practices to increase project efficiency (smart market report). Massachusetts: McGraw Hill Construction Research and Analytics. https://www.leanconstruction.org/media/docs/Lean_Construction_SMR_2013.pdf.
  • More VD, Charhate DS, Sinha M. 2016. Lean construction techniques in Indian construction industry: some analysis. Int J Civ Eng Res. 7(1):59–65.
  • Mossman A. 2009. “There really is another way, if only he could stop … for a moment and think of it”—Why isn't the UK construction industry going lean with gusto? Lean Constr J. 24–36. https://www.leanconstruction.org/media/docs/lcj/2009/LCJ_08_010.pdf.
  • Mostafa S, Dumrak J, Soltan H. 2013. A framework for lean manufacturing implementation. Prod Manuf Res. 1(1):44–64.
  • Muhammad WMNW, Ismail Z, Hashim AE. 2013. Exploring Lean Construction components for Malaysian construction industry. In: 2013 IEEE Business Engineering and Industrial Applications Colloquium (BEIAC); April; IEEE. p. 1–6).
  • Nahmens I, Ikuma LH. 2012. Effects of Lean Construction on sustainability of modular homebuilding. J Archit Eng. 18(2):155–163.
  • Narayanamurthy G, Gurumurthy A. 2014. 7A model-A process selection guide for lean implementation. Proceedings of the Twenty-Fifth Annual Conference Production and Operations Management Society (POM 2014), 9–12 May 2014, Atlanta. p. 1–13.
  • O’Connor R, Swain B. 2013. Implementing lean in construction: lean tools-an introduction. London, UK: CIRIA. https://www.leanconstruction.org.uk.
  • Pasqualini F, Zawislak PA. 2005. Value stream mapping in construction: A case study in a Brazilian construction company. Proceedings of the 13th International Group for Lean Construction Conference; Sydney, Australia: IGLC. p. 117–125.
  • Patil YR, Patil DS. 2015. Feasibility study of just in time inventory management on construction project. Int Res J Eng Technol. 2(4):686–693.
  • Pearce A, Pons D. 2013. Implementing lean practices: managing the transformation risks. J Ind Eng. 2013:1–19. .
  • Philips-Ryder M, Zuo J, Jin XH. 2013. Evaluating document quality in construction projects–Subcontractors’ perspective. Int J Constr Manage. 13(3):77–94.
  • Porwal V, Fernandez-Solis J, Lavy S, Rybkowski ZK. 2010. Last planner system implementation challenges. Proceedings of the 18 Annual Conference International Group for Lean Construction; July; Haifa, Israel: IGLC. p. 548–556.
  • Rosayuru HDRR, Waidyasekara KGAS, Wijewickrama MKCS. 2019. Sustainable BIM based integrated project delivery system for construction industry in Sri Lanka. Int J Constr Manage. :1–15.
  • Sacks R, Akinci B, Ergen E. 2003. 3D modeling and real-time monitoring in support of lean production of engineered-to-order precast concrete buildings. Proceedings of the Eleventh Annual Conference of the International Group for Lean Construction, Virginia: IGLC.
  • Sacks R, Dave BA, Koskela L, Owen R. 2009. Analysis framework for the interaction between lean construction and building information modelling. Proceeding of the 17th Annual Conference of the International Group for Lean Construction; July; Taipei, Taiwan: IGLC. p. 221–234.
  • Sacks R, Rozenfeld O, Rosenfeld Y. 2005. Lean scheduling for safety: development of a time-dependent risk level model. Proceeding of the 13th Annual Conference of the International Group for Lean Construction; July; Sydney, Australia: IGLC. p. 513–520.
  • Salem O, Solomon J, Genaidy A, Luegring M. 2005. Site implementation and assessment of LC techniques. Lean Constr J. 2(2):1–21.
  • Salem O, Solomon J, Genaidy A, Minkarah I. 2006. Lean construction: from theory to implementation. J Manage Eng. 22(4):168–175.
  • Santos Ad, Powell J. 1999). Potential of Poka-Yoke devices to reduce variability in construction. Proceeding of the 7th Annual Conference of the International Group for Lean Construction; July; Berkeley: IGLC. p. 51–62.
  • Sarhan S, Fox A. 2013. Barriers to implementing Lean Construction in the UK construction industry. Built Hum Environ Rev. 6(1):1–17.
  • Sarhan S. 2011. A strategy for overcoming barriers to the successful implementation of Lean Construction in the UK [doctoral dissertation]. Plymouth, UK: University of Plymouth.
  • Sarkar D, Jha KN, Patel S. 2018. Critical chain project management for a highway construction project with a focus on theory of constraints. Int J Constr Manage. 1–14. .
  • Shang G, Sui Pheng L. 2014. Barriers to lean implementation in the construction industry in China. J Tech Manage China. 9(2):155–173.
  • Sinesilassie EG, Tabish SZS, Jha KN. 2017. Critical factors affecting schedule performance: A case of Ethiopian public construction projects–engineers’ perspective. Eng Constr Arch Man. 24(5):757–773.
  • Sinesilassie EG, Tabish SZS, Jha KN. 2018. Critical factors affecting cost performance: a case of Ethiopian public construction projects. Int J Constr Manage. 18(2):108–119.
  • Stevens M. 2013. Construction productivity is at a 15-year low: why? Stevens Construction Institute, Inc. http://www.rdbc-international.org.
  • Stevens M. 2014. Increasing adoption of lean construction by contractors. Proceeding of the 22nd Annual Conference of the International Group for Lean Construction; June. Oslo, Norway: IGLC. p. 377–388.
  • Stewart RA, Spencer CA. 2006. Six‐sigma as a strategy for process improvement on construction projects: a case study. Constr Manage Econ. 24(4):339–348.
  • Tan B, Horman MJ, Messner JI, Riley DR. 2003. Increasing the understanding of lean principles with advanced visualization technologies. Proceedings of the Eleventh Annual Conference of the International Group for Lean Construction; Virginia: IGLC.
  • Vivan AL, Ortiz FAH, Paliari JC. 2016. Model for kaizen project development for the construction industry. Gest Prod. 23(2):333–349. .
  • Wandahl S. 2014. LC with or without lean–challenges of implementing LC. Proceedings of the 22nd Annual Conference of the International Group for Lean Construction; June; Oslo, Norway: IGLC. p. 97–108.
  • Warcup RD. 2015. Successful paths to becoming a lean organization in the construction industry. [all graduate theses and dissertations]. Logan: Utah State University, 4272.
  • Wehbe FA, Hamzeh FR. 2013. Failure mode and effect analysis as a tool for risk management in construction planning. Proceedings of 21th Annual Conference of the International Group for Lean Construction; August; Fortaleza, Brazil: IGLC. p. 481–490.
  • Yahya MS, Mohammad M, Omar B, Ramly EF. 2016. A review on the selection of lean production tools. ARPN J Eng Appl Sci. 11(12):7721–7727. http://www.arpnjournals.org/jeas/research_papers/rp_2016/jeas_0616_4505.pdf.
  • Zhang X, Azhar S, Nadeem A, Khalfan M. 2018. Using building information modelling to achieve lean principles by improving efficiency of work teams. Int J Constr Manage. 18(4):293–300.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.