584
Views
8
CrossRef citations to date
0
Altmetric
Original Articles

Development of a construction performance index in the construction industry: system dynamics modelling approach

&

References

  • Ahadzie DK. 2007. A model for predicting the performance of project managers in mass house building projects in Ghana [doctoral dissertation]. Wolverhampton, UK: University of Wolverhampton.
  • Alazzaz F, Whyte A. 2015. Linking employee empowerment with productivity in off-site construction. Eng Const Arch Man. 22(1):21–37.
  • Ali HE, Al-Sulaihi IA, Al-Gahtani KS. 2013. Indicators for measuring performance of building construction companies in Kingdom of Saudi Arabia. J King Saud Univ – Eng Sci. 25(2):125–134.
  • Begum RA, Siwar C, Pereira JJ, Jaafar AH. 2006. A benefit-cost analysis on the economic feasibility of construction waste minimisation: the case of Malaysia. Resour Conserv Recy. 48(1):86–98.
  • Bouloiz H, Garbolino E, Tkiouat M, Guarnieri F. 2013. A system dynamics model for behavioral analysis of safety conditions in a chemical storage unit. Saf Sci. 58:32–40.
  • Bou-Llusar JC, Escrig-Tena AB, Roca-Puig V, Beltrán-Martín I. 2009. An empirical assessment of the EFQM Excellence Model: evaluation as a TQM framework relative to the MBNQA Model. J Oper Manage. 27(1):1–22.
  • Bryde DJ, Brown D. 2004. The influence of a project performance measurement system on the success of a contract for maintaining motorways and trunk roads. Proj Manage J. 35(4):57–65.
  • C21 Construction Contract 1999. C21 Construction Contract. 2nd ed. New South Wales: Department of Public Works and Services.
  • Chan AP, Chan AP. 2004. Key performance indicators for measuring construction success. Benchmarking. 11(2):203–221.
  • Che Ibrahim CKI, Rahmat A, Belayutham S, Costello SB. 2018. Developing a temporary multi-organization integration performance index for delivering construction projects in Malaysia. Int. J Constr Manage. 20(4):1–17.
  • Cheung SO, Suen HC, Cheung KK. 2004. PPMS: a web-based construction project performance monitoring system. Automat Constr. 13(3):361–376.
  • Chinda T. 2007. A system dynamics approach to construction safety culture [doctoral dissertation]. Australia: Griffith University Gold Coast.
  • KPI Working Group. 2000. KPI report for the minister for construction. Department of the Environment, Transport and the Regions, London, January 2000.
  • Ding Z, Zhu M, Tam VW, Yi G, Tran CN. 2018. A system dynamics-based environmental benefit assessment model of construction waste reduction management at the design and construction stages. J Clean Prod. 176:676–692.
  • El-Mashaleh M, O’Brien WJ, Minchin RE. 2006. Firm performance and information technology utilization in the construction industry. J Constr Eng Manage. 132(5):499–507.
  • Enshassi A, Abdul-Aziz AR, Abushaban S. 2012. Analysis of contractors performance in Gaza strip construction projects. Int J Constr Manage. 12(2):65–79.
  • Fellows RF, Langford D, Newcombe R, Urry S. 2009. Construction management in practice. London, UK: John Wiley & Sons.
  • Fu F, Zhang T. 2016. A new model for solving time-cost-quality trade-off problems in construction. PloS One. 11(12):e0167142.
  • Groff J. 2013. Dynamic systems modeling in educational system design & policy. New Approach Educ Res. 2:72–81.
  • Haslam RA, Hide SA, Gibb AG, Gyi DE, Pavitt T, Atkinson S, Duff AR. 2005. Contributing factors in construction accidents. Appl Ergon. 36(4):401–415.
  • Hu W, Dong J, Hwang BG, Ren R, Chen Y, Chen Z. 2019. Using system dynamics to analyze the development of urban freight transportation system based on rail transit: a case study of Beijing. Sustain Cities Soc. 15:101923.
  • Hwang BG, Zhao X. 2015. Review of global performance measurement and benchmarking initiatives. Int J Constr Manage. 15(4):265–275.
  • Jastaniah YR. 1997. Performance evaluation and benchmarking of construction industry projects using data envelopment analysis [doctoral dissertation, Southern Methodist University].
  • Jetha A, Pransky G, Hettinger LJ. 2016. Capturing complexity in work disability research: application of system dynamics modeling methodology. Disabil Rehabil. 38(2):189–194.
  • Jiang B. 2009. The effects of interorganizational governance on supplier’s compliance with SCC: an empirical examination of compliant and non-compliant suppliers. J Oper Manag. 27(4):267–280.
  • Kanjanabootra S, Corbitt B. 2016. Reproducing knowledge in construction expertise: a reflexive theory, critical approach. Constr Manage Econ. 34(7–8):561–577.
  • Karimi A, Safari H, Hashemi SH, Kalantar P. 2014. A study of the Baldrige Award framework using the applicant scoring data. Total Qual Manag Bus. 25(5–6):461–477.
  • Khanna VK, Vat P, Shankar R, Sahay BS, Gautam A. 2003. TQM modelling of the automobile manufacturing sector: a system dynamics approach. Work Study. 52(2):94–101.
  • Kim SY, Huynh TA. 2008. Improving project management performance of large contractors using benchmarking approach. Int J Proj Manage. 26(7):758–769.
  • Kirkwood CW. 1998. System dynamics methods. Tempe, AZ: College of Business Arizona State University.
  • Kylili A, Fokaides PA, Jimenez P. 2016. Key Performance Indicators (KPIs) approach in buildings renovation for the sustainability of the built environment: a review. Renew Sust Energ Revr. 56:906–915.
  • Larsen JK, Shen GQ, Lindhard SM, Brunoe TD. 2016. Factors affecting schedule delay, cost overrun, and quality level in public construction projects. J Manage Eng. 32(1):04015032.
  • Leung MY, Ng ST, Cheung SO. 2004. Measuring construction project participant satisfaction. Constr Manage Econ. 22(3):319–331.
  • Luu TV, Kim SY, Cao HL, Park YM. 2008. Performance measurement of construction firms in developing countries. Construction Man Econ. 26(4):373–386.
  • Mak TM, Chen PC, Wang L, Tsang DC, Hsu SC, Poon CS. 2019. A system dynamics approach to determine construction waste disposal charge in Hong Kong. J Clean Prod. 241:118309.
  • Meng X, Sun M, Jones M. 2011. Maturity model for supply chain relationships in construction. J Manage Eng. 27(2):97–105.
  • Mohamed S, Chinda T. 2011. System dynamics modelling of construction safety culture. Eng Const Arch Man. 18(3):266–281.
  • Nasir MK, Hadikusumo BH. 2019. System dynamics model of contractual relationships between owner and contractor in construction projects. J Manage Eng. 35(1):04018052.
  • Ngacho C, Das D. 2015. A performance evaluation framework of construction projects: insights from literature. Int J Proj Organ Manage. 7(2):151–173.
  • Nguyen NH, Chinda T. 2018. A dynamic model of profit of residential projects in Vietnam. Int J Strateg Prop Manage. 22(6):489–500.
  • NIBS 2007. BIM capability maturity model, National Institute for Building Sciences (NIBS) Facility Information Council (FIC). [retrieved 2008 October 11]. www.buildingsmartalliance.org/client/assets/files/bsa/BIM_CMM_v1.9.xls.
  • Nudurupati S, Arshad T, Turner T. 2007. Performance measurement in the construction industry: an action case investigating manufacturing methodologies. Comput Ind. 58(7):667–676.
  • Ofori-Kuragu JK, Baiden BK, Badu E. 2016. Performance measurement tools for Ghanaian contractors. Int J Constr Manage. 16(1):13–26.
  • Oyewobi LO, Windapo AO, Rotimi JOB, Jimoh RA. 2019. Determining strategic clusters and performance of construction organizations in South Africa. Int J Constr Manage. 19(1):46–56.
  • Rodrigues A, Bowers J. 1996. The role of system dynamics in project management. Int J Proj Manage. 14(4):213–220.
  • Salaheldin SI. 2009. Critical success factors for TQM implementation and their impact on performance of SMEs. Int J Prod Perf Manage. 58:215–237.
  • Senouci A, Ismail A, Eldin N. 2016. Time delay and cost overrun in Qatari public construction projects. Procedia Eng. 164:368–375.
  • Simonovic SP, Ahmad S. 2005. Computer-based model for flood evacuation emergency planning. Nat Hazards. 34(1):25–51.
  • Söderberg L, Bengtsson L. 2010. Supply chain management maturity and performance in SMEs. Oper Manage Res. 3(1–2):90–97.
  • Soewin E. 2020. Performance indices development for Thai construction industry using system dynamics modelling [doctoral dissertation, Sirindhorn International Institute of Technology, Thammasat University].
  • Soewin E, Chinda T. 2018. Factors affecting construction performance: exploratory factor analysis. IOP Conference Series: Earth and Environmental Science. Vol. 140, 4th International Conference on Civil and Environmental Engineering for Sustainability (IConCEES 2017), 4–5 December 2017, Langkawi, Malaysia.
  • Sommerville J, Robertson HW. 2000. A scorecard approach to benchmarking for total quality construction. Int J Qual Reliab Manage. 17(4/5):453–466.
  • Sterman JD. 1992. System dynamics modeling for project management. Unpublished manuscript, Cambridge, MA. p. 246.
  • Too EG, Weaver P. 2014. The management of project management: a conceptual framework for project governance. Int J Proj Manage. 32(8):1382–1394.
  • Wang Q, El-Gafy M, Zha J. 2010. Bi-level framework for measuring performance to improve productivity of construction enterprises. Construction Research Congress 2010: Innovation for Reshaping Construction Practice, 8–10 May 2010, Banff, Alberta, Canada. p. 970–979.
  • Wibowo A, Taufik J. 2017. Developing a self-assessment model of risk management maturity for client organizations of public construction projects: Indonesian context. Procedia Eng. 171:274–281.
  • Wong PS, Cheung SO, Fan KL. 2009. Examining the relationship between organizational learning styles and project performance. J Constr Eng Manage. 135(6):497–507.
  • Wongrassamee S, Simmons J, Gardiner P. 2003. Performance measurement tools: the balanced scorecard and the EFQM excellence model. Measur Bus Excel. 7(1):14–29.
  • Wright MS, Brabazon P, Tipping A, Talwalkar M. 1999. Development of a business excellence model of safety culture: safety culture improvement matrix. London: Entec UK Ltd.
  • Yelibora SA. 2017. Quality management practices of construction project teams in concrete works [doctoral dissertation, Kwame Nkrumah University of Science and Technology].
  • Yu I, Kim K, Jung Y, Chin S. 2007. Comparable performance measurement system for construction companies. J Manage Eng. 23(3):131–139.
  • Yu W, Li M, Ge Y, Li L, Zhang Y, Liu Y, Zhang L. 2015. Transformation of potential medical demand in China: a system dynamics simulation model. J Biomed Inform. 57:399–414.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.