657
Views
11
CrossRef citations to date
0
Altmetric
Original Articles

Modelling labour productivity using SVM and RF: a comparative study on classifiers performance

, , , &

References

  • Abraham A. 2005. Adaptation of fuzzy inference system using neural learning. In: Fuzzy systems engineering. Heidelberg, Germany: Springer; p. 53–83.
  • Acton QA. 2012. Advances in machine learning research and application: 2012 edition. Georgia, USA: Scholarly Editions.
  • Alaghbari W, Al-Sakkaf AA, Sultan B. 2019. Factors affecting construction labour productivity in Yemen. Int J Constr Manage. 19(1):79–91.
  • Albert M, Schmidt M. 2010. Climate-sensitive modelling of site-productivity relationships for Norway spruce (Picea abies (L.) Karst.) and common beech (Fagus sylvatica L.). For Ecol Manage. 259(4):739–749.
  • Alhuda A, Ahmed MBM. 2019. An approach to estimate the productivity of wind and solar energy in Sudan. Wad Madani, Sudan: University of Gezira.
  • Al-Kofahi Z. 2016. Dynamic modeling approach to quantify change orders impact on labor productivity [Electronic theses and dissertations]. 5288.
  • Alsugair AM, Al-Qudrah AA. 1998. Artificial neural network approach for pavement maintenance. J Comput Civ Eng. 12(4):249–255.
  • Al-Zwainy FMS, Abdulmajeed MH, Aljumaily HSM. 2013. Using multivariable linear regression technique for modeling productivity construction in Iraq. OJCE. 03(03):127–135.
  • Amendolia SR, Cossu G, Ganadu M, Golosio B, Masala G, Mura GM. 2003. A comparative study of k-nearest neighbour, support vector machine and multi-layer perceptron for thalassemia screening. Chemometr Intell Lab Syst. 69(1-2):13–20.
  • Antunes R, Gonzalez V. 2015. A production model for construction: a theoretical framework. Buildings. 5(1):209–228.
  • Arditi D, Tokdemir OB. 1999. Comparison of case-based reasoning and artificial neural networks. J Comput Civ Eng. 13(3):162–169.
  • Attar A, Gupta A, Desai D. 2012. A study of various factors affecting labour productivity and methods to improve it IOSR. J Mech Civil Eng. 1:11–14.
  • Auria L, Moro RA. 2008. Support vector machines (SVM) as a technique for solvency analysis. Berlin, Germany: DIW Berlin Library.
  • Barber QE, Bater CW, Braid AC, Coops NC, Tompalski P, Nielsen SE. 2016. Airborne laser scanning for modelling understory shrub abundance and productivity. For Ecol Manage. 377:46–54.
  • Baskoro LS, Hara Y, Otsuji Y. 2019. Labor Productivity and Foreign Direct Investment in the Indonesian Manufacturing Sector. Signifikan. 8(1):9–22.
  • Bernstein J, Mishel L, Schmitt J. 1998. The US model: the wages of inequality. In: Wheelock J, Vail J, editors. Work and idleness. Recent economic thought series. Vol. 66. Dordrecht: Springer.
  • Bingley P, Eriksson T. 2000. Pay spread and skewness, employee effort and firm productivity. Department of Economics, Faculty of Business Administration, Aarhus School. Aarhus, Denmark: Aarhus University.
  • Bokor O, Florez L, Osborne A, Gledson BJ. 2018. A framework for modelling masonry construction using hybrid simulation approaches.
  • Boussabaine A, Duff AR. 1996. An expert‐simulation system for construction productivity forecasting: conformation method used to illustrate the uncertainty associated with expert’s knowledge. Build Res Inf. 24(5):279–286.
  • Breiman L. 2001. Random forests. Mach Learn. 45(1):5–32.
  • Breiman L, Friedman J, Stone CJ, Olshen RA. 1984. Classification and regression trees. CRC Press.
  • Card D. 1999. The causal effect of education on earnings. In: Handbook of labor economics. Vol. 3. San Diego, CA, USA: Elsevier; p. 1801–1863.
  • Cheng M-Y, Wibowo DK, Prayogo D, Roy AF. 2015. Predicting productivity loss caused by change orders using the evolutionary Fuzzy support vector machine inference model. J Civil Eng Manage. 21(7):881–892.
  • Doloi H. 2007. Twinning motivation, productivity and management strategy in construction projects. Eng Manage J. 19(3):30–40.
  • Durdyev S, Ismail S, Kandymov N. 2018. Structural equation model of the factors affecting construction labor productivity. J Constr Eng Manage. 144(4):04018007.
  • Durdyev S, Mbachu J. 2018. Key constraints to labour productivity in residential building projects: evidence from Cambodia. Int J Constr Manage. 18(5):385–393.
  • El-Hendawy S, Al-Suhaibani N, Elsayed S, Refay Y, Alotaibi M, Dewir YH, Hassan W, Schmidhalter U. 2019. Combining biophysical parameters, spectral indices and multivariate hyperspectral models for estimating yield and water productivity of spring wheat across different agronomic practices. PloS One. 14(3):e0212294.
  • Everingham Y, Sexton J, Skocaj D, Inman-Bamber G. 2016. Accurate prediction of sugarcane yield using a random forest algorithm. Agron Sustain Dev. 36(2):27.
  • Ezeldin AS, Sharara LM. 2006. Neural networks for estimating the productivity of concreting activities. J Constr Eng Manage. 132(6):650–656.
  • Fayek AR, Oduba A. 2005. Predicting industrial construction labor productivity using Fuzzy expert systems. J Constr Eng Manage. 131(8):938–941.
  • Fayek AR, Tsehayae AA. 2012. Modeling construction labour productivity using fuzzy logic and exploring the use of fuzzy hybrid techniques. In: Fuzzy Information Processing Society (NAFIPS), 2012 Annual Meeting of the North American. Berkeley, CA, USA: IEEE, p. 1–6.
  • Gerek IH, Erdis E, Mistikoglu G, Usmen M. 2015. Modelling masonry crew productivity using two artificial neural network techniques. J Civil Eng Manage. 21(2):231–238. DOI: https://doi.org/10.3846/13923730.2013.802741.
  • Ghosh A, Majumdar SK. 2011. Modeling blast furnace productivity using support vector machines. Int J Adv Manuf Technol. 52(9-12):989–1003.
  • Golnaraghi S, Zangenehmadar Z, Moselhi O, Alkass S. 2019. Application of artificial neural network (s) in predicting formwork labour productivity. Adv Civ Eng. 2019:1–11.
  • Goodrum PM, Zhai D, Yasin MF. 2009. Relationship between changes in material technology and construction productivity. J Constr Eng Manage. 135(4):278–287.
  • Gundecha MM. 2013. Study of factors affecting labor productivity at a building construction project in the USA: web survey
  • Gupta V, Kansal R. 2014. Improvement of construction labor productivity in Chambal Region. Int J Res Eng Technol. 3:34–37.
  • Halligan DW, Demsetz LA, Brown JD, Pace CB. 1994. Action-response model and loss of productivity in construction. J Constr Eng Manage. 120(1):47–64.
  • Hamza M, Shahid S, Bin Hainin MR, Nashwan MS. 2019. Construction labour productivity: review of factors identified. Int J Constr Manage. DOI: https://doi.org/10.1080/15623599.2019.1627503.
  • Hanna AS, Chang C-K, Sullivan KT, Lackney JA. 2008. Impact of shift work on labor productivity for labor intensive contractor. J Constr Eng Manage. 134(3):197–204.
  • Hanna AS, Taylor CS, Sullivan KT. 2005. Impact of extended overtime on construction labor productivity. J Constr Eng Manage. 131(6):734–739.
  • Herbsman Z, Ellis R. 1990. Research of factors influencing construction productivity. Construction Manage Econ. 8(1):49–61.
  • Hiyassat MA, Hiyari MA, Sweis GJ. 2016. Factors affecting construction labour productivity: a case study of Jordan. Int J Constr Manage. 16(2):138–149.
  • Huizinga FH, Broer P. 2004. Wage moderation and labour productivity. CPB Netherlands Bureau for Economic Policy Analysis. Vol. 263, No. 28.
  • Hwang B-G, Soh CK. 2013. Trade-level productivity measurement: Critical challenges and solutions. J Constr Eng Manage. 139(11):04013013.
  • Jarkas AM, Al Balushi RA, Raveendranath P. 2015. Determinants of construction labour productivity in Oman. Int J Constr Manage. 15(4):332–344.
  • Jenks GF. 1967. The data model concept in statistical mapping. International yearbook of cartography 7; p. 186–190.
  • Kaming PF, Holt GD, Kometa ST, Olomolaiye PO. 1998. Severity diagnosis of productivity problems—a reliability analysis. Int J Project Manage. 16(2):107–113.
  • Kauhanen A, Maliranta M. 2019. The roles of job and worker restructuring in aggregate wage growth dynamics. Rev Income Wealth. 65(1):99–118.
  • Kazaz A, Ulubeyli S. 2004. A different approach to construction labour in Turkey: comparative productivity analysis. Build Environ. 39(1):93–100.
  • Kim D-W, An S-H, Cho H, Jeong J-W, Lee B-H, Doh NL, Kang K-I. 2009. Development of conceptual model of construction factory for automated construction. Build Environ. 44(8):1634–1642.
  • Kim H, Lee H-S, Park M, Ahn CR, Hwang S. 2015. Productivity forecasting of newly added workers based on time-series analysis and site learning. J Constr Eng Manage. 141(9):05015008.
  • Klein N. 2012. Real wage, labor productivity, and employment trends in South Africa: a closer look. Vol. 12–92. International Monetary Fund.
  • Kovach KA. 1987. What motivates employees? Workers and supervisors give different answers. Bus Horiz. 30(5):58–65.
  • Lee Y, Lee C-K. 2003. Classification of multiple cancer types by multicategory support vector machines using gene expression data. Bioinformatics. 19(9):1132–1139.
  • Lee S, Lee C-W, Kim J-C. 2019. Groundwater productivity potential mapping using logistic regression and boosted tree models: the case of Okcheon City in Korea. In: Advances in remote sensing and geo informatics applications. Tunisia: Springer; p. 305–307.
  • Lema NM. 1996. Construction labour productivity analysis and benchmarking: the case of Tanzania. © Ninatubu Mbora Lema. United Kingdom.
  • Lim EC, Alum J. 1995. Construction productivity: issues encountered by contractors in Singapore. Int J Project Manage. 13(1):51–58.
  • Liu X, Song Y, Yi W, Wang X, Zhu J. 2018. Comparing the random forest with the generalized additive model to evaluate the impacts of outdoor ambient environmental factors on scaffolding construction productivity. J Constr Eng Manage. 144(6):04018037.
  • Ma L, Liu C, Mills A. 2016. Construction labor productivity convergence: a conditional frontier approach Engineering. Eng, Const and Arch Manage. 23(3):283–301.
  • Machwitz M, Gessner U, Conrad C, Falk U, Richters J, Dech S. 2015. Modelling the gross primary productivity of West Africa with the Regional Biomass Model RBM+, using optimized 250 m MODIS FPAR and fractional vegetation cover information. Int J Appl Earth Obs Geoinf. 43:177–194.
  • Maia AG, Sakamoto A. 2018. Does wage reflect labor productivity? A comparison between Brazil and the United States Brazilian. Brazil J Polit Econ. 38:629–649.
  • Maloney WF, McFillen JM. 1985. Valence of and satisfaction with job outcomes. Constr Eng Manage. 111(1):53–73.
  • Manoliadis O. 2011. Labour productivity benchmarking in Greek projects Organization, technology & management in construction. Int J. 3:221–226.
  • Mao H. 1999. Estimating labour productivity using Fuvy set theory. Alberta, Canada: University of Alberta.
  • Momade MH, Hainin MR. 2018a. Problems affecting squatter settlements in Nampula. Mozambique Int J Eng Technol. 7:5022–5025.
  • Momade MH, Hainin MR. 2018b. Review of sustainable construction practices in Malaysian construction industry. Int J Eng Technol. 7:5018–5021.
  • Momade MH, Hainin MR. 2019. identifying motivational and demotivational productivity factors in Qatar construction projects engineering. Technol Appl Sci Res. 9:3945–3948.
  • Moselhi O, Assem I, El-Rayes K. 2005. Change orders impact on labor productivity. J Constr Eng Manage . 131(3):354–359.
  • Moselhi O, El-Rayes K. 2002. Analyzing weather-related construction claims. Cost Eng. 44:12.
  • Muqeem S, Idrus A, Khamidi MF, Ahmad JB, Zakaria SB. 2012. Construction labor production rates modeling using artificial neural network. ITCON. 16:713–726.
  • Nasirzadeh F, Nojedehi P. 2013. Dynamic modeling of labor productivity in construction projects. Int J Project Manage. 31(6):903–911.
  • Oduba AO. 2004. Predicting industrial construction productivity using fuzzy expert systems. United States.
  • Olomolaiye PO. 1988. An evaluation of bricklayers’ motivation and productivity. © Paul Olaniyi Olomolaiye. United Kingdom: Loughborough University.
  • Pan N-F. 2005. Assessment of productivity and duration of highway construction activities subject to impact of rain expert systems with. Applications. 28:313–326.
  • Pan Y, Jiang J, Wang R, Cao H. 2008. Advantages of support vector machine in QSPR studies for predicting auto-ignition temperatures of organic compounds. Chemometr Intell Lab Syst. 92(2):169–178.
  • Panas A, Pantouvakis J-P. 2018. On the use of learning curves for the estimation of construction productivity. Int J Constr Manage. 18(4):301–309.
  • Parthasarathy M, Murugasan R, Vasan R. 2018. Modelling manpower and equipment productivity in tall residential building projects in developing countries. J S Afr Inst Civil Eng. 60(2):23–33.
  • Popovici N, Moraru C, Munteanu I. 2019. The relationship between earnings and labour productivity in textile industry. DE Redactie. 9. Romania: The National R&D Institute for Textiles and Leather - INCDTP 16.
  • Portas J, AbouRizk S. 1997. Neural network model for estimating construction productivity. Constr Eng Manage. 123(4):399–410.
  • Pour SH, Shahid S, Chung E-S, Wang X-J. 2018. Model output statistics downscaling using support vector machine for the projection of spatial and temporal changes in rainfall of Bangladesh. Atmos Res. 213:149–162.
  • Rahman IA, Memon AH, Memon AQ, Shaikh MA, Siddiqui F. 2019. Factors Affecting the Labour productivity in construction projects of Pakistan. In: MATEC Web of Conferences, EDP Sciences, p. 05010
  • Rodriguez-Galiano VF, Ghimire B, Rogan J, Chica-Olmo M, Rigol-Sanchez JP. 2012. An assessment of the effectiveness of a random forest classifier for land-cover classification. ISPRS J Photogramm Remote Sens. 67:93–104.
  • Rozante JR, Vila DA, Chiquetto JB, Fernandes AD, Alvim DS. 2018. Evaluation of TRMM/GPM blended daily products over Brazil. Remote Sens. 10(6):882.
  • Shashank K, Hazra S, Pal KN. 2014. Analysis of key factors affecting the variation of labour productivity in construction projects. p. 152–160.
  • Shiwani H, Saunderson C, Anwar MM, Kon M, Bulugahapitiya S. 2016. 011 Role of coronary computed tomography angiography (CTA) in chest pain evaluation in females. BMJ Publishing Group Ltd and British Cardiovascular Society. Washington, USA: Hearts.
  • Sofia Lopes A, Teixeira P. 2013. Productivity, wages, and the returns to firm-provided training: fair shared capitalism?. Int J of Manpower. 34(7):776–793.
  • Stumpf A, Kerle N. 2011. Combining Random Forests and object-oriented analysis for landslide mapping from very high resolution imagery. Procedia Environ Sci. 3:123–129. doi:https://doi.org/http://dx.doi.org/10.1016/j.proenv.2011.02.022.
  • Sweis RJ, Sweis GJ, Hammad AAA, Rumman MA. 2009. Modeling the variability of labor productivity in masonry construction. Jordan Civil Eng. 3:197–212.
  • Tang S, Chen C, Zhan H, Zhang T. 2008. Determination of ocean primary productivity using support vector machines. Int J Remote Sens. 29(21):6227–6236.
  • Thomas HR, Yiakoumis I. 1987. Factor model of construction productivity. Constr Eng Manage. 113(4):623–639.
  • Tsehayae AA. 2015. Developing and optimizing context-specific and universal construction labour productivity models. Edmonton: University of Alberta.
  • Tsehayae AA, Fayek AR. 2016. System model for analysing construction labour productivity. Constr Innov 16(2):203–228.
  • Tsehayae AA, Fayek AR. 2018. Context adaptation of fuzzy inference system-based construction labor productivity models. Adv Fuzzy Syst. 2018:1–16.
  • USBLS 2016. Productivity law and legal definition. United States.
  • Vapnik V. 2013. The nature of statistical learning theory. USA: Springer-Verlag New York, Inc.
  • Vapnik VN, Vapnik V. 1998. Statistical learning theory. Vol. 1. New York: Wiley.
  • Wang F. 2005. On-Site labor productivity estimation using neural networks. Montreal, Quebec, Canada: Concordia University.
  • Watkins M, Mukherjee A, Onder N, Mattila K. 2009. Using agent-based modeling to study construction labor productivity as an emergent property of individual and crew interactions. J Constr Eng Manage. 135(7):657–667.
  • Watt MS, Dash JP, Watt P, Bhandari S. 2016. Multi-sensor modelling of a forest productivity index for radiata pine plantations. NZ J Sci. 46(1):9.
  • Westover JH, Westover AR, Westover LA. 2010. Enhancing long-term worker productivity and performance: The connection of key work domains to job satisfaction and organizational commitment. Int J Prod Perf Manage. 59(4):372–387.
  • Wheeler D, Mody A. 1992. International investment location decisions: The case of US firms. J Int Econ. 33(1/2):57–76.
  • Wilmot CG, Mei B. 2005. Neural network modeling of highway construction costs. J Constr Eng Manage. 131(7):765–771.
  • Wong JM, Chan AP, Chiang Y. 2007. Forecasting construction manpower demand: A vector error correction model. Build Environ. 42(8):3030–3041.
  • Zhai D, Goodrum PM, Haas CT, Caldas CH. 2009. Relationship between automation and integration of construction information systems and labor productivity. J Constr Eng Manage. 135(8):746–753.
  • Zhao H, Zhu G. 2000. Location factors and country-of-origin differences: an empirical analysis of FDI in China Multinational. Bus Rev. 8:60.

Reprints and Corporate Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

To request a reprint or corporate permissions for this article, please click on the relevant link below:

Academic Permissions

Please note: Selecting permissions does not provide access to the full text of the article, please see our help page How do I view content?

Obtain permissions instantly via Rightslink by clicking on the button below:

If you are unable to obtain permissions via Rightslink, please complete and submit this Permissions form. For more information, please visit our Permissions help page.